-
1
-
-
0022883022
-
The general employee scheduling problem: An integration of MS and AL
-
F. Glover and C. McMillan, The general employee scheduling problem: An integration of MS and AL Comput. Ops Res. 13, 563-573 (1986).
-
(1986)
Comput. Ops Res.
, vol.13
, pp. 563-573
-
-
Glover, F.1
McMillan, C.2
-
2
-
-
0001518161
-
On manpower scheduling algorithms
-
J. Tien and A. Kamiyama, On manpower scheduling algorithms. SIAM Review 24, 275-287 (1982).
-
(1982)
SIAM Review
, vol.24
, pp. 275-287
-
-
Tien, J.1
Kamiyama, A.2
-
3
-
-
0017547182
-
Workforce scheduling with cyclic demands and day-off constraints
-
K. R. Baker and M. J. Magazine, Workforce scheduling with cyclic demands and day-off constraints. Mgmt Sci. 24, 161-167 (1977).
-
(1977)
Mgmt Sci.
, vol.24
, pp. 161-167
-
-
Baker, K.R.1
Magazine, M.J.2
-
4
-
-
0022060907
-
Work force size and single shift schedules with variable demands
-
R. N. Burns and M. W. Carter, Work force size and single shift schedules with variable demands. Mgmt Sci. 31, 599-607 (1985).
-
(1985)
Mgmt Sci.
, vol.31
, pp. 599-607
-
-
Burns, R.N.1
Carter, M.W.2
-
5
-
-
0023171522
-
A modular approach to optimal multiple-shift manpower scheduling
-
R. N. Burns and G. J. Koop, A modular approach to optimal multiple-shift manpower scheduling. Ops Res. 35, 100-110 (1987).
-
(1987)
Ops Res.
, vol.35
, pp. 100-110
-
-
Burns, R.N.1
Koop, G.J.2
-
6
-
-
0020797571
-
Simple approaches to shift, day off and tour scheduling problems
-
J. G. Morris and M. J. Showalter. Simple approaches to shift, day off and tour scheduling problems. Mgmt Sci. 29, 942-950 (1983).
-
(1983)
Mgmt Sci.
, vol.29
, pp. 942-950
-
-
Morris, J.G.1
Showalter, M.J.2
-
7
-
-
0021429773
-
A multi-level bottleneck assignment approach to the bus drivers' rostering problem
-
P. Carraresi and G. Gallo, A multi-level bottleneck assignment approach to the bus drivers' rostering problem. Eur. J. Ops Res. 16, 163-173 (1984).
-
(1984)
Eur. J. Ops Res.
, vol.16
, pp. 163-173
-
-
Carraresi, P.1
Gallo, G.2
-
8
-
-
0020495059
-
A heuristic approach to the bus driver scheduling problem
-
S. Martello and P. Toth, A heuristic approach to the bus driver scheduling problem. Eur. J. Ops Res. 24, 106-117 (1986).
-
(1986)
Eur. J. Ops Res.
, vol.24
, pp. 106-117
-
-
Martello, S.1
Toth, P.2
-
9
-
-
84987014456
-
A network model for rotating workforce scheduling problem
-
N. Balakrishnan and R. T. Wong, A network model for rotating workforce scheduling problem. Networks 20, 25-32 (1990).
-
(1990)
Networks
, vol.20
, pp. 25-32
-
-
Balakrishnan, N.1
Wong, R.T.2
-
10
-
-
0010604958
-
Multiple shift workforce lower bounds
-
G. Koop, Multiple shift workforce lower bounds. Mgmt Sci. 34, 1221-1230 (1988).
-
(1988)
Mgmt Sci.
, vol.34
, pp. 1221-1230
-
-
Koop, G.1
-
11
-
-
0039057207
-
ROMAN: An integrated approach to manpower planning and scheduling
-
Edited by O. Balci, R. Sharda and S. Zenios, Pergamon Press, Oxford
-
C. M. Khoong and H. C. Lau, ROMAN: An integrated approach to manpower planning and scheduling. In Computer Science and Operations Research: New Development in Their Interfaces (Edited by O. Balci, R. Sharda and S. Zenios), pp. 383-396. Pergamon Press, Oxford (1992).
-
(1992)
Computer Science and Operations Research: New Development in Their Interfaces
, pp. 383-396
-
-
Khoong, C.M.1
Lau, H.C.2
-
12
-
-
38149147358
-
Automated manpower rostering: Techniques and experience
-
C. M. Khoong, H. C. Lau and L. W. Chew, Automated manpower rostering: Techniques and experience. Int. Trans. Opl. Res. 1, 353-361 (1994).
-
(1994)
Int. Trans. Opl. Res.
, vol.1
, pp. 353-361
-
-
Khoong, C.M.1
Lau, H.C.2
Chew, L.W.3
-
13
-
-
0001488083
-
On the complexity of timetable and multicommodity flow problems
-
S. Even, A. Itai and A. Shamir, On the complexity of timetable and multicommodity flow problems. SIAM J. Comput. 5, 691-703 (1976).
-
(1976)
SIAM J. Comput.
, vol.5
, pp. 691-703
-
-
Even, S.1
Itai, A.2
Shamir, A.3
-
15
-
-
0040835581
-
A simple but effective heuristic for workshift assignment
-
C. M. Khoong, A simple but effective heuristic for workshift assignment. Omega 21, 395 (1993).
-
(1993)
Omega
, vol.21
, pp. 395
-
-
Khoong, C.M.1
-
18
-
-
0040835587
-
Preference-based scheduling via constraint satisfaction
-
edited by K. H. Phua et al., World Scientific
-
H. C. Lau, Preference-based scheduling via constraint satisfaction. In Optimization Techniques and Applications (Proc. ICOTA'92) (edited by K. H. Phua et al.), pp. 546-554. World Scientific (1992).
-
(1992)
Optimization Techniques and Applications (Proc. ICOTA'92)
, pp. 546-554
-
-
Lau, H.C.1
|