메뉴 건너뛰기




Volumn , Issue , 1999, Pages 285-292

Pillar extraction and rock mechanics at the Doe Run Company in Missouri 1991 to 1999

Author keywords

[No Author keywords available]

Indexed keywords

EXTRACTION; MINING; NUMERICAL METHODS; ORE DEPOSITS; PILLAR EXTRACTION; ROCK MECHANICS; ROCKS;

EID: 0013454961     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (2)
  • 1
    • 0002824350 scopus 로고
    • Stope and pillar design for the elliot lake uranium mines
    • July 1972
    • Hedley, D G F and Grant, F, 1972. Stope and pillar design for the Elliot Lake Uranium mines, CIM Bulletin, July 1972.
    • (1972) CIM Bulletin
    • Hedley, D.G.F.1    Grant, F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.