-
1
-
-
85170504892
-
-
Although participation in Wepex working groups was open to all, Wepex policy decisions are made by the three voting members of the steering committee who represent the three major IOUs.
-
Although participation in Wepex working groups was open to all, Wepex policy decisions are made by the three voting members of the steering committee who represent the three major IOUs.
-
-
-
-
2
-
-
85170491961
-
-
For convenience the applications and their proposals will be attributed to Wepex as a whole although there are many remaining disagreements within this group.
-
For convenience the applications and their proposals will be attributed to Wepex as a whole although there are many remaining disagreements within this group.
-
-
-
-
3
-
-
85170507368
-
-
The Wepex PX actually uses "zonal" pricing, which is intended to be an extremely accurate approximation to nodal pricing. The examples in this article can be understood without reference to the zonal pricing complexities which will be taken up next month.
-
The Wepex PX actually uses "zonal" pricing, which is intended to be an extremely accurate approximation to nodal pricing. The examples in this article can be understood without reference to the zonal pricing complexities which will be taken up next month.
-
-
-
-
4
-
-
0008696857
-
-
A more complete diagnosis of the Wepex applications can be found in the author's report prepared for the Department of Energy See. (UCEI POWER Working Paper, PWP-042A)
-
A more complete diagnosis of the Wepex applications can be found in the author's report prepared for the Department of Energy See Stoft Steven. Analysis of the California Wepex Applications to FERC. Oct. 15, 1996;. (UCEI POWER Working Paper, PWP-042A).
-
(1996)
Analysis of the California Wepex Applications to FERC
-
-
Stoft, S.1
-
5
-
-
85170491779
-
-
Joint Application of Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Edison Company for Authorization to Convey Operational Control of Designated Jurisdictional Facilities to an Independent System Operator (April 29, 1996) (FERC Docket No. EC96-19-000, App. C, 17) (hereafter, "ISO Application")
-
Joint Application of Pacific Gas and Electric Company, San Diego Gas & Electric Company, and Southern California Edison Company for Authorization to Convey Operational Control of Designated Jurisdictional Facilities to an Independent System Operator (April 29, 1996) (FERC Docket No. EC96-19-000, App. C, 17) (hereafter, "ISO Application").
-
-
-
-
6
-
-
85170509342
-
-
Id., App. C, 8
-
Id., App. C, 8.
-
-
-
-
7
-
-
85170493870
-
-
Id., App. C, 9
-
Id., App. C, 9.
-
-
-
-
8
-
-
85170511954
-
-
Id., App. C, 10
-
Id., App. C, 10.
-
-
-
-
9
-
-
85170500865
-
-
Id., App. C, 12
-
Id., App. C, 12.
-
-
-
-
11
-
-
85170497512
-
-
PX Application, 6.3.1
-
PX Application, 6.3.1.
-
-
-
-
12
-
-
85170510467
-
-
ISO Application, App. C, 16
-
ISO Application, App. C, 16.
-
-
-
-
13
-
-
85170504044
-
-
Id., 6.4.1
-
Id., 6.4.1.
-
-
-
-
14
-
-
85170512753
-
-
Id., App. C, 8
-
Id., App. C, 8.
-
-
-
-
15
-
-
85170508889
-
-
Id., App. C
-
Id., App. C.
-
-
-
-
16
-
-
85170511812
-
-
Stoft, supra note 4
-
Stoft, supra note 4.
-
-
-
-
17
-
-
85170509073
-
-
Id
-
Id.
-
-
-
|