-
1
-
-
0018924010
-
Load forecast bibliography, Phase I
-
IEEE Committee Report, “Load forecast bibliography, Phase I,” IEEE Trans. Power App. Syst., vol. PAS-99, no. 1, pp. 53-58, 1980.
-
(1980)
IEEE Trans. Power App. Syst.
, vol.99 PAS
, Issue.1
, pp. 53-58
-
-
Committee Report, IEEE.1
-
2
-
-
0017471774
-
Representative bibliography on load forecasting
-
M.S. Sachdev, R. Billinton, and C.A. Peterson, “Representative bibliography on load forecasting,” IEEE Trans. Power App. Syst., vol. PAS-96, no. 6, pp. 697-700, 1977.
-
(1977)
IEEE Trans. Power App. Syst.
, vol.96 PAS
, Issue.6
, pp. 697-700
-
-
Sachdev, M.S.1
Billinton, R.2
Peterson, C.A.3
-
3
-
-
84938014802
-
A review of the techniques for forecasting power and energy demands
-
paper no. 76-SP-141
-
M.S. Sachdev and R. Billinton, “A review of the techniques for forecasting power and energy demands,” Trans. Canadian Elect. Assoc, paper no. 76-SP-141, vol. 15, part 2, pp. 1-8, 1976.
-
(1976)
Trans. Canadian Elect. Assoc
, vol.15
, pp. 1-8
-
-
Sachdev, M.S.1
Billinton, R.2
-
4
-
-
84939355541
-
A review of short range electrical load models and some suggestions for future directions
-
T.A. Trygar, “A review of short range electrical load models and some suggestions for future directions,” in Proc. IEEE Int. Conf. Cybern. Soc, pp. 112-115, 1976.
-
(1976)
Proc. IEEE Int. Conf. Cybern. Soc
, pp. 112-115
-
-
Trygar, T.A.1
-
5
-
-
84938023760
-
Models for prediction of power system loads
-
Fredericton, NB, paper no. 5.2.
-
K. Srinivasan and R. Pronovost, “Models for prediction of power system loads,” in Proc. Canadian Conf. Automat. Contr., Fredericton, NB, 1973, paper no. 5.2.
-
(1973)
Proc. Canadian Conf. Automat. Contr.
-
-
Srinivasan, K.1
Pronovost, R.2
-
6
-
-
84914214695
-
Short term load forecasting
-
Hanniker, NH, Aug.
-
F.D. Galiana, “Short term load forecasting,” in Proc. Eng. Foundation Conf. Syst. Eng. Power: Status and Prospects, Hanniker, NH, Aug. 1975, pp. 105-115.
-
(1975)
Proc. Eng. Foundation Conf. Syst. Eng. Power: Status and Prospects
, pp. 105-115
-
-
Galiana, F.D.1
-
7
-
-
0038260804
-
The relationship between weather and electricity demand
-
M. Davies, “The relationship between weather and electricity demand,” Proc. IEEE, vol. 106C, pp. 27-37, 1958.
-
(1958)
Proc. IEEE
, vol.106 C
, pp. 27-37
-
-
Davies, M.1
-
8
-
-
84877941577
-
The relationship between summer weather and summer loads-A regression analysis
-
G.T. Heineman, D.A. Nordman, and E.C. Plant, “The relationship between summer weather and summer loads-A regression analysis,” IEEE Trans. Power App. Syst., vol. PAS-85, no. 11, pp. 1144-1154, 1966.
-
(1966)
IEEE Trans. Power App. Syst.
, vol.85 PAS
, Issue.11
, pp. 1144-1154
-
-
Heineman, G.T.1
Nordman, D.A.2
Plant, E.C.3
-
9
-
-
0015681982
-
Experience with weather sensitive load models for short- and long-term forecasting
-
S.L. Corpening, N.D. Reppen, and R.J. Ringlee, “Experience with weather sensitive load models for short- and long-term forecasting,” IEEE Trans. Power App. Syst., vol. PAS-92, no. 6, pp. 1966-1972, 1973.
-
(1973)
IEEE Trans. Power App. Syst.
, vol.92 PAS
, Issue.6
, pp. 1966-1972
-
-
Corpening, S.L.1
Reppen, N.D.2
Ringlee, R.J.3
-
10
-
-
84912167265
-
A method of non-stationary processes and its application to the problem of load estimation
-
E.D. Farmer, “A method of non-stationary processes and its application to the problem of load estimation,” Proc. 2nd Triennial World IF AC Congress, 1963, pp. 47-54.
-
(1963)
Proc. 2nd Triennial World IF AC Congress
, pp. 47-54
-
-
Farmer, E.D.1
-
12
-
-
0037585330
-
Development of Online load-prediction techniques with results from trials in the South-West region of the CEGB
-
E.D. Farmer and M.J. Potton, “Development of Online load-prediction techniques with results from trials in the South-West region of the CEGB,” Proc. IEEE, vol. 115, no. 10, pp. 1549-1588, 1968.
-
(1968)
Proc. IEEE
, vol.115
, Issue.10
, pp. 1549-1588
-
-
Farmer, E.D.1
Potton, M.J.2
-
14
-
-
0009336840
-
Techniques for load prediction in the electricity supply industry
-
P.D. Mattewman and H. Nicholson, “Techniques for load prediction in the electricity supply industry,” Proc. IEEE, vol. 115, no. 10, pp. 1451-1458, 1968.
-
(1968)
Proc. IEEE
, vol.115
, Issue.10
, pp. 1451-1458
-
-
Mattewman, P.D.1
Nicholson, H.2
-
16
-
-
0015095019
-
Adaptive forecasting of hourly loads based on load measurements and weather information
-
D.P. Lijesen and J. Rosing, “Adaptive forecasting of hourly loads based on load measurements and weather information,” IEEE Trans. Power App. Syst., vol. PAS-90, no. 4, pp. 1757-1767, 1971.
-
(1971)
IEEE Trans. Power App. Syst.
, vol.90 PAS
, Issue.4
, pp. 1757-1767
-
-
Lijesen, D.P.1
Rosing, J.2
-
17
-
-
0015022169
-
Short-term load forecasting, using general exponential smoothing
-
W.R. Christiaanse, “Short-term load forecasting, using general exponential smoothing,” IEEE Trans. Power App. Syst., vol. PAS-90, no. 2, pp. 900-910, 1971.
-
(1971)
IEEE Trans. Power App. Syst.
, vol.90 PAS
, Issue.2
, pp. 900-910
-
-
Christiaanse, W.R.1
-
20
-
-
84939347637
-
Adaptive forecasting of electric demands in New Brunswick
-
Montreal, PQ, Oct.
-
D.T. Phi, T.A. Austin, G.J. McAllister, D. Thorne, and W.A. Patterson, “Adaptive forecasting of electric demands in New Brunswick,” in Proc. Canadian Commun. and Power Conf., Montreal, PQ, Oct. 1978, pp. 200-203.
-
(1978)
Proc. Canadian Commun. and Power Conf.
, pp. 200-203
-
-
Phi, D.T.1
Austin, T.A.2
McAllister, G.J.3
Thorne, D.4
Patterson, W.A.5
-
25
-
-
0014617375
-
Long range forecasting of electrical demand by probability methods
-
K.N. Stanton and P.C. Gupta, “Long range forecasting of electrical demand by probability methods,” in Proc. Amer. Power Conf., vol. 31, 1969, pp. 964-969.
-
(1969)
Proc. Amer. Power Conf.
, vol.31
, pp. 964-969
-
-
Stanton, K.N.1
Gupta, P.C.2
-
26
-
-
0015056777
-
Medium range weekly and seasonal peak demand for forecasting by probability methods
-
K.N. Stanton, “Medium range weekly and seasonal peak demand for forecasting by probability methods,” IEEE Trans. Power App. Syst., vol. PAS-90, pp. 1183-1189, 1971.
-
(1971)
IEEE Trans. Power App. Syst.
, vol.90 PAS
, pp. 1183-1189
-
-
Stanton, K.N.1
-
27
-
-
10444232496
-
A stochastic approach to peak power demand forecasting in electrical utility systems
-
P.C. Gupta, “A stochastic approach to peak power demand forecasting in electrical utility systems,” IEEE Trans. Power App. Syst., vol. PAS-90, pp. 824-832, 1971.
-
(1971)
IEEE Trans. Power App. Syst.
, vol.90 PAS
, pp. 824-832
-
-
Gupta, P.C.1
-
28
-
-
0344390147
-
Load forecasting using stochastic models
-
paper no. TP1-A
-
S. Vemuri, E.F. Hill, and R. Balasubramanian, “Load forecasting using stochastic models,” in Proc. PICA Conf., 1973, paper no. TP1-A, pp. 31-37.
-
(1973)
Proc. PICA Conf.
, pp. 31-37
-
-
Vemuri, S.1
Hill, E.F.2
Balasubramanian, R.3
-
29
-
-
84938019106
-
The eventual forecast function of the stochastic models used in forecasting the power system peak demand
-
Fredericton, NB, paper no. 5.3.
-
S. Vemuri, E.F. Hill, and R. Balasubramanian, “The eventual forecast function of the stochastic models used in forecasting the power system peak demand,” Proc. Canadian Conf. Automat. Contr., Fredericton, NB, 1973, paper no. 5.3.
-
(1973)
Proc. Canadian Conf. Automat. Contr.
-
-
Vemuri, S.1
Hill, E.F.2
Balasubramanian, R.3
-
30
-
-
5644264050
-
One-step-ahead load forecasting for Online applications
-
Jan. paper no. C75 027-8.
-
A. Keyhani and A. El-Abiad, “One-step-ahead load forecasting for Online applications,” IEEE Winter Power Meeting, Jan. 1975, paper no. C75 027-8.
-
(1975)
IEEE Winter Power Meeting
-
-
Keyhani, A.1
El-Abiad, A.2
-
31
-
-
84939343592
-
Dynamic system load generation control, using variable pressure steam generators
-
July paper no. A75 590-0.
-
A. Keyhani, A. El-Abiad, and E.G. Lansing, “Dynamic system load generation control, using variable pressure steam generators,” IEEE Summer Power Meeting, July 1975, paper no. A75 590-0.
-
(1975)
IEEE Summer Power Meeting
-
-
Keyhani, A.1
El-Abiad, A.2
Lansing, E.G.3
-
32
-
-
84939318724
-
A preliminary algorithm for determining the order of a linear stochastic dynamic system
-
J.C. Chow, “A preliminary algorithm for determining the order of a linear stochastic dynamic system,” in Proc. IEEE Decision Contr. Conf., 1971, pp. 518-520.
-
(1971)
Proc. IEEE Decision Contr. Conf.
, pp. 518-520
-
-
Chow, J.C.1
-
33
-
-
49549169641
-
Real time recursive prediction of river flows
-
R.L. Kashyap and A.R. Rao, “Real time recursive prediction of river flows,”; Automatica, vol. 9, pp. 175-183, 1973.
-
(1973)
Automatica
, vol.9
, pp. 175-183
-
-
Kashyap, R.L.1
Rao, A.R.2
-
34
-
-
84939364528
-
Improved automatic generation control strategy, using decomposition techniques and Online forecasting
-
Berkeley, CA, Oct.
-
O. Mansour, “Improved automatic generation control strategy, using decomposition techniques and Online forecasting,” Proc. Lawrence Symp. Syst. Decision Sci., Berkeley, CA, Oct. 1977.
-
(1977)
Proc. Lawrence Symp. Syst. Decision Sci.
-
-
Mansour, O.1
-
35
-
-
85095908869
-
Real time modeling techniques for application to automatic generation control
-
July paper no. A76 458-0.
-
A. Keyhani, L. Stander, and A.H. El-Abiad, “Real time modeling techniques for application to automatic generation control,” IEEE PES Summer Power Meeting, July 1976, paper no. A76 458-0.
-
(1976)
IEEE PES Summer Power Meeting
-
-
Keyhani, A.1
Stander, L.2
El-Abiad, A.H.3
-
36
-
-
0017427108
-
A simulation study for recursive prediction of hourly load demands
-
A. Keyhani and T. Eliassi Rad, “A simulation study for recursive prediction of hourly load demands,” in Proc. PICA Conf., 1977, pp. 228-236.
-
(1977)
Proc. PICA Conf.
, pp. 228-236
-
-
Keyhani, A.1
Eliassi Rad, T.2
-
37
-
-
85095909026
-
Identification techniques of Box and Jenkins, applied to the problem of short-term load forecasting
-
July paper no. A77 618-2.
-
M. Hagan and R. Klein, “Identification techniques of Box and Jenkins, applied to the problem of short-term load forecasting,” IEEE Summer Power Meeting, July 1977, paper no. A77 618-2.
-
(1977)
IEEE Summer Power Meeting
-
-
Hagan, M.1
Klein, R.2
-
38
-
-
84939382095
-
Off-line and adaptive Box and Jenkins models for load forecasting
-
Berkeley, CA, Oct.
-
M. Hagan and R. Klein, “Off-line and adaptive Box and Jenkins models for load forecasting,” Proc. Lawrence Symp. Syst. and Decision Sci., Berkeley, CA, Oct. 1977.
-
(1977)
Proc. Lawrence Symp. Syst. and Decision Sci.
-
-
Hagan, M.1
Klein, R.2
-
39
-
-
0000169232
-
An algorithm for least squares estimation on nOnlinear parameters
-
D.W. Marquardt, “An algorithm for least squares estimation on nOnlinear parameters,” J. Soc. Ind. Appl. Math., vol. 11, p. 431, 1963.
-
(1963)
J. Soc. Ind. Appl. Math.
, vol.11
, pp. 431
-
-
Marquardt, D.W.1
-
40
-
-
0018018795
-
Online maximum likelihood estimation for load forecasting
-
M. Hagan and R. Klein, “Online maximum likelihood estimation for load forecasting,” IEEE Trans. Syst., Man, Cybern., vol. SMC-8, no. 9, pp. 711-715, 1978.
-
(1978)
IEEE Trans. Syst., Man, Cybern.
, vol.8 SMC
, Issue.9
, pp. 711-715
-
-
Hagan, M.1
Klein, R.2
-
41
-
-
0016355558
-
A recursive (Online) maximum likelihood identification method
-
J. Gertler and C.S. Banyasz, “A recursive (Online) maximum likelihood identification method,” IEEE Trans. Automat. Contr., vol. AC-19, pp. 816-820, 1974.
-
(1974)
IEEE Trans. Automat. Contr.
, vol.19 AC
, pp. 816-820
-
-
Gertler, J.1
Banyasz, C.S.2
-
42
-
-
85095909933
-
New advances in short-term load forecasting, using Box and Jenkins approach
-
New York, paper no. A78 051-5.
-
F. Meslier, “New advances in short-term load forecasting, using Box and Jenkins approach,” Proc. IEEE PES Winter Meeting, New York, 1978, paper no. A78 051-5.
-
(1978)
Proc. IEEE PES Winter Meeting
-
-
Meslier, F.1
-
43
-
-
0000615669
-
Function minimization by conjugate gradients
-
R. Fletcher and C.M. Reeves, “Function minimization by conjugate gradients,” Computer J., vol. 7, pp. 149-154, 1974.
-
(1974)
Computer J.
, vol.7
, pp. 149-154
-
-
Fletcher, R.1
Reeves, C.M.2
-
44
-
-
0017915001
-
System load forecasts for an electric utility
-
N.D. Uri, “System load forecasts for an electric utility,” Energy Sources, vol. 3, no. 314, pp. 313-322, 1978.
-
(1978)
Energy Sources
, vol.3
, Issue.314
, pp. 313-322
-
-
Uri, N.D.1
-
45
-
-
0018287592
-
Time series forecasting of utility load duration curves
-
S. Maybee and N.D. Uri, “Time series forecasting of utility load duration curves,” Can. Elec. Eng.J., vol. 4, no. 1, pp. 4-8, 1979.
-
(1979)
Can. Elec. Eng.J.
, vol.4
, Issue.1
, pp. 4-8
-
-
Maybee, S.1
Uri, N.D.2
-
46
-
-
0017910586
-
The innovation approach to power system load forecasting
-
Oklahoma City, OK
-
J.C. Liang and M.G. Strintzis, “The innovation approach to power system load forecasting,” in Proc. Control of Power Syst. Conf. Exposition, Oklahoma City, OK, 1978, pp. 109-113.
-
(1978)
Proc. Control of Power Syst. Conf. Exposition
, pp. 109-113
-
-
Liang, J.C.1
Strintzis, M.G.2
-
47
-
-
0014701042
-
The innovation approach to detection and estimation theory
-
T. Kailath, “The innovation approach to detection and estimation theory,” Proc. IEEE, vol. 58, no, 5, pp. 680-695, 1970.
-
(1970)
Proc. IEEE
, vol.58
, Issue.5
, pp. 680-695
-
-
Kailath, T.1
-
48
-
-
0018320469
-
Short-term load prediction for economic dispatch of generation
-
D.W. Ross, G.B. Ackerman, R. Bischke, R. Podmore, and K.D. Wall, “Short-term load prediction for economic dispatch of generation,” in Proc. PICA Conf., 1979, pp. 198-204.
-
(1979)
Proc. PICA Conf.
, pp. 198-204
-
-
Ross, D.W.1
Ackerman, G.B.2
Bischke, R.3
Podmore, R.4
Wall, K.D.5
-
49
-
-
0018322479
-
Short-term load prediction with a combination of different models
-
H.P. Van Meeteren and P.J.M. Van Son, “Short-term load prediction with a combination of different models,” in Proc. PICA Conf., 1979, pp. 192-197.
-
(1979)
Proc. PICA Conf.
, pp. 192-197
-
-
Van Meeteren, H.P.1
Van Son, P.J.M.2
-
50
-
-
84939333101
-
Application of a combined short-term load forecasting algorithm to different power system utilities
-
K.W. Edwin and M. El-Sayed, “Application of a combined short-term load forecasting algorithm to different power system utilities,” in Proc. IE AC Symp. Computer Applications in Large Scale Power Syst., India, vol. 1, pp. 248-254, 1979.
-
(1979)
Proc. IE AC Symp. Computer Applications in Large Scale Power Syst., India
, vol.1
, pp. 248-254
-
-
Edwin, K.W.1
El-Sayed, M.2
-
51
-
-
0016545444
-
Short-term load forecasting, using multiple correlation models
-
K. Srinivasan and R. Pronovost, “Short-term load forecasting, using multiple correlation models,” IEEE Trans. Power App. Syst., vol. PAS-94, no. 5, pp. 1854-1858, 1975.
-
(1975)
IEEE Trans. Power App. Syst.
, vol.94 PAS
, Issue.5
, pp. 1854-1858
-
-
Srinivasan, K.1
Pronovost, R.2
-
52
-
-
0015401106
-
Adaptive short-term forecasting of hourly loads, using weather information
-
P.C. Gupta and K. Yamada, “Adaptive short-term forecasting of hourly loads, using weather information,” IEEE Trans. Power App. Syst., vol. PAS-91, pp. 2085-2094, 1972.
-
(1972)
IEEE Trans. Power App. Syst.
, vol.91 PAS
, pp. 2085-2094
-
-
Gupta, P.C.1
Yamada, K.2
-
53
-
-
0018310276
-
A medium- and short-term load forecasting model for electrical industry
-
B. DeMartino, G. Fusco, E. Mariani, E. Randino, and P. Ricci, “A medium- and short-term load forecasting model for electrical industry,” in Proc. PICA Conf, 1979, pp. 186-191.
-
(1979)
Proc. PICA Conf
, pp. 186-191
-
-
DeMartino, B.1
Fusco, G.2
Mariani, E.3
Randino, E.4
Ricci, P.5
-
54
-
-
0014700838
-
Power system static state estimation, Part I: Exact model
-
F.C. Schweppe and J. Wildes, “Power system static state estimation, Part I: Exact model,” IEEE Trans. Power App. Syst., vol. PAS-89, pp. 120-125, 1970.
-
(1970)
IEEE Trans. Power App. Syst.
, vol.89 PAS
, pp. 120-125
-
-
Schweppe, F.C.1
Wildes, J.2
-
55
-
-
0014749517
-
State estimation in power systems, Part I: Theory and feasibility
-
R.E. Larson, W.F. Tinney, and J. Peschon, “State estimation in power systems, Part I: Theory and feasibility”, IEEE Trans. Power App. Syst., vol. PAS-89, pp. 345-352, 1970.
-
(1970)
IEEE Trans. Power App. Syst.
, vol.89 PAS
, pp. 345-352
-
-
Larson, R.E.1
Tinney, W.F.2
Peschon, J.3
-
56
-
-
85024429815
-
A new approach to linear filtering and prediction problems
-
R.E. Kalman, “A new approach to linear filtering and prediction problems,” Trans. AS ME, J. Basic Engineering, vol. 82, pp. 34-45, 1960.
-
(1960)
Trans. AS ME, J. Basic Engineering
, vol.82
, pp. 34-45
-
-
Kalman, R.E.1
-
57
-
-
85024423711
-
New results in linear filtering and prediction theory
-
R.E. Kalman and R.S. Bucy, “New results in linear filtering and prediction theory,” Trans. ASME, J. Basic Engineering, vol. 83, pp. 95-107, 1961.
-
(1961)
Trans. ASME, J. Basic Engineering
, vol.83
, pp. 95-107
-
-
Kalman, R.E.1
Bucy, R.S.2
-
58
-
-
0014848164
-
An application of state estimation to short-term load forecasting, Part I and Part II
-
J. Toyoda, M. Chen, and Y. Inouye, “An application of state estimation to short-term load forecasting, Part I and Part II,” IEEE Trans. Power App. Syst., vol. PAS-89, no. 7, pp. 1678-1688, 1970.
-
(1970)
IEEE Trans. Power App. Syst.
, vol.89 PAS
, Issue.7
, pp. 1678-1688
-
-
Toyoda, J.1
Chen, M.2
Inouye, Y.3
-
59
-
-
0014631463
-
Adaptive filtering with unknown priori statistics
-
A.P. Sage and G.W. Husa, “Adaptive filtering with unknown priori statistics,” Proc. JACC, 1969, pp. 760-769.
-
(1969)
Proc. JACC
, pp. 760-769
-
-
Sage, A.P.1
Husa, G.W.2
-
60
-
-
0014764781
-
On the identification of variances and adaptive Kalman filtering
-
R.K. Mehra, “On the identification of variances and adaptive Kalman filtering,” IEEE Trans. Automat. Contr., vol. AC-15, pp. 175-84, 1970.
-
(1970)
IEEE Trans. Automat. Contr.
, vol.15 AC
, pp. 175-184
-
-
Mehra, R.K.1
-
61
-
-
0015202493
-
A state estimation-type approach to practical load forecasting
-
J. Toyoda and M. Chen, “A state estimation-type approach to practical load forecasting,” in Proc. PICA Conf. 1971, pp. 356-364.
-
(1971)
Proc. PICA Conf.
, pp. 356-364
-
-
Toyoda, J.1
Chen, M.2
-
62
-
-
84944379881
-
Application of adaptive estimation technique for short-term load prediction
-
paper no. C72 455-4.
-
K.L.S. Sharma and A.K. Mahalanabis, “Application of adaptive estimation technique for short-term load prediction,” Proc. IEEE PES Summer Meeting, 1972, paper no. C72 455-4.
-
(1972)
Proc. IEEE PES Summer Meeting
-
-
Sharma, K.L.S.1
Mahalanabis, A.K.2
-
63
-
-
0014537240
-
Adaptive filtering
-
A.H. Jazwinsky, “Adaptive filtering,” Automatica, vol. 5, pp. 475-485, 1969.
-
(1969)
Automatica
, vol.5
, pp. 475-485
-
-
Jazwinsky, A.H.1
-
65
-
-
0015984262
-
Recursive short-term load forecasting algorithm
-
K.L.S. Sharma and A.K. Mahalanabis, “Recursive short-term load forecasting algorithm,” Proc. IEEE, vol. 121, no. 1, pp. 59-62, 1974.
-
(1974)
Proc. IEEE
, vol.121
, Issue.1
, pp. 59-62
-
-
Sharma, K.L.S.1
Mahalanabis, A.K.2
-
66
-
-
84939366053
-
Short-term load forecasting, using periodic model for the weekly load data
-
A.K. Mahalanabis, K.L.S. Sharma, and S. Varshney, “Short-term load forecasting, using periodic model for the weekly load data,” in Proc. IF AC Symp. on Computer Applications in Large Scale Power Systems, India, vol. 1, 1979, pp. 255-260.
-
(1979)
Proc. IF AC Symp. on Computer Applications in Large Scale Power Systems, India
, vol.1
, pp. 255-260
-
-
Mahalanabis, A.K.1
Sharma, K.L.S.2
Varshney, S.3
-
67
-
-
0017960264
-
Power system load forecasting, using smoothing techniques
-
G. Singh, K.K. Biswas, and A.K. Mahalanabis, “Power system load forecasting, using smoothing techniques,” Int. J. Syst. Sci., vol. 9, no. 4, pp. 363-368, 1978.
-
(1978)
Int. J. Syst. Sci.
, vol.9
, Issue.4
, pp. 363-368
-
-
Singh, G.1
Biswas, K.K.2
Mahalanabis, A.K.3
-
68
-
-
0142206439
-
A weather-dependent probabilistic model for short-term load forecasting
-
paper no. C72 171-2.
-
F.D. Galiana and F.C. Schweppe, “A weather-dependent probabilistic model for short-term load forecasting.” IEEE Winter Power Meeting, 1972, paper no. C72 171-2.
-
(1972)
IEEE Winter Power Meeting
-
-
Galiana, F.D.1
Schweppe, F.C.2
-
69
-
-
0016336003
-
Identification of stochastic electric load model from physical data
-
F.D. Galiana, E. Hanschin, and A.R. Fiechter, “Identification of stochastic electric load model from physical data,” IEEE Trans. Automat. Contr., vol. AC-19, no. 6, pp. 887-893, 1974.
-
(1974)
IEEE Trans. Automat. Contr.
, vol.19 AC
, Issue.6
, pp. 887-893
-
-
Galiana, F.D.1
Hanschin, E.2
Fiechter, A.R.3
-
70
-
-
0000387235
-
A rapidly convergent descent method for minimization
-
R. Fletcher and M.J.D. Powell, “A rapidly convergent descent method for minimization,” Computer J., vol. 6, no. 2, pp. 163-168, 1963.
-
(1963)
Computer J.
, vol.6
, Issue.2
, pp. 163-168
-
-
Fletcher, R.1
Powell, M.J.D.2
-
71
-
-
84939322555
-
Electrical power system load modelling by two-stage stochastic approximation procedure
-
V. Panuska and J.P. Koutchouk, “Electrical power system load modelling by two-stage stochastic approximation procedure,” Proc. 6th Triennial World IE AC Congress, Part IIA, 1975.
-
(1975)
Proc. 6th Triennial World IE AC Congress
-
-
Panuska, V.1
Koutchouk, J.P.2
-
72
-
-
0017415092
-
Short-term forecasting of electric power system load from a weather-dependent model
-
Melbourne, Feb.
-
V. Panuska, “Short-term forecasting of electric power system load from a weather-dependent model,” IF AC Symp. Automat. Contr. Protection of Electric Power Syst., Melbourne, Feb. 1977, pp. 414-418.
-
(1977)
IF AC Symp. Automat. Contr. Protection of Electric Power Syst.
, pp. 414-418
-
-
Panuska, V.1
-
73
-
-
84939397255
-
Short range load forecasting by maximum entropy method
-
K.V. Lu and N.D. Rao, “Short range load forecasting by maximum entropy method,” in Proc. IF AC Symp. on Computer Applications in Large Scale Power Systems, India, vol. 1, 1979, pp. 261-268.
-
(1979)
Proc. IF AC Symp. on Computer Applications in Large Scale Power Systems, India
, vol.1
, pp. 261-268
-
-
Lu, K.V.1
Rao, N.D.2
-
74
-
-
84942737910
-
Fitting auto-regressive models for prediction
-
H. Akaike, “Fitting auto-regressive models for prediction,” Ann. Inst. Statist. Math., vol. 21, pp. 243-247, 1969.
-
(1969)
Ann. Inst. Statist. Math.
, vol.21
, pp. 243-247
-
-
Akaike, H.1
-
75
-
-
51249190305
-
Statistical predictor identification
-
H. Akaike, “Statistical predictor identification,” Ann. Inst. Statist. Math., vol. 22, pp. 203-217, 1970.
-
(1970)
Ann. Inst. Statist. Math.
, vol.22
, pp. 203-217
-
-
Akaike, H.1
-
76
-
-
84939379940
-
Pattern recognition applied to forecasts
-
D. Sebesta, “Pattern recognition applied to forecasts,” Electric World (USA), vol. 191, no. 8, pp. 78-79, 1979.
-
(1979)
Electric World (USA)
, vol.191
, Issue.8
, pp. 78-79
-
-
Sebesta, D.1
-
77
-
-
84912398500
-
Short-term prediction of non-stationary load processes by the Zadeh-Ragazzini extension of the Wiener theory
-
W. Germany
-
V. Marchese and S. Pozzi, “Short-term prediction of non-stationary load processes by the Zadeh-Ragazzini extension of the Wiener theory,” in Proc. IF AC 5th Symp. on Identification and System Parameter Estimation, W. Germany, 1979, pp. 989-996.
-
(1979)
Proc. IF AC 5th Symp. on Identification and System Parameter Estimation
, pp. 989-996
-
-
Marchese, V.1
Pozzi, S.2
-
78
-
-
0001550221
-
An extension of Wiener's theory of prediction
-
L.A. Zadeh and J.R. Ragazzini, “An extension of Wiener's theory of prediction,” J. App. Phys., pp. 645-655, 1950.
-
(1950)
J. App. Phys.
, pp. 645-655
-
-
Zadeh, L.A.1
Ragazzini, J.R.2
-
79
-
-
84939369430
-
A model of power demand based on an alternating renewal process
-
J. Korn, “A model of power demand based on an alternating renewal process,” IEEE Trans. Syst., Man, Cvbern., vol. SMC-7, pp. 799-803, 1977.
-
(1977)
IEEE Trans. Syst., Man, Cvbern.
, vol.7 SMC
, pp. 799-803
-
-
Korn, J.1
-
80
-
-
85095913261
-
Modelling and estimation of the load demand of an area
-
Mexico City, July (A77 580-4).
-
J. Zaborsky, T.Y. Chiang, and A.K. Subramanian, “Modelling and estimation of the load demand of an area,” IEEEJ.PES Summer Power Meeting, Mexico City, July 1977 (A77 580-4).
-
(1977)
IEEEJ.PES Summer Power Meeting
-
-
Zaborsky, J.1
Chiang, T.Y.2
Subramanian, A.K.3
-
81
-
-
0017554830
-
Load modelling for real time monitoring of power svstems
-
G. Singh, K.K. Biswas, and A.K. Mahalanabis, “Load modelling for real time monitoring of power svstems,” IEEE Trans. Power App. Syst., vol. PAS-96, no. 6, pp. 1908-1914, 1977.
-
(1977)
IEEE Trans. Power App. Syst.
, vol.96 PAS
, Issue.6
, pp. 1908-1914
-
-
Singh, G.1
Biswas, K.K.2
Mahalanabis, A.K.3
-
82
-
-
84912375243
-
Short-term load forecasting for multinode, interconnected power systems
-
St. John's, Newfoundland, Canada
-
M.A. Abu-El-Magd and N.K. Sinha, “Short-term load forecasting for multinode, interconnected power systems,” in Proc. 3rd Int. Symp. on Large Engineering Systems. St. John's, Newfoundland, Canada, 1980, pp. 193-198.
-
(1980)
Proc. 3rd Int. Symp. on Large Engineering Systems
, pp. 193-198
-
-
Abu-El-Magd, M.A.1
Sinha, N.K.2
-
83
-
-
0019590267
-
Two new algorithms for Online modelling and forecasting of the load demand of a multinode power system
-
M.A. Abu-El-Magd and N.K. Sinha, “Two new algorithms for Online modelling and forecasting of the load demand of a multinode power system,” IEEE Trans. Power App. Syst. vol. PAS-100, no. 7, pp. 3246-3253, 1981.
-
(1981)
IEEE Trans. Power App. Syst.
, vol.100 PAS
, Issue.7
, pp. 3246-3253
-
-
Abu-El-Magd, M.A.1
Sinha, N.K.2
-
84
-
-
84939357800
-
An interactive algorithm for short-term load forecasting in multinode power systems
-
McMaster University, Hamilton, Ontario, Canada, Rep. SOC-260.
-
M.A. Abu-El-Magd, “An interactive algorithm for short-term load forecasting in multinode power systems,” Faculty of Engineering, McMaster University, Hamilton, Ontario, Canada, Rep. SOC-260.
-
Faculty of Engineering
-
-
Abu-El-Magd, M.A.1
-
85
-
-
84939339605
-
Multinode lead forecasting, using time series
-
G. Singh, M.R. Mukerjee, and N. Sharma, “Multinode lead forecasting, using time series,” in Proc. IF AC Symp. on Computer Applications in Large Scale Power Systems, India, vol. 1, 1979, pp. 288-294.
-
(1979)
Proc. IF AC Symp. on Computer Applications in Large Scale Power Systems, India
, vol.1
, pp. 288-294
-
-
Singh, G.1
Mukerjee, M.R.2
Sharma, N.3
-
87
-
-
84912402945
-
Univariate and multivariate time series techniques for modelling and forecasting short-term load demand
-
India, Jan. paper no. 5-4.
-
M.A. Abu-El-Magd and N.K. Sinha, “Univariate and multivariate time series techniques for modelling and forecasting short-term load demand,” IF AC Symp. on Theory and Application of Digital Control, India, Jan. 1982, paper no. 5-4.
-
(1982)
IF AC Symp. on Theory and Application of Digital Control
-
-
Abu-El-Magd, M.A.1
Sinha, N.K.2
-
88
-
-
0016355478
-
A new look at the stochastic model identification
-
H. Akaike, “A new look at the stochastic model identification,” IEEE Trans. Automat. Contr., vol. AC-19, pp. 716-732, 1974.
-
(1974)
IEEE Trans. Automat. Contr.
, vol.19 AC
, pp. 716-732
-
-
Akaike, H.1
-
89
-
-
0020301826
-
Modelling and forecasting short-term load demand: A multivariable approach
-
Japan, paper no. 98-2.
-
M.A. Abu-El-Magd and N.K. Sinha, “Modelling and forecasting short-term load demand: A multivariable approach,” Proc. 8th Triennial World IF AC Congress, Japan, 1981, paper no. 98-2.
-
(1981)
Proc. 8th Triennial World IF AC Congress
-
-
Abu-El-Magd, M.A.1
Sinha, N.K.2
-
90
-
-
0015160640
-
Estimation of the order of linear systems
-
C.M. Woodside, “Estimation of the order of linear systems,” Automatica, vol. 7, pp. 727-732, 1971.
-
(1971)
Automatica
, vol.7
, pp. 727-732
-
-
Woodside, C.M.1
-
93
-
-
84939333932
-
Physically based load modeling
-
July, Los Angeles (A78 518-3).
-
M.F. Ruane, Y. Manichaikul, F.C. Schweppe, and J. Woodward, “Physically based load modeling,” IEEEJ.PES Summer Power Meeting, July, 1978, Los Angeles (A78 518-3).
-
(1978)
IEEEJ.PES Summer Power Meeting
-
-
Ruane, M.F.1
Manichaikul, Y.2
Schweppe, F.C.3
Woodward, J.4
-
94
-
-
84939366394
-
Physically based modeling of cold load pickup
-
Atlanta, Jan. (8lWM084-3).
-
S. Ihara and F.C. Schweppe, “Physically based modeling of cold load pickup,” IEEEJ.PES Winter Power Meeting, Atlanta, Jan. 1980 (8lWM084-3).
-
(1980)
IEEEJ.PES Winter Power Meeting
-
-
Ihara, S.1
Schweppe, F.C.2
-
95
-
-
84939341362
-
A central limit theorem for distribution network load aggregation
-
Seattle, Mar.
-
D.S. Newman, Y.K. Chan, B. Dembart, and F.W. Scholz, “A central limit theorem for distribution network load aggregation,” Proc. SI AM, Int. Conf. on Electric Power Problems: The Mathematical Challenge, Seattle, Mar. 1980.
-
(1980)
Proc. SI AM, Int. Conf. on Electric Power Problems: The Mathematical Challenge
-
-
Newman, D.S.1
Chan, Y.K.2
Dembart, B.3
Scholz, F.W.4
-
96
-
-
84939396104
-
Development of a potential-function model for load prediction in an electricity distribution system
-
H.A. Prime and H.T. Tsui, “Development of a potential-function model for load prediction in an electricity distribution system,” Proc. IEEE, vol. 119, pp. 1178, 1972.
-
(1972)
Proc. IEEE
, vol.119
, pp. 1178
-
-
Prime, H.A.1
Tsui, H.T.2
|