Volumn PAS-101, Issue 6, 1982, Pages 1420-1429

Strategic planning for power system reliability and vulnerability: An optimization model for resource planning under uncertainty

Author keywords

[No Author keywords available]

Indexed keywords

MATHEMATICAL MODELS - APPLICATIONS; MATHEMATICAL PROGRAMMING, LINEAR - APPLICATIONS; OPTIMIZATION - APPLICATIONS; RELIABILITY - ANALYSIS;

EID: 0020145528     PISSN: 00189510     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPAS.1982.317189     Document Type: Article
Times cited : (18)

References (11)
  • 1
    • 27744460716 scopus 로고
    • Costs and Benefits of Over/Under Capacity in Electric Power System Planning
    • EPRI report EA-927, October
    • “Costs and Benefits of Over/Under Capacity in Electric Power System Planning”, EPRI report EA-927, October 1978.
    • (1978)
  • 2
    • 34248203133 scopus 로고
    • Generation System Reliability Analysis for Future Cost/Benefit Studies
    • EPRI report EA-958, January
    • “Generation System Reliability Analysis for Future Cost/Benefit Studies”, EPRI report EA-958, January 1979.
    • (1979)
  • 3
    • 0018482023 scopus 로고
    • Planning for Generation Capacity Expansion in the Pacific Northwest” A Decision Analysis of the Costs of Over and Under-Building
    • Sanghvi, A.P., Limaye, D.R., “Planning for Generation Capacity Expansion in the Pacific Northwest” A Decision Analysis of the Costs of Over and Under-Building”, Journal of Energy Policy, 7(1979), 102–116.
    • (1979) Journal of Energy Policy , vol.7 , pp. 102-116
    • Sanghvi, A.P.1    Limaye, D.R.2
  • 4
    • 84939371098 scopus 로고
    • Economic Costs of Power Outages and the Value of Electric Service Reliability
    • draft final report submitted by ICF Incorporated and Mathtech Incorporated to EPRI, July
    • “Economic Costs of Power Outages and the Value of Electric Service Reliability”, draft final report submitted by ICF Incorporated and Mathtech Incorporated to EPRI, July 1980.
    • (1980)
  • 6
    • 0005010428 scopus 로고
    • Programming under Uncertainty: The Equivalent Convex Program
    • Wets, R.J.B., “Programming under Uncertainty: The Equivalent Convex Program”, Siam J. Appl. Math., 14 (1966), p. 89.
    • (1966) Siam J. Appl. Math. , vol.14 , pp. 89
    • Wets, R.J.B.1
  • 7
    • 0000832264 scopus 로고
    • Models for Determining Least Cost Investments in Electricity Supply
    • Anderson, D., “Models for Determining Least Cost Investments in Electricity Supply.” Bell J. of Economics, pp. 267–301, 1972.
    • (1972) Bell J. of Economics , pp. 267-301
    • Anderson, D.1
  • 8
    • 0002431201 scopus 로고
    • Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints
    • Operations Research
    • Charnes, A., Cooper, W.W., “Deterministic Equivalents for Optimizing and Satisficing under Chance Constraints,” Operations Research 11(1963), pp. 18–39.
    • (1963) , vol.11 , pp. 18-39
    • Charnes, A.1    Cooper, W.W.2
  • 9
    • 84939322532 scopus 로고
    • Planning for Power System Loss-of-Load Probability (LOLP), Using Chance Constraints
    • contained as an appendix in “National Energy Act Electric Reliability Study: Procedures for Assessing Strategic Reliability and Power System Vulnerability,” final report submitted by ICF Incorporated to Oak Ridge National Laboratory and Division of Power Supply Reliability (Economic Regulatory Administration, Department of Energy) August
    • Sanghvi, A., Shavel, I., Spann, R., “Planning for Power System Loss-of-Load Probability (LOLP), Using Chance Constraints,” contained as an appendix in “National Energy Act Electric Reliability Study: Procedures for Assessing Strategic Reliability and Power System Vulnerability,” final report submitted by ICF Incorporated to Oak Ridge National Laboratory and Division of Power Supply Reliability (Economic Regulatory Administration, Department of Energy) August 1980.
    • (1980)
    • Sanghvi, A.1    Shavel, I.2    Spann, R.3
  • 10
    • 85095907990 scopus 로고
    • The Cumulant Method of Calculating LOLP
    • paper presented at the IEEE Summer meeting, Vancouver, July 15
    • Stremmel, J.P., and Rau, N.S., “The Cumulant Method of Calculating LOLP,” paper presented at the IEEE Summer meeting, Vancouver, July 15, 1979.
    • (1979)
    • Stremmel, J.P.1    Rau, N.S.2
  • 11
    • 0019603140 scopus 로고
    • A Screening Model for Utility Strategic Planning
    • Paper NO. 81 WM 101-5, presented at the IEEE PES Winter Meeting, Atlanta, Georgia, February 6
    • L. L. Taylor, A. J. Westburg, S. T. Lee, J. E. Sustman, G. L. Ganz & D. C. Maschoff, “A Screening Model for Utility Strategic Planning”, Paper NO. 81 WM 101-5, presented at the IEEE PES Winter Meeting, Atlanta, Georgia, February 6, 1981.
    • (1981)
    • Taylor, L.L.1    Westburg, A.J.2    Lee, S.T.3    Sustman, J.E.4    Ganz, G.L.5    Maschoff, C.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.