-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
J. Adams, E. Balas and D. Zawack, The shifting bottleneck procedure for job shop scheduling, Management Sci. 34 (1988) 391-401.
-
(1988)
Management Sci.
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
4
-
-
0020178733
-
The one-machine scheduling problem
-
J. Carlier, The one-machine scheduling problem, E.J.O.R, 11 (1982) 42-47.
-
(1982)
E.J.O.R
, vol.11
, pp. 42-47
-
-
Carlier, J.1
-
5
-
-
0015482117
-
Optimal scheduling for two-processor systems
-
E.G. Coffman, Jr. and R.L. Graham, optimal scheduling for two-processor systems, Acta Inform. 1 (1972) 200-213.
-
(1972)
Acta Inform.
, vol.1
, pp. 200-213
-
-
Coffman E.G., Jr.1
Graham, R.L.2
-
6
-
-
0027574649
-
A modified shifting bottleneck procedure for job-shop scheduling
-
S. Dauzère-Peres and J.B. Lasserre, A modified shifting bottleneck procedure for job-shop scheduling. Int. J. Prod. Res. 31 (1993) 923-932.
-
(1993)
Int. J. Prod. Res.
, vol.31
, pp. 923-932
-
-
Dauzère-Peres, S.1
Lasserre, J.B.2
-
7
-
-
0028769451
-
Integration of lotsizing and scheduling decisions in a job-shop
-
S. Dauzère-Peres and J.B. Lasserre, Integration of lotsizing and scheduling decisions in a job-shop, E.J.O.R. 75 (1994) 413-426.
-
(1994)
E.J.O.R.
, vol.75
, pp. 413-426
-
-
Dauzère-Peres, S.1
Lasserre, J.B.2
-
8
-
-
0002218558
-
Bicriterion static scheduling research for a single machine
-
P. Dileepan and T. Sen, Bicriterion static scheduling research for a single machine, Omega, 16 (1988) 53-59.
-
(1988)
Omega
, vol.16
, pp. 53-59
-
-
Dileepan, P.1
Sen, T.2
-
9
-
-
0042474314
-
Scheduling of parallel programs in single-bus multiprocessor systems
-
L. Finta and Z. Liu, Scheduling of parallel programs in single-bus multiprocessor systems, Rapport de Recherche INRIA, No. 2302 (1994).
-
(1994)
Rapport de Recherche INRIA
, vol.2302
-
-
Finta, L.1
Liu, Z.2
-
11
-
-
0000923069
-
Scheduling unit-time tasks with arbitrary release times and deadlines
-
M.R. Garey, D.R. Johnson, B.B. Simons and R.E. Tarjan, Scheduling unit-time tasks with arbitrary release times and deadlines, SIAM J. Comput. 10 (1981) 256-269.
-
(1981)
SIAM J. Comput.
, vol.10
, pp. 256-269
-
-
Garey, M.R.1
Johnson, D.R.2
Simons, B.B.3
Tarjan, R.E.4
-
12
-
-
74849101820
-
Optimization and approximation in deterministic scheduling: A survey
-
R.L. Graham, E.L. Lawler, J.K. Lenstra and A.H.G. Rinnooy Kan, Optimization and approximation in deterministic scheduling: a survey, Ann. Discrete. Math. 5 (1979) 287-326.
-
(1979)
Ann. Discrete. Math.
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
13
-
-
38249037690
-
Single machine scheduling research
-
S.K. Gupta and J. Kyparisis, Single machine scheduling research, Omega 15 (1987) 207-227.
-
(1987)
Omega
, vol.15
, pp. 207-227
-
-
Gupta, S.K.1
Kyparisis, J.2
-
14
-
-
0016034348
-
Some simple scheduling algorithms
-
W.A. Horn, Some simple scheduling algorithms, Naval Res. Logist. Quart. 21 (1974) 177-185.
-
(1974)
Naval Res. Logist. Quart.
, vol.21
, pp. 177-185
-
-
Horn, W.A.1
-
16
-
-
0016518855
-
NP-complete scheduling problems
-
J.D. Ullman, NP-complete scheduling problems, J. Comput. System Sci. 10 (1975) 384-393.
-
(1975)
J. Comput. System Sci.
, vol.10
, pp. 384-393
-
-
Ullman, J.D.1
-
18
-
-
0025673181
-
Multiprocessor scheduling with communication delays
-
B. Veltman, B. J. Lageweg and J.K. Lenstra, Multiprocessor scheduling with communication delays, Parallel Comput. 16 (1990) 173-182.
-
(1990)
Parallel Comput.
, vol.16
, pp. 173-182
-
-
Veltman, B.1
Lageweg, B.J.2
Lenstra, J.K.3
|