메뉴 건너뛰기




Volumn 3, Issue , 1999, Pages 187-196

Activity-based modeling approach for construction

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; INDUSTRIAL APPLICATIONS; MATHEMATICAL MODELS; RANDOM PROCESSES; STRUCTURAL ANALYSIS; STRUCTURAL DESIGN;

EID: 0002541756     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (3)

References (10)
  • 1
    • 0028419455 scopus 로고
    • Graphical simulation model specification based on activity cycle diagrams
    • Au, Grace and Ray I. Paul (1994). "Graphical Simulation Model Specification Based on Activity Cycle Diagrams." Computers Industry Engineering. 26(2). 295-306.
    • (1994) Computers Industry Engineering , vol.26 , Issue.2 , pp. 295-306
    • Au, G.1    Paul, R.I.2
  • 2
    • 0017539255 scopus 로고
    • CYCLONE - A method for modeling job site processes
    • ASCE
    • Halpin, D.W. (1977). "CYCLONE - A Method for Modeling Job Site Processes." J. Constr. Div., ASCE. 103(3). 489-499.
    • (1977) J. Constr. Div. , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 4
    • 0022776438 scopus 로고
    • Future direction for computerized construction research
    • ASCE
    • Ibbs, C.W. (1987). "Future direction for computerized construction research." J. Constr. Engrg. & Mgmt, ASCE. 112(3). 326-345.
    • (1987) J. Constr. Engrg. & Mgmt , vol.112 , Issue.3 , pp. 326-345
    • Ibbs, C.W.1
  • 7
    • 0003119697 scopus 로고    scopus 로고
    • Resource-based modeling for construction simulation
    • ASCE
    • Shi, J. and S.M. AbouRizk (1997). "Resource-based Modeling for Construction Simulation." J. Constr. Engrg. & Mgmt, ASCE. 123(1). 26-33.
    • (1997) J. Constr. Engrg. & Mgmt , vol.123 , Issue.1 , pp. 26-33
    • Shi, J.1    AbouRizk, S.M.2
  • 8
  • 9
    • 0027610292 scopus 로고
    • Simulation technologies for planning heavy construction processes
    • ASCE
    • Vanegas, J.A., E.B. Bravo, and D.W. Halpin (1993). "Simulation Technologies for Planning Heavy Construction Processes." J. Constr. Engrg. & Mgmt., ASCE. Vol. 119(2). 336-354.
    • (1993) J. Constr. Engrg. & Mgmt. , vol.119 , Issue.2 , pp. 336-354
    • Vanegas, J.A.1    Bravo, E.B.2    Halpin, D.W.3
  • 10
    • 0023453859 scopus 로고
    • Hierarchical, modular discrete-event modelling in an object-oriented environment
    • Zeigler, B.P. (1987). "Hierarchical, modular discrete-event modelling in an object-oriented environment." Simulation. 49(5). 219-230.
    • (1987) Simulation , vol.49 , Issue.5 , pp. 219-230
    • Zeigler, B.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.