메뉴 건너뛰기




Volumn 23, Issue 1, 1996, Pages 93-102

On the complexity of manpower shift scheduling

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0003884721     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/0305-0548(94)00094-O     Document Type: Article
Times cited : (96)

References (18)
  • 1
    • 0022883022 scopus 로고
    • The general employee scheduling problem: An integration of MS and AL
    • F. Glover and C. McMillan, The general employee scheduling problem: An integration of MS and AL Comput. Ops Res. 13, 563-573 (1986).
    • (1986) Comput. Ops Res. , vol.13 , pp. 563-573
    • Glover, F.1    McMillan, C.2
  • 2
    • 0001518161 scopus 로고
    • On manpower scheduling algorithms
    • J. Tien and A. Kamiyama, On manpower scheduling algorithms. SIAM Review 24, 275-287 (1982).
    • (1982) SIAM Review , vol.24 , pp. 275-287
    • Tien, J.1    Kamiyama, A.2
  • 3
    • 0017547182 scopus 로고
    • Workforce scheduling with cyclic demands and day-off constraints
    • K. R. Baker and M. J. Magazine, Workforce scheduling with cyclic demands and day-off constraints. Mgmt Sci. 24, 161-167 (1977).
    • (1977) Mgmt Sci. , vol.24 , pp. 161-167
    • Baker, K.R.1    Magazine, M.J.2
  • 4
    • 0022060907 scopus 로고
    • Work force size and single shift schedules with variable demands
    • R. N. Burns and M. W. Carter, Work force size and single shift schedules with variable demands. Mgmt Sci. 31, 599-607 (1985).
    • (1985) Mgmt Sci. , vol.31 , pp. 599-607
    • Burns, R.N.1    Carter, M.W.2
  • 5
    • 0023171522 scopus 로고
    • A modular approach to optimal multiple-shift manpower scheduling
    • R. N. Burns and G. J. Koop, A modular approach to optimal multiple-shift manpower scheduling. Ops Res. 35, 100-110 (1987).
    • (1987) Ops Res. , vol.35 , pp. 100-110
    • Burns, R.N.1    Koop, G.J.2
  • 6
    • 0020797571 scopus 로고
    • Simple approaches to shift, day off and tour scheduling problems
    • J. G. Morris and M. J. Showalter. Simple approaches to shift, day off and tour scheduling problems. Mgmt Sci. 29, 942-950 (1983).
    • (1983) Mgmt Sci. , vol.29 , pp. 942-950
    • Morris, J.G.1    Showalter, M.J.2
  • 7
    • 0021429773 scopus 로고
    • A multi-level bottleneck assignment approach to the bus drivers' rostering problem
    • P. Carraresi and G. Gallo, A multi-level bottleneck assignment approach to the bus drivers' rostering problem. Eur. J. Ops Res. 16, 163-173 (1984).
    • (1984) Eur. J. Ops Res. , vol.16 , pp. 163-173
    • Carraresi, P.1    Gallo, G.2
  • 8
    • 0020495059 scopus 로고
    • A heuristic approach to the bus driver scheduling problem
    • S. Martello and P. Toth, A heuristic approach to the bus driver scheduling problem. Eur. J. Ops Res. 24, 106-117 (1986).
    • (1986) Eur. J. Ops Res. , vol.24 , pp. 106-117
    • Martello, S.1    Toth, P.2
  • 9
    • 84987014456 scopus 로고
    • A network model for rotating workforce scheduling problem
    • N. Balakrishnan and R. T. Wong, A network model for rotating workforce scheduling problem. Networks 20, 25-32 (1990).
    • (1990) Networks , vol.20 , pp. 25-32
    • Balakrishnan, N.1    Wong, R.T.2
  • 10
    • 0010604958 scopus 로고
    • Multiple shift workforce lower bounds
    • G. Koop, Multiple shift workforce lower bounds. Mgmt Sci. 34, 1221-1230 (1988).
    • (1988) Mgmt Sci. , vol.34 , pp. 1221-1230
    • Koop, G.1
  • 11
    • 0039057207 scopus 로고
    • ROMAN: An integrated approach to manpower planning and scheduling
    • Edited by O. Balci, R. Sharda and S. Zenios, Pergamon Press, Oxford
    • C. M. Khoong and H. C. Lau, ROMAN: An integrated approach to manpower planning and scheduling. In Computer Science and Operations Research: New Development in Their Interfaces (Edited by O. Balci, R. Sharda and S. Zenios), pp. 383-396. Pergamon Press, Oxford (1992).
    • (1992) Computer Science and Operations Research: New Development in Their Interfaces , pp. 383-396
    • Khoong, C.M.1    Lau, H.C.2
  • 12
    • 38149147358 scopus 로고
    • Automated manpower rostering: Techniques and experience
    • C. M. Khoong, H. C. Lau and L. W. Chew, Automated manpower rostering: Techniques and experience. Int. Trans. Opl. Res. 1, 353-361 (1994).
    • (1994) Int. Trans. Opl. Res. , vol.1 , pp. 353-361
    • Khoong, C.M.1    Lau, H.C.2    Chew, L.W.3
  • 13
    • 0001488083 scopus 로고
    • On the complexity of timetable and multicommodity flow problems
    • S. Even, A. Itai and A. Shamir, On the complexity of timetable and multicommodity flow problems. SIAM J. Comput. 5, 691-703 (1976).
    • (1976) SIAM J. Comput. , vol.5 , pp. 691-703
    • Even, S.1    Itai, A.2    Shamir, A.3
  • 15
    • 0040835581 scopus 로고
    • A simple but effective heuristic for workshift assignment
    • C. M. Khoong, A simple but effective heuristic for workshift assignment. Omega 21, 395 (1993).
    • (1993) Omega , vol.21 , pp. 395
    • Khoong, C.M.1
  • 18
    • 0040835587 scopus 로고
    • Preference-based scheduling via constraint satisfaction
    • edited by K. H. Phua et al., World Scientific
    • H. C. Lau, Preference-based scheduling via constraint satisfaction. In Optimization Techniques and Applications (Proc. ICOTA'92) (edited by K. H. Phua et al.), pp. 546-554. World Scientific (1992).
    • (1992) Optimization Techniques and Applications (Proc. ICOTA'92) , pp. 546-554
    • Lau, H.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.