-
1
-
-
84939347686
-
Workshop Proceedings-Power System Planning Research Needs and Priorities
-
July
-
EPRI, “Workshop Proceedings-Power System Planning Research Needs and Priorities”, EPRI Report EL-3152, July 1983.
-
(1983)
EPRI Report EL-3152
-
-
-
2
-
-
84939392264
-
Research and Development Needs in Utility Expansion Planning Including New Energy Technologies
-
presented at the. July 26–30, Sr. Michaels, Maryland
-
S. T. Lee, C. K. Pang, G. R. Fegan, “Research and Development Needs in Utility Expansion Planning Including New Energy Technologies”, presented at the Conference on Research Needs for the Effective Integration of New Technologies into the Electric Utility”. July 26–30, 1982, Sr. Michaels, Maryland.
-
(1982)
Conference on Research Needs for the Effective Integration of New Technologies into the Electric Utility
-
-
Lee, S.T.1
Pang, C.K.2
Fegan, G.R.3
-
3
-
-
84939030038
-
The Superelectrification of Brazil
-
May
-
N. de Franco, “The Superelectrification of Brazil”, IEEE Spectrum, May 1982
-
(1982)
IEEE Spectrum
-
-
de Franco, N.1
-
4
-
-
0012166422
-
Impact of Construction Delays on the Reliability of a Hydro System. A Brazilian Planing Experience
-
paper 31-14, Paris, September
-
N. de Franco, A. Ventura Fọ, J. Kelman, P. A. S. Pegado, A. Vian, “Impact of Construction Delays on the Reliability of a Hydro System. A Brazilian Planing Experience”, paper 31-14, 1982 CIGRE Conference Paris, September 1982
-
(1982)
1982 CIGRE Conference
-
-
de Franco, N.1
Ventura Fọ, A.2
Kelman, J.3
Pegado, P.A.S.4
Vian, A.5
-
5
-
-
0020294296
-
Reliability Evaluation in Hydro-thermal Generating Systems
-
December
-
S. H. F. Cunha, F. B. M. Gomes, G. C. Oliveira, M. V. F. Pereira, “Reliability Evaluation in Hydro-thermal Generating Systems”, IEEE Transactions on PAS, vol. PAS-101, No. 12, December 1982, pp. 4665–4673
-
(1982)
IEEE Transactions on PAS
, vol.PAS-101
, Issue.12
, pp. 4665-4673
-
-
Cunha, S.H.F.1
Gomes, F.B.M.2
Oliveira, G.C.3
Pereira, M.V.F.4
-
6
-
-
0018467775
-
Linear Programming for Power System Network Security Applications
-
May/June
-
B. Stott, J. L. Marinho, “Linear Programming for Power System Network Security Applications”, IEEE Transactions on PAS, vol. PAS-98 May/June 1979, pp 837–848
-
(1979)
IEEE Transactions on PAS
, vol.PAS-98
, pp. 837-848
-
-
Stott, B.1
Marinho, J.L.2
-
7
-
-
0021292939
-
Application of Sensitivity Analysis of Load Supplying Capability to Interactive Transmission Expansion Planning
-
submitted to IEEE/PES 1984 Summer Meeting
-
M. V. F. Pereira, L. M. V. G. Pinto, “Application of Sensitivity Analysis of Load Supplying Capability to Interactive Transmission Expansion Planning”, submitted to IEEE/PES 1984 Summer Meeting.
-
-
-
Pereira, M.V.F.1
Pinto, L.M.V.G.2
-
8
-
-
0020193490
-
Interactive Transmission Network Planning Using a Least-Effort Criterion
-
October
-
A. Monticelli, A. Santos Jr., M.V.F. Pereira, S.H.F. Cunha, B.J. Parker, J.C.G. Praça, “Interactive Transmission Network Planning Using a Least-Effort Criterion”, IEEE Transactions on PAS, vol. PAS-101, No. 10, October 1982, pp 3919–3925
-
(1982)
IEEE Transactions on PAS
, vol.PAS-101
, Issue.10
, pp. 3919-3925
-
-
Monticelli, A.1
Santos, A.2
Pereira, M.V.F.3
Cunha, S.H.F.4
Parker, B.J.5
Praça, J.C.G.6
-
9
-
-
84939041184
-
Reliability Indices for Power System
-
May
-
EPRI, “Reliability Indices for Power System”, EPRI Report EL-1773, May 1981
-
(1981)
EPRI Report EL-1773
-
-
-
10
-
-
0043280814
-
Electric Generation Expansion Analysis System
-
August
-
EPRI, “Electric Generation Expansion Analysis System” EPRI Report EL-2561, August 1982
-
(1982)
EPRI Report EL-2561
-
-
-
11
-
-
4243748334
-
Transmission System Reliability Methods
-
July
-
EPRI, “Transmission System Reliability Methods”, EPRI Report EL-2526, July 1982
-
(1982)
EPRI Report EL-2526
-
-
-
12
-
-
84939330762
-
-
Linear Programming, Prentice-Hall
-
M. Simmonard, Linear Programming, Prentice-Hall, 1966
-
(1966)
-
-
Simmonard, M.1
-
14
-
-
0038580423
-
Recent Improvements of the Mexico Model for Probabilistic Planning Studies
-
April
-
J.D. Dodu, A. Merlin, “Recent Improvements of the Mexico Model for Probabilistic Planning Studies”, International Journal of Electric Power and Energy Systems, Vol. 1, No. 1, April 1979
-
(1979)
International Journal of Electric Power and Energy Systems
, vol.1
, Issue.1
-
-
Dodu, J.D.1
Merlin, A.2
-
15
-
-
0019008911
-
Interactive Computer Program for Planning the Expansion of Meshed Transmission Networks
-
April
-
C. Dechamps, E. Jamoulle, “Interactive Computer Program for Planning the Expansion of Meshed Transmission Networks”, International Journal of Electric Power and Energy Systems, vol. 2, No. 2, April 1980 pp 103–108
-
(1980)
International Journal of Electric Power and Energy Systems
, vol.2
, Issue.2
, pp. 103-108
-
-
Dechamps, C.1
Jamoulle, E.2
-
16
-
-
0018321631
-
Review of Linear Programming Applied to Power Systems Rescheduling
-
Cleveland, Ohio, May
-
B. Stott, J.L. Marinho, O. Alsac, “Review of Linear Programming Applied to Power Systems Rescheduling”, PICA Conference Proceedings, Cleveland, Ohio, May 1979.
-
(1979)
PICA Conference Proceedings
-
-
Stott, B.1
Marinho, J.L.2
Alsac, O.3
-
18
-
-
0042655228
-
Importance Sampling in Reliability Estimation; Reliability and Fault-Tree Analysis
-
M. Mazumdar, “Importance Sampling in Reliability Estimation; Reliability and Fault-Tree Analysis”, SIAM, pp 153–163, 1975.
-
(1975)
SIAM
, pp. 153-163
-
-
Mazumdar, M.1
-
19
-
-
0020709528
-
Comparison of Algorithms for Computing Genera ting-System Reliability Indexes
-
February
-
EPRI, “Comparison of Algorithms for Computing Genera ting-System Reliability Indexes”, EPRI Report EL-2874, February 1983.
-
(1983)
EPRI Report EL-2874
-
-
|