-
1
-
-
0001259868
-
An algorithm for partitioning the nodes of a graph
-
E.R. Barnes, An algorithm for partitioning the nodes of a graph, SIAM J. Algebra Discrete Math. 3 (1982) 541-550.
-
(1982)
SIAM J. Algebra Discrete Math.
, vol.3
, pp. 541-550
-
-
Barnes, E.R.1
-
2
-
-
0008721839
-
Partitioning, spectra, and linear programming
-
R.W. Pulleyblank, ed., Academic Press, Canada
-
E.R. Barnes and A.J. Hoffman, Partitioning, spectra, and linear programming, in: R.W. Pulleyblank, ed., Progress in Combinatorial Optimization (Academic Press, Canada, 1984) 13-25.
-
(1984)
Progress in Combinatorial Optimization
, pp. 13-25
-
-
Barnes, E.R.1
Hoffman, A.J.2
-
3
-
-
0042888462
-
Time bound on selection
-
M. Blum, R. Floyd, V. Pratt, R. Rivest and R. Tarjan, Time bound on selection, J. Comput. and System Sci. 7 (1972) 240-267.
-
(1972)
J. Comput. and System Sci.
, vol.7
, pp. 240-267
-
-
Blum, M.1
Floyd, R.2
Pratt, V.3
Rivest, R.4
Tarjan, R.5
-
4
-
-
0025638782
-
CON due-date determination and sequencing
-
P. De, J.B. Gosh and C.E. Wells, CON due-date determination and sequencing, Comput. Oper. Res. 17 (1990) 333-342.
-
(1990)
Comput. Oper. Res.
, vol.17
, pp. 333-342
-
-
De, P.1
Gosh, J.B.2
Wells, C.E.3
-
5
-
-
0001254311
-
On the minimization of completion time variance with bi-criteria extension
-
P. De, J.B. Gosh and C.E. Wells, On the minimization of completion time variance with bi-criteria extension, Oper. Res. 40 (1992) 1148-1155.
-
(1992)
Oper. Res.
, vol.40
, pp. 1148-1155
-
-
De, P.1
Gosh, J.B.2
Wells, C.E.3
-
8
-
-
0026223840
-
Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date
-
N.G. Hall and M.E. Posner, Earliness-tardiness scheduling problems, I: weighted deviation of completion times about a common due date, Oper. Res. 39 (1991) 836-846.
-
(1991)
Oper. Res.
, vol.39
, pp. 836-846
-
-
Hall, N.G.1
Posner, M.E.2
-
12
-
-
0001217188
-
SWEAT - A program for scheduling with earliness and tardiness penalties
-
H.G. Kahlbacher, SWEAT - a program for scheduling with earliness and tardiness penalties, European J. Oper. Res. 43 (1989) 111-112.
-
(1989)
European J. Oper. Res.
, vol.43
, pp. 111-112
-
-
Kahlbacher, H.G.1
-
13
-
-
0019704009
-
Minimizing variation of flow time in single machine systems
-
J.J Kanet, Minimizing variation of flow time in single machine systems, Management Sci. 27 (1981) 1453-1459.
-
(1981)
Management Sci.
, vol.27
, pp. 1453-1459
-
-
Kanet, J.J.1
-
14
-
-
0003590131
-
-
Report UCB/CSD 82/113, Computer Science Division, Univ. of California, Berkeley
-
N. Karmakar and R.M. Karp, The differencing method of set partitioning, Report UCB/CSD 82/113, Computer Science Division, Univ. of California, Berkeley (1982)
-
(1982)
The Differencing Method of Set Partitioning
-
-
Karmakar, N.1
Karp, R.M.2
-
15
-
-
0003037529
-
Reducibility among combinatorial problems
-
R.E. Miller and J.W. Thatcher, eds., Plenum Press, New York
-
R.M. Karp, Reducibility among combinatorial problems, in: R.E. Miller and J.W. Thatcher, eds., Complexity of Computer Computations (Plenum Press, New York, 1972) 85-103.
-
(1972)
Complexity of Computer Computations
, pp. 85-103
-
-
Karp, R.M.1
-
16
-
-
0000953023
-
New results on the completion time variance minimization
-
W. Kubiak, New results on the completion time variance minimization, Discrete Applied Math. 58 (1995) 157-168.
-
(1995)
Discrete Applied Math.
, vol.58
, pp. 157-168
-
-
Kubiak, W.1
-
17
-
-
0027644930
-
Completion time variance minimization on a single machine is difficult
-
W. Kubiak, Completion time variance minimization on a single machine is difficult, Oper. Res. Lett. 14 (1993) 49-59.
-
(1993)
Oper. Res. Lett.
, vol.14
, pp. 49-59
-
-
Kubiak, W.1
-
18
-
-
0014571702
-
A functional equation and its application to resource allocation and machine scheduling problems
-
E.L. Lawler and J.M. Moore, A functional equation and its application to resource allocation and machine scheduling problems, Management Sci. 16 (1969) 77-84.
-
(1969)
Management Sci.
, vol.16
, pp. 77-84
-
-
Lawler, E.L.1
Moore, J.M.2
-
23
-
-
0002066821
-
Various optimizers for single-stage production
-
W.E. Smith, Various optimizers for single-stage production, Naval Res. Logist. Quart. 18 (1956) 295-305.
-
(1956)
Naval Res. Logist. Quart.
, vol.18
, pp. 295-305
-
-
Smith, W.E.1
|