메뉴 건너뛰기




Volumn 23, Issue 2, 1985, Pages 253-264

Leadtirne errors in mrp: The lot-sizing effect

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; INDUSTRIAL ENGINEERING;

EID: 0022026068     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207548508904706     Document Type: Article
Times cited : (30)

References (29)
  • 2
    • 0002668750 scopus 로고
    • Lot-sizing procedures for requirements planning systems
    • Berrv, W. L., 1972, Lot-sizing procedures for requirements planning systems, Production and Inventory Management. 12(2). 19.
    • (1972) Production and Inventory Management , vol.12 , Issue.2
    • Berrv, W.L.1
  • 4
    • 84949394391 scopus 로고
    • An analysis of heuristic lot-sizing and sequencing rules of a hierarchical, multiproduct, multistage production system using material requirement planning. Ph.D
    • Ohio State University
    • Bkkis, J. R., 1975, An analysis of heuristic lot-sizing and sequencing rules of a hierarchical, multiproduct, multistage production system using material requirement planning. Ph.D, dissertation. Ohio State University.
    • (1975) Dissertation
    • Bkkis, J.R.1
  • 5
    • 84952189229 scopus 로고
    • Heuristic lot-sizing and sequencing rules in a multistage, production inventory system
    • Blocs, J. R., 1979. Heuristic lot-sizing and sequencing rules in a multistage, production inventory system, Decision Science, 10, 96.
    • (1979) Decision Science , vol.10
    • Blocs, J.R.1
  • 7
    • 0019590377 scopus 로고
    • Hierarchical production planning: A single stage system
    • Bitran, G. It., Haas, E. A., and Hax, A. C., 1981, Hierarchical production planning: a single stage system, Operations Research, 29, 717.
    • (1981) Operations Research , vol.29
    • Bitran, G.I.1    Haas, E.A.2    Hax, A.C.3
  • 9
    • 0002170207 scopus 로고
    • A comparison of MRP lot-sizing methods considering capacity change costs
    • Collier, D. A. 1980, A comparison of MRP lot-sizing methods considering capacity change costs, Journal of Operations Management, 1, 23.
    • (1980) Journal of Operations Management , vol.1
    • Collier, D.A.1
  • 10
    • 0347344463 scopus 로고
    • Research issues for multi-level lot sizing in MRP systems
    • Collier, D. A., 1982, Research issues for multi-level lot sizing in MRP systems, Journal of Operations Management, 2, 113.
    • (1982) Journal of Operations Management , vol.2
    • Collier, D.A.1
  • 11
    • 0002063626 scopus 로고
    • An economic tot-sizing technique
    • DkMatteis, J. J„ 1969, An economic tot-sizing technique. IHM System Journal. 7, 30.
    • (1969) IHM System Journal , vol.7
    • Dkmatteis, J.J.1
  • 13
    • 0020177008 scopus 로고
    • Toward understanding lead times in MRP systems
    • Kankt, J. J., 1982, Toward understanding lead times in MRP systems, Production and Inventory Management, 23(3), 1.
    • (1982) Production and Inventory Management , vol.23 , Issue.3
    • Kankt, J.J.1
  • 15
    • 84952209277 scopus 로고
    • A production management operating system simulntion
    • Carnegie-Mellon University, Pittsburgh, PA
    • Khikhkl, C. H., 1960. A production management operating system simulntion. Management Sciences Research Report 150, Carnegie-Mellon University, Pittsburgh, PA.
    • (1960) Management Sciences Research Report 150
    • Khikhkl, C.H.1
  • 16
    • 3342990397 scopus 로고
    • Manufacturing lead time estimation and the implementation of a material requirements planning system: A computer simulation study. PH.D
    • The University of Western Ontario, Canada
    • Melnyk, S. A., 1980, Manufacturing lead time estimation and the implementation of a material requirements planning system: a computer simulation study. PH.D. dissertation, The University of Western Ontario, Canada.
    • (1980) Dissertation
    • Melnyk, S.A.1
  • 17
    • 84952168834 scopus 로고
    • Lead time estimation, due date rules, and the successful implementation of a material requirements planning system
    • (Arlington, Virginia: AF1PS Press)
    • Melnyk, S. A., and Piper, C. J., 1080, Lead time estimation, due date rules, and the successful implementation of a material requirements planning system, Proceedings of the. 1980 Summer Simulation Conference (Arlington, Virginia: AF1PS Press), p. 653.
    • (1980) Proceedings of The. 1980 Summer Simulation Conference
    • Melnyk, S.A.1    Piper, C.J.2
  • 19
    • 84952165590 scopus 로고
    • Lead time estimate revision strategies for MRP: An evaluation, Proceedings American Institute
    • (Atlanta: American Institute for Decision Sciences)
    • Mklnyk, S. A., and Pipeh, C. J., 1982, Lead time estimate revision strategies for MRP: an evaluation, Proceedings American Institute, for Decision Sciences At ill west Conference (Atlanta: American Institute for Decision Sciences).
    • (1982) For Decision Sciences at Ill West Conference
    • Mklnyk, S.A.1    Pipeh, C.J.2
  • 21
    • 0016842326 scopus 로고
    • Design considerations for improving the effectiveness of MRP
    • Pktkrson, L. D., 1975, Design considerations for improving the effectiveness of MRP, Production and Inventory Management, 16(3), 48.
    • (1975) Production and Inventory Management , vol.16 , Issue.3
    • Pktkrson, L.D.1
  • 23
    • 84952192263 scopus 로고
    • A simulation study of multistage policies. Ph.D
    • The University of Western Ontario, Canada
    • Phout, H. W., 1972, A simulation study of multistage policies. Ph.D. dissertation, The University of Western Ontario, Canada.
    • (1972) Dissertation
    • Phout, H.W.1
  • 25
    • 84952242348 scopus 로고
    • An heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
    • Siia’kh, E. A., and Meal, C. M., 1973, An heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and Inventory Management, 14(2), 64.
    • (1973) Production and Inventory Management , vol.14 , Issue.2
    • Siiakh, E.A.1    Meal, C.M.2
  • 27
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark, D. C., and Williams, J. G., 1976, Material requirements planning under uncertainty, Decision Sciences, 7, 64.
    • (1976) Decision Sciences , vol.7
    • Whybark, D.C.1    Williams, J.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.