1
-
-
0028516982
-
RATAS project-developing an infrastructure for computer-integrated construction
-
ASCE
-
Bjock, B. C. (1994). "RATAS project-developing an infrastructure for computer-integrated construction." J. Comp. in Civ. Engrg., ASCE, 8(4), 401-419.
-
(1994)
J. Comp. in Civ. Engrg.
, vol.8
, Issue.4
, pp. 401-419
-
-
Bjock, B.C.1
-
2
-
-
85033288401
-
Automation of the managerial process-control of a construction project: Automated manpower productivity control
-
E&FN Spon, London, England
-
Goldscmidt, E., and Navon, R. (1996). "Automation of the managerial process-control of a construction project: automated manpower productivity control." Proc., CIB W65 in Collaboration with W92 Symp. on Shaping Theory and Practice, E&FN Spon, London, England.
-
(1996)
Proc., CIB W65 in Collaboration with W92 Symp. on Shaping Theory and Practice
-
-
Goldscmidt, E.1
Navon, R.2
-
3
-
-
0006444306
-
ISICAD: Interactive system for integrated CAD and computer-based constrction system
-
Kartam, N. A. (1994). "ISICAD: interactive system for integrated CAD and computer-based constrction system." Microcomputers in Civ. Engrg., 9, 41-51.
-
(1994)
Microcomputers in Civ. Engrg.
, vol.9
, pp. 41-51
-
-
Kartam, N.A.1
-
4
-
-
5844297572
-
Integrated product and process modeling for construction robot control
-
Kozo Systems, Tokyo, Japan
-
Krom, R., and Tolman, F. (1991). "Integrated product and process modeling for construction robot control." Proc., 4th Int. Conf. on Comp. in civ. and Build. Engrg., Kozo Systems, Tokyo, Japan, 451-458.
-
(1991)
Proc., 4th Int. Conf. on Comp. in Civ. and Build. Engrg.
, pp. 451-458
-
-
Krom, R.1
Tolman, F.2
-
5
-
-
0029393280
-
COCSY I: CAM oriented CAD system
-
ASCE
-
Navon, R. (1995a). "COCSY I: CAM oriented CAD system." J. Comp. in Civ. Engrg., ASCE, 9(4), 236-243.
-
(1995)
J. Comp. in Civ. Engrg.
, vol.9
, Issue.4
, pp. 236-243
-
-
Navon, R.1
-
7
-
-
0029764712
-
Company level cash flow management
-
ASCE
-
Navon, R. (1996). "Company level cash flow management." J. Constr. Engrg, and Mgme., ASCE, 122(1), 22-29.
-
(1996)
J. Constr. Engrg, and Mgme.
, vol.122
, Issue.1
, pp. 22-29
-
-
Navon, R.1
-
8
-
-
0029403926
-
RCCS: Rebar CAD/ CAM system
-
Navon, R., Rubinovitz, Y., and Coffler, M. (1994). "RCCS: rebar CAD/ CAM system." Microcomputers in Civ. Engrg., 10(6), 385-400.
-
(1994)
Microcomputers in Civ. Engrg.
, vol.10
, Issue.6
, pp. 385-400
-
-
Navon, R.1
Rubinovitz, Y.2
Coffler, M.3
-
9
-
-
0005119058
-
Fully aoutmated rebar CAD/CAM system: Econoic evaluation and field implementa-tion
-
ASCE
-
Navon, R., Rubinovitz, Y., and Coffler, M. (1996). "Fully aoutmated rebar CAD/CAM system: econoic evaluation and field implementa-tion." J. Constr. Engr. and Mgmt., ASCE, 122(2), 101-108.
-
(1996)
J. Constr. Engr. and Mgmt.
, vol.122
, Issue.2
, pp. 101-108
-
-
Navon, R.1
Rubinovitz, Y.2
Coffler, M.3
-
10
-
-
0026369278
-
Integration of engineering, dising, and construction
-
ASCE
-
Reinschmidt, K., Griffits, F. H., and Bronner, P. L. (1991). "Integration of engineering, dising, and construction." J. Constr. Engrg. and Mgmt., ASCE, 117(4), 756-772.
-
(1991)
J. Constr. Engrg. and Mgmt.
, vol.117
, Issue.4
, pp. 756-772
-
-
Reinschmidt, K.1
Griffits, F.H.2
Bronner, P.L.3
-
11
-
-
4344572190
-
Optimization algorithms of task-planning for autonomous construction robots
-
Salford Univ., Salford, U.K.
-
Rosenfeld, Y., Shohet, I., and Warszawski, A. (1994). "Optimization algorithms of task-planning for autonomous construction robots." Int. J. of Constr. Information Technol., Salford Univ., Salford, U.K., 2(3), 1-19.
-
(1994)
Int. J. of Constr. Information Technol.
, vol.2
, Issue.3
, pp. 1-19
-
-
Rosenfeld, Y.1
Shohet, I.2
Warszawski, A.3
-
12
-
-
0028392868
-
Strategy for computer integrated construction technology
-
ASCE
-
Teicholz, P., and Fischer, M. (1994). "Strategy for computer integrated construction technology." J. Constr. Engrg. and Mgmt., ASCE, 120(1), 117-131.
-
(1994)
J. Constr. Engrg. and Mgmt.
, vol.120
, Issue.1
, pp. 117-131
-
-
Teicholz, P.1
Fischer, M.2
-
13
-
-
5244368335
-
Automation of the building process
-
IAARC, Tokyo, Japan
-
Warszawski, A. (1992). "Automation of the building process." Proc., 9th Int. Symp. on Automation and Robotics in Constr., IAARC, Tokyo, Japan, 29-34.
-
(1992)
Proc., 9th Int. Symp. on Automation and Robotics in Constr.
, pp. 29-34
-
-
Warszawski, A.1
-
14
-
-
0026222819
-
Robato for interior finishing works
-
ASCE
-
Warszawski, A., and Navon, R. (1991). "Robato for interior finishing works." J. Constr. Engrg. and Mgmt., ASCE, 117(3), 402-422.
-
(1991)
J. Constr. Engrg. and Mgmt.
, vol.117
, Issue.3
, pp. 402-422
-
-
Warszawski, A.1
Navon, R.2
-
15
-
-
5844244156
-
Survey of building robots
-
Elsevier, Amsterdam, The Netherlands
-
Warszawski, A., and Navon, R. (1996). "Survey of building robots." Proc., 13th Int. Symp. on Automation and Robotics in Constr., Elsevier, Amsterdam, The Netherlands.
-
(1996)
Proc., 13th Int. Symp. on Automation and Robotics in Constr.
-
-
Warszawski, A.1
Navon, R.2
-
16
-
-
0028396915
-
Robot for interior-finishing works in building: Feasibility analysis
-
ASCE
-
Warszawski, A., and Rosenfeld, Y. (1994). "Robot for interior-finishing works in building: feasibility analysis. J. Constr. Engrg. and Mgmt., ASCE, 120(1), 132-151.
-
(1994)
J. Constr. Engrg. and Mgmt.
, vol.120
, Issue.1
, pp. 132-151
-
-
Warszawski, A.1
Rosenfeld, Y.2
-
17
-
-
3843083840
-
The project model of an automated building system
-
Stanford Univ., Stanford, Calif.
-
Warszawski, A., and Sacks, R. (1995). "The project model of an automated building system." Proc., CIB W78 Workshop on Modeling of Build through Their Life-Cycle, Stanford Univ., Stanford, Calif., 77-89.
-
(1995)
Proc., CIB W78 Workshop on Modeling of Build Through Their Life-Cycle
, pp. 77-89
-
-
Warszawski, A.1
Sacks, R.2
|