메뉴 건너뛰기




Volumn PAS-92, Issue 6, 1973, Pages 1863-1875

Reliability Evaluation of Transmission Systems with Switching After Faults Approximations and a Computer Program

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER PROGRAMMING LANGUAGES - FLOWCHARTING; ELECTRIC FAULT CURRENTS; ELECTRIC NETWORKS - COMPUTER AIDED ANALYSIS; MATHEMATICAL TECHNIQUES - STATE SPACE METHODS;

EID: 0015681753     PISSN: 00189510     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPAS.1973.293566     Document Type: Article
Times cited : (39)

References (15)
  • 2
    • 0014881462 scopus 로고
    • Network Approaches to Finding the Reliability of Repairable Systems
    • Nov.
    • J.A. Buzacott, “Network Approaches to Finding the Reliability of Repairable Systems”. IEEE Trans. on Reliability, vol. 19, pp. 140–146, Nov. 1970.
    • (1970) IEEE Trans. on Reliability , vol.19 , pp. 140-146
    • Buzacott, J.A.1
  • 3
    • 0014873273 scopus 로고
    • The Markov Approach to Finding the Failure Times of Repairable Systems
    • Nov.
    • J.A. Buzacott, “The Markov Approach to Finding the Failure Times of Repairable Systems”. IEEE Trans. on Reliability, vol. 19, pp. 128–134, Nov. 1970.
    • (1970) IEEE Trans. on Reliability , vol.19 , pp. 128-134
    • Buzacott, J.A.1
  • 4
    • 0005757875 scopus 로고
    • Transmission System Reliability Evaluation Using Markov Processes
    • February
    • R. Billinton and K.E. Bollinger, “Transmission System Reliability Evaluation Using Markov Processes”. IEEE Trans. on Power Apparatus and Systems, vol. 87, pp. 538–547, February 1968.
    • (1968) IEEE Trans. on Power Apparatus and Systems , vol.87 , pp. 538-547
    • Billinton, R.1    Bollinger, K.E.2
  • 5
    • 0015094772 scopus 로고
    • Three-State Models in Power System Reliability Evaluations
    • July/Aug.
    • J. Endrenyi, “Three-State Models in Power System Reliability Evaluations”. IEEE Trans. on Power Apparatus and Systems, vol. 90, pp. 1909–16, July/Aug. 1971.
    • (1971) IEEE Trans. on Power Apparatus and Systems , vol.90 , pp. 1909-1916
    • Endrenyi, J.1
  • 8
    • 0014700921 scopus 로고
    • Transmission Planning Using a Reliability Criterion, Part I — A Reliability Criterion
    • Jan.
    • R. Billinton and M.P. Bhavaraju, “Transmission Planning Using a Reliability Criterion, Part I — A Reliability Criterion”. IEEE Trans. on Power Apparatus and Systems, vol. 89, pp. 28–34, Jan. 1970.
    • (1970) IEEE Trans. on Power Apparatus and Systems , vol.89 , pp. 28-34
    • Billinton, R.1    Bhavaraju, M.P.2
  • 9
    • 0014781752 scopus 로고
    • A Computer Program for Approximating System Reliability
    • May. Part II: Ibid, vol. 20, pp. 88–90, May 1971
    • A.C. Nelson, Jr., J.R. Batts and R.L. Beadles, “A Computer Program for Approximating System Reliability”. Part I: IEEE Trans. on Reliability, vol. 19, pp. 61–65, May 1970. Part II: Ibid, vol. 20, pp. 88–90, May 1971.
    • (1970) IEEE Trans. on Reliability , vol.19 , pp. 61-65
    • Nelson, A.C.1    Batts, J.R.2    Beadles, R.L.3
  • 10
    • 84866858509 scopus 로고
    • Scheduling Project Networks
    • April
    • M.M. Klein, “Scheduling Project Networks”. Communications of the ACM, vol. 10, pp. 225–231, April 1967.
    • (1967) Communications of the ACM , vol.10 , pp. 225-231
    • Klein, M.M.1
  • 11
    • 0014767388 scopus 로고
    • On Procedures for Reliability Evaluations of Transmission Systems
    • April
    • R.J. Ringlee and S.D. Goode, “On Procedures for Reliability Evaluations of Transmission Systems”. IEEE Trans. on Power Apparatus and Systems, vol. 89, pp. 527–537, April 1970.
    • (1970) IEEE Trans. on Power Apparatus and Systems , vol.89 , pp. 527-537
    • Ringlee, R.J.1    Goode, S.D.2
  • 12
    • 84910430698 scopus 로고
    • A New Technique for Reliability Calculations
    • Nov./Dec.
    • W.R. Christiaanse, “A New Technique for Reliability Calculations”. IEEE Trans. on Power Apparatus and Systems, vol. 89, pp. 1836–1847, Nov./Dec. 1970.
    • (1970) IEEE Trans. on Power Apparatus and Systems , vol.89 , pp. 1836-1847
    • Christiaanse, W.R.1
  • 13
    • 84938003011 scopus 로고
    • An examination of probability methods in the calculation of power system performance
    • IEEE Conference, July
    • R. C. Chan and S. B. Bram, “An examination of probability methods in the calculation of power system performance”, IEEE Conference, July 1970.
    • (1970)
    • Chan, R.C.1    Bram, S.B.2
  • 14
    • 78651554299 scopus 로고
    • Frequency and duration methods for power system reliability calculations: Power Apparatus and System
    • September
    • J. D. Hall, R. J. Ringlee, and A. J. Wood, “Frequency and duration methods for power system reliability calculations: Power Apparatus and System, Val, PAS-87, pp. 1787–1796, September 1968.
    • (1968) , vol.PAS-87 , pp. 1787-1796
    • Hall, J.D.1    Ringlee, R.J.2    Wood, A.J.3
  • 15
    • 84938448633 scopus 로고
    • Readiness of dormant systems subject to periodic checkout
    • Proceedings of the 1969 Annual Symposium on Reliability (January)
    • I. Bazovsky, “Readiness of dormant systems subject to periodic checkout”, Proceedings of the 1969 Annual Symposium on Reliability (January 1969).
    • (1969)
    • Bazovsky, I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.