-
2
-
-
0009384782
-
Beyond prediction and preparation
-
Ackoff, R.L. (1983) Beyond prediction and preparation. Journal of Management Studies 20, 59–69.
-
(1983)
Journal of Management Studies
, vol.20
, pp. 59-69
-
-
Ackoff, R.L.1
-
4
-
-
33749558533
-
A comparison of attitudes to planning in industrialized and developing countries
-
Boston, MA
-
Arditi, D. (1981) A comparison of attitudes to planning in industrialized and developing countries. Proceedings of PMI INTERNET Joint Symposium, Boston, MA, pp. 641–9.
-
(1981)
Proceedings of PMI INTERNET Joint Symposium
, pp. 641-649
-
-
Arditi, D.1
-
5
-
-
0022029153
-
Construction productivity improvement
-
ASCE
-
Arditi, D. (1985) Construction productivity improvement. Journal of the Construction Division, ASCE 111, 1–14.
-
(1985)
Journal of the Construction Division
, vol.111
, pp. 1-14
-
-
Arditi, D.1
-
6
-
-
11644271794
-
Factors affecting success in network applications in a developing country
-
Arditi, D. and Koseoglu, H. (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics 1, 3–16.
-
(1983)
Construction Management and Economics
, vol.1
, pp. 3-16
-
-
Arditi, D.1
Koseoglu, H.2
-
7
-
-
84950182532
-
The value of project planning and control techniques in perspective
-
Munich
-
Baker, B.N., Murphy, D.C. and Fisher, D. (1979) The value of project planning and control techniques in perspective. Proceedings 6th INTERNET Congress, Munich, pp. 27–36.
-
(1979)
Proceedings 6th INTERNET Congress
, pp. 27-36
-
-
Baker, B.N.1
Murphy, D.C.2
Fisher, D.3
-
8
-
-
84950183612
-
Upward communication filtering in the project management environment
-
Barndt, S.E. (1981) Upward communication filtering in the project management environment. Project Management Quarterly XII, 39–43.
-
(1981)
Project Management Quarterly
, vol.12
, pp. 39-43
-
-
Barndt, S.E.1
-
13
-
-
84950214248
-
Why managers resist planning
-
Bologna, J. (1980) Why managers resist planning. Managerial Planning 28, 23–5.
-
(1980)
Managerial Planning
, vol.28
, pp. 23-25
-
-
Bologna, J.1
-
14
-
-
84930138893
-
Report on Planning and Scheduling
-
The Business Roundtable, The Business Roundtable
-
The Business Roundtable (1983) Report on Planning and Scheduling, Appendix A-6.1 – Report A-6 – Modern Management Systems. The Business Roundtable.
-
(1983)
Appendix A-6.1 – Report A-6 – Modern Management Systems
-
-
-
15
-
-
84930118427
-
Input-output scheduling – A new approach to construction scheduling of chemical projects
-
Boston, MA
-
Choudhury, S. (1981) Input-output scheduling – A new approach to construction scheduling of chemical projects. Proceedings of PMI INTERNET Joint Symposium, Boston, MA, pp. 347–53.
-
(1981)
Proceedings of PMI INTERNET Joint Symposium
, pp. 347-353
-
-
Choudhury, S.1
-
17
-
-
24644449459
-
Fundamentals of master scheduling for the project manager
-
Cori, K.A. (1985) Fundamentals of master scheduling for the project manager. Project Management Journal XVI, 78–89.
-
(1985)
Project Management Journal
, vol.16
, pp. 78-89
-
-
Cori, K.A.1
-
18
-
-
5244226017
-
Overcoming the luddite factor: Some behavioural aspects of the field supervisor’s role in co. planning
-
Cullen, J.D. and Nankervis, C.W. (1985) Overcoming the luddite factor: Some behavioural aspects of the field supervisor’s role in co. planning. International Journal of Project Management 3, 133–40.
-
(1985)
International Journal of Project Management
, vol.3
, pp. 133-140
-
-
Cullen, J.D.1
Nankervis, C.W.2
-
19
-
-
0016036637
-
CPM use in top 400 construction firms
-
ASCE
-
Davis, E.W. (1974) CPM use in top 400 construction firms. Journal of the Construction Division, ASCE 100, 39–49.
-
(1974)
Journal of the Construction Division
, vol.100
, pp. 39-49
-
-
Davis, E.W.1
-
22
-
-
84910712939
-
A stochastic analysis of activity duration
-
Duff, A.R. (1980) A stochastic analysis of activity duration. Construction Papers 1, 63–9.
-
(1980)
Construction Papers
, vol.1
, pp. 63-69
-
-
Duff, A.R.1
-
24
-
-
0001380781
-
Characteristics of organizational environment and perceived environmental uncertainty
-
Duncan, B. (1972), Characteristics of organizational environment and perceived environmental uncertainty. Administrative Science Quarterly 17, 313–27.
-
(1972)
Administrative Science Quarterly
, vol.17
, pp. 313-327
-
-
Duncan, B.1
-
25
-
-
0011594760
-
Probabilistic information processing systems: design and evaluation
-
SSC-4
-
Edwards, W., Phillips, L.D., Hags, W.L. and Goodman, B.C. (1968) Probabilistic information processing systems: design and evaluation. IEEE Transactions on Systems, Science and Cybernetics, SSC-4, pp. 248–65.
-
(1968)
IEEE Transactions on Systems, Science and Cybernetics
, pp. 248-265
-
-
Edwards, W.1
Phillips, L.D.2
Hags, W.L.3
Goodman, B.C.4
-
28
-
-
0345040907
-
Construction planning - mainly a question of how
-
The Institute of Building, England
-
Erskine-Murray, P.E. (1972) Construction planning - mainly a question of how, Occasional Paper No. 2, The Institute of Building, England.
-
(1972)
Occasional Paper No. 2
-
-
Erskine-Murray, P.E.1
-
30
-
-
84930121996
-
Short interval planning using SIPCPM
-
Department of Civil Engineering, Stanford University
-
Fondahl, J.W. (1982) Short interval planning using SIPCPM. Technical Report No. 270, Department of Civil Engineering, Stanford University.
-
(1982)
Technical Report No. 270
-
-
Fondahl, J.W.1
-
31
-
-
0004823127
-
Organization design: An information processing view
-
(edited by J.W. Lorsch and P.R. Lawrence). R.D. Irwin and Dorsey Press, Ontario
-
Galbraith, J.R. (1972) Organization design: An information processing view. In Organization Planning Cases and Concepts (edited by J.W. Lorsch and P.R. Lawrence). R.D. Irwin and Dorsey Press, Ontario.
-
(1972)
Organization Planning Cases and Concepts
-
-
Galbraith, J.R.1
-
34
-
-
0004551528
-
Buildability – the construction contribution
-
The Chartered Institute of Building, England
-
Gray, C. (1983) Buildability – the construction contribution. Occasional Paper No. 29, The Chartered Institute of Building, England.
-
(1983)
Occasional Paper No. 29
-
-
Gray, C.1
-
35
-
-
84950218221
-
Effectiveness in planning: problems of definition
-
Greenley, G.E. (1984) Effectiveness in planning: problems of definition. Managerial Planning, 27–9.
-
(1984)
Managerial Planning
, pp. 27-29
-
-
Greenley, G.E.1
-
36
-
-
33646176479
-
-
Department of Building, Heriot-Watt University, Science and Engineering Research Council, U.K.
-
Griffith, A. (1984) Buildability, the Effect of Design and Management on Construction, a Case Study. Department of Building, Heriot-Watt University, Science and Engineering Research Council, U.K.
-
(1984)
Buildability, the Effect of Design and Management on Construction, a Case Study
-
-
Griffith, A.1
-
41
-
-
0011422025
-
Proximal decision analysis
-
Howard, R.A. (1971) Proximal decision analysis. Management Science 17, 507–41.
-
(1971)
Management Science
, vol.17
, pp. 507-541
-
-
Howard, R.A.1
-
44
-
-
0345472163
-
Elements of effective corporate planning
-
Kudla, R.J. (1976) Elements of effective corporate planning. Long Range Planning, 82–93.
-
(1976)
Long Range Planning
, pp. 82-93
-
-
Kudla, R.J.1
-
47
-
-
46549091647
-
Introducing management information systems in medium sized construction companies
-
Laufer, A. and Tenah, K.A. (1985) Introducing management information systems in medium sized construction companies. International Journal of Project Management, 169–76.
-
(1985)
International Journal of Project Management
, pp. 169-176
-
-
Laufer, A.1
Tenah, K.A.2
-
49
-
-
0001951917
-
Organization and environment perspective
-
(edited by A.H. Van de Ven and W.F. Joyce). Wiley, New York
-
Lawrence, P.R. (1981) Organization and environment perspective. In Perspectives on Organization Design and Behavior (edited by A.H. Van de Ven and W.F. Joyce). Wiley, New York, pp. 311–37.
-
(1981)
Perspectives on Organization Design and Behavior
, pp. 311-337
-
-
Lawrence, P.R.1
-
51
-
-
11644265528
-
Real world uncertainties in project budgets and schedules
-
Boston, MA
-
Lichtenberg, S. (1981) Real world uncertainties in project budgets and schedules. Proceedings of PMI INTERMET Joint Symposium, Boston, MA, pp. 179–93.
-
(1981)
Proceedings of PMI INTERMET Joint Symposium
, pp. 179-193
-
-
Lichtenberg, S.1
-
52
-
-
0001152625
-
Impact of the organization environment on the long-range planning process: A contingency view
-
Lindsay, W.M. and Rue, L.W. (1980) Impact of the organization environment on the long-range planning process: A contingency view. Academy of Management Journal 23, 385–404.
-
(1980)
Academy of Management Journal
, vol.23
, pp. 385-404
-
-
Lindsay, W.M.1
Rue, L.W.2
-
56
-
-
0002902662
-
Planning on the left side and managing on the right
-
Mintzberg, H. (1976) Planning on the left side and managing on the right. Harvard Business Review, 49–58.
-
(1976)
Harvard Business Review
, pp. 49-58
-
-
Mintzberg, H.1
-
57
-
-
84989143797
-
Research notes and communications, what is planning anyway?
-
Mintzberg, H. (1981) Research notes and communications, what is planning anyway? Strategic Management Journal 2, 319–24.
-
(1981)
Strategic Management Journal
, vol.2
, pp. 319-324
-
-
Mintzberg, H.1
-
58
-
-
0005906988
-
A note on that dirty word efficiency
-
Mintzberg, H. (1982) A note on that dirty word efficiency. Interfaces 12, 101–5.
-
(1982)
Interfaces
, vol.12
, pp. 101-105
-
-
Mintzberg, H.1
-
59
-
-
84930121526
-
Human dynamics in project planning
-
(edited by D.I. Cleland and W.R. King). Van Nostrand Reinhold Co, New York
-
Morton, G.H.A. (1983) Human dynamics in project planning. In Project Management Handbook (edited by D.I. Cleland and W.R. King). Van Nostrand Reinhold Co, New York, pp. 265–82.
-
(1983)
Project Management Handbook
, pp. 265-282
-
-
Morton, G.H.A.1
-
60
-
-
33646728520
-
-
Cahners, Boston, MA
-
O’Brien, J.J. (1976) Construction Delay Responsibilities, Risks, and Litigation. Cahners, Boston, MA.
-
(1976)
Construction Delay Responsibilities, Risks, and Litigation
-
-
O’Brien, J.J.1
-
64
-
-
84930132654
-
Is total CPM really the answer for super projects?
-
Parsons, R. (1983) Is total CPM really the answer for super projects? Civil Engineering 53, 70–1.
-
(1983)
Civil Engineering
, vol.53
, pp. 70-71
-
-
Parsons, R.1
-
66
-
-
0001644112
-
Multi-objective assessment of effectiveness of strategic planning: A discriminant analysis approach
-
Ramanujam, V., Venkatraman, N. and Camillus, J.C. (1986) Multi-objective assessment of effectiveness of strategic planning: A discriminant analysis approach. Academy of Management Journal 29, 347–72.
-
(1986)
Academy of Management Journal
, vol.29
, pp. 347-372
-
-
Ramanujam, V.1
Venkatraman, N.2
Camillus, J.C.3
-
68
-
-
0021610376
-
The time performance of construction projects
-
Sidwell, A.C. (1984) The time performance of construction projects. Architectural Science Review 27, 85–91.
-
(1984)
Architectural Science Review
, vol.27
, pp. 85-91
-
-
Sidwell, A.C.1
-
71
-
-
84989064196
-
Research notes and communications, what is planning anyway? A rejoinder
-
Snyder, N.H. (1982) Research notes and communications, what is planning anyway? A rejoinder. Strategic Management Journal 3, 265–7.
-
(1982)
Strategic Management Journal
, vol.3
, pp. 265-267
-
-
Snyder, N.H.1
-
75
-
-
0022756860
-
Management of construction productivity
-
ASCE
-
Tucker, R.L. (1986) Management of construction productivity. Journal of Management in Engineering, ASCE 2, 148–54.
-
(1986)
Journal of Management in Engineering
, vol.2
, pp. 148-154
-
-
Tucker, R.L.1
-
76
-
-
84950201326
-
Building information management systems for major advanced energy projects
-
Boston, MA
-
Tuman, J. Jr. (1981) Building information management systems for major advanced energy projects. Proceedings of PMI INTERNET Joint Symposium, Boston, MA, pp. 325–335.
-
(1981)
Proceedings of PMI INTERNET Joint Symposium
, pp. 325-335
-
-
Tuman, J.1
-
78
-
-
84929980567
-
The critical path method and construction contracts: A polemic
-
White, A. (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics 3, 15–24.
-
(1985)
Construction Management and Economics
, vol.3
, pp. 15-24
-
-
White, A.1
|