0003432192
-
-
Sept
-
North American Electric Reliability Council (NERC), Planning Standards, Sept. 1997.
-
(1997)
Planning Standards
-
-
-
7
-
-
85013244481
-
-
Id., at ix-x
-
Id., at ix-x.
-
-
-
-
8
-
-
85013291207
-
-
Id., at xv
-
Id., at xv.
-
-
-
-
9
-
-
0007009958
-
Ten myths about electric deregulation
-
April 15
-
George C. Loehr, Ten Myths about Electric Deregulation, PUB. UTIL. FORTNIGHTLY, April 15, 1998, at 29-32.
-
(1998)
Pub. Util. Fortnightly
, pp. 29-32
-
-
Loehr, G.C.1
-
11
-
-
85013244486
-
-
note
-
A safety problem with one type of reactor may also exist with other reactors of the same type, resulting in dependent failures, i.e., the unavailability of one reactor is positively correlated with that of another reactor.
-
-
-
-
12
-
-
21844478415
-
-
Power System Research Group, University of Saskatchewan, Saskatoon, Saskatchewan, Canada, undated paper
-
The output of wind turbine generation technology depends significantly on weather. One paper concludes that the actual contribution of a wind energy conversion system (WECS) to the reliability of a generation system depends on several factors: the wind regime at the location of the WECS, the degree of penetration of the WECS relative to the generation system, and the operating philosophy of the WECS. Not considering these factors would result in an inaccurate assessment of the reliability of a generation system with a WECS. See Roy Billinton, M. Gasper, and R. Ghajar, Wind System Reliability Evaluation: A Monte Carlo Approach, Power System Research Group, University of Saskatchewan, Saskatoon, Saskatchewan, Canada, undated paper.
-
Wind System Reliability Evaluation: A Monte Carlo Approach
-
-
Billinton, R.1
Gasper, M.2
Ghajar, R.3
-
14
-
-
85013302281
-
-
Equivalent forced outage rate measures the percentage of time a unit was unavailable due to forced outages and deratings during the time it was expected to be in service
-
Equivalent forced outage rate measures the percentage of time a unit was unavailable due to forced outages and deratings during the time it was expected to be in service.
-
-
-
-
16
-
-
85013244806
-
Entergy forms venture with shaw for new plants
-
June 2
-
Rebecca Smith, Entergy Forms Venture with Shaw for New Plants, WALL STREET J., June 2, 2000, at A4.
-
(2000)
Wall Street J.
, pp. A4
-
-
Smith, R.1
-
17
-
-
21844447012
-
Turbines generate questions
-
Aug. 7
-
Paul Ferrell, Turbines Generate Questions, NEWSDAY, Aug. 7, 2000, at A27.
-
(2000)
Newsday
, pp. A27
-
-
Ferrell, P.1
|