메뉴 건너뛰기




Volumn , Issue , 1998, Pages 86-98

TSS: A daily production target setting system for fabs

Author keywords

[No Author keywords available]

Indexed keywords

DECISION SUPPORT SYSTEMS; PRODUCTION CONTROL;

EID: 0004048735     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SMTW.1998.722660     Document Type: Conference Paper
Times cited : (3)

References (6)
  • 2
    • 85053448581 scopus 로고    scopus 로고
    • TechnicaZ Report Dept. of Electrical Engrg, National Taiwan University, Taipei, Taiwan, R. O. C., March
    • S.-C Chang et al, "Smart Monitoring and Control Aide - Final Report," TechnicaZ Report Dept. of Electrical Engrg, National Taiwan University, Taipei, Taiwan, R. O. C., March, 1996.
    • (1996) Smart Monitoring and Control Aide - Final Report
    • Chang, S.-C.1
  • 3
    • 85053443739 scopus 로고
    • Technical Report, Dept. of Electrical Engrg., National Taiwan University, Taipei, Taiwan. R.O.C
    • W.-L. Jan, S.-C. Chang, I.-C. Hsu, S.-R. Huang, K.-C. Lin, "TG&MA-Priority," Technical Report, Dept. of Electrical Engrg., National Taiwan University, Taipei, Taiwan. R.O.C., 1995.
    • (1995) TG&MA-Priority
    • Jan, W.-L.1    Chang, S.-C.2    Hsu, I.-C.3    Huang, S.-R.4    Lin, K.-C.5
  • 5
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry
    • Sept.
    • R Uzsoy, C. Lee, L. A. Martin-Vega, "A Review of Production Planning and Scheduling Models in the Semiconductor Industry," IIE Trans., Vol. 26, Sept. 1994, pp. 44-55.
    • (1994) IIE Trans. , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.2    Martin-Vega, L.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.