-
3
-
-
0024873827
-
Turbidite-hosted vein gold mineralization at the Dolaucothi gold mines, Dyfed, Wales, UK
-
ANNELS, A.E. and ROBERTS, D.E. 1989. Turbidite-hosted vein gold mineralization at the Dolaucothi gold mines, Dyfed, Wales, UK. Economic Geology, 84, p. 1293-1314.
-
(1989)
Economic Geology
, vol.84
, pp. 1293-1314
-
-
Annels, A.E.1
Roberts, D.E.2
-
4
-
-
0742278264
-
Current gold and nickel ore reserve estimation techniques in the Eastern Goldfields - Mine survey results
-
Australasian Institute of Mining and Metallurgy
-
BARR, S.P., 1998. Current gold and nickel ore reserve estimation techniques in the Eastern Goldfields - Mine survey results. In Gold and Nickel: Ore Reserve Estimation Practice Seminar. Australasian Institute of Mining and Metallurgy, p. 153-172.
-
(1998)
Gold and Nickel: Ore Reserve Estimation Practice Seminar
, pp. 153-172
-
-
Barr, S.P.1
-
5
-
-
0042375410
-
The Inglewood Goldfield
-
Australasian Institute of Mining and Metallurgy, Special Publication
-
BATTERSBY, J., 1993. The Inglewood Goldfield. In Proceedings, Narrow Vein Mining Seminar. Australasian Institute of Mining and Metallurgy, Special Publication 4/93, p. 107-108.
-
(1993)
Proceedings, Narrow Vein Mining Seminar
, vol.4
, Issue.93
, pp. 107-108
-
-
Battersby, J.1
-
6
-
-
0005398049
-
Dealing with coarse-gold and cutting factors, or dealing with the nugget effect practice
-
Prospectors and Developers Association of Canada
-
BIRD, H.H., 1991. Dealing with coarse-gold and cutting factors, or dealing with the nugget effect practice. In Proceedings Symposium on Sampling and Ore Reserves. Prospectors and Developers Association of Canada, p. 35-54.
-
(1991)
Proceedings Symposium on Sampling and Ore Reserves
, pp. 35-54
-
-
Bird, H.H.1
-
7
-
-
0023557933
-
Gold mine evaluation: Some evaluation concepts
-
Australasian Institute of Mining and Metallurgy, Special Publication
-
CARRAS, S.N., 1987. Gold mine evaluation: Some evaluation concepts. In Proceedings, PACRIM Conference 1987. Australasian Institute of Mining and Metallurgy, Special Publication 7/87, p. 845-850.
-
(1987)
Proceedings, PACRIM Conference 1987
, vol.7
, Issue.87
, pp. 845-850
-
-
Carras, S.N.1
-
8
-
-
0002052743
-
-
United States Geological Survey, Professional Paper 625-C
-
CLIFTON, H.E., HUNTER, R.E., SWANSON, F.J. and PHILLIPS, R.L., 1969. Sample Size and Meaningful Gold Analysis. United States Geological Survey, Professional Paper 625-C, 17 p.
-
(1969)
Sample Size and Meaningful Gold Analysis
, pp. 17
-
-
Clifton, H.E.1
Hunter, R.E.2
Swanson, F.J.3
Phillips, R.L.4
-
9
-
-
0002883437
-
A new structural model for fault-hosted gold mineralization: An example from the Nick O'Time oreshoot, Poverty Reef, Tarnagulla
-
Australian Institute of Geoscientists
-
CUFFLEY, B.W., KROKOWSKI de VICKEROD, J., EVANS, T. and FRASER, R., 1998. A new structural model for fault-hosted gold mineralization: An example from the Nick O'Time oreshoot, Poverty Reef, Tarnagulla. In VICMIN98: The Second GPIC Conference on Developments in Victorian Geology and Mineralization. Australian Institute of Geoscientists, 24, p. 53-63.
-
(1998)
VICMIN98: The Second GPIC Conference on Developments in Victorian Geology and Mineralization
, vol.24
, pp. 53-63
-
-
Cuffley, B.W.1
Krokowskidevickerod, J.2
Evans, T.3
Fraser, R.4
-
10
-
-
0030399072
-
Gwynfynydd's gold veins: Geology plays an important role in the mining of complex narrow veins
-
DOMINY, S.C. and PHELPS, R.F.G., 1996. Gwynfynydd's gold veins: Geology plays an important role in the mining of complex narrow veins. Mining Magazine, 175, p. 325-333.
-
(1996)
Mining Magazine
, vol.175
, pp. 325-333
-
-
Dominy, S.C.1
Phelps, R.F.G.2
-
11
-
-
0742330905
-
Criteria for the recognition of a pre-cleavage age for gold-bearing quartz veins in weakly cleaved terrains
-
DOMINY, S.C. and PLATTEN, I.M., 1999. Criteria for the recognition of a pre-cleavage age for gold-bearing quartz veins in weakly cleaved terrains. Transactions of the Institution of Mining and Metallurgy, 108, p. B73-B76.
-
(1999)
Transactions of the Institution of Mining and Metallurgy
, vol.108
-
-
Dominy, S.C.1
Platten, I.M.2
-
12
-
-
0000837768
-
Geological controls on gold grade distribution in the Chidlaw Link Zone, Gwynfynydd mine, Dolgellau, North Wales, UK
-
DOMINY, S.C., PHELPS, R.F.G. and CAMM, G.S., 1996. Geological controls on gold grade distribution in the Chidlaw Link Zone, Gwynfynydd mine, Dolgellau, North Wales, UK. Transactions of the Institution of Mining and Metallurgy, 105, p. B151-B158.
-
(1996)
Transactions of the Institution of Mining and Metallurgy
, vol.105
-
-
Dominy, S.C.1
Phelps, R.F.G.2
Camm, G.S.3
-
13
-
-
0000432323
-
Geology in the resource and reserve estimation of narrow vein deposits
-
DOMINY, S.C., ANNELS, A.E., CAMM, G.S., WHEELER, P.D. and BARR, S.P., 1997. Geology in the resource and reserve estimation of narrow vein deposits. Exploration and Mining Geology, 6, p. 317-333.
-
(1997)
Exploration and Mining Geology
, vol.6
, pp. 317-333
-
-
Dominy, S.C.1
Annels, A.E.2
Camm, G.S.3
Wheeler, P.D.4
Barr, S.P.5
-
14
-
-
0002502230
-
Resource evaluation of narrow gold-bearing veins: Problems and methods of grade estimation
-
DOMINY, S.C., ANNELS, A.E., CAMM, G.S., CUFFLEY, B.W. and HODKINSON, I.P., 1999a. Resource evaluation of narrow gold-bearing veins: Problems and methods of grade estimation. Transactions of the Institution of Mining and Metallurgy, 108, p. A52-A70.
-
(1999)
Transactions of the Institution of Mining and Metallurgy
, vol.108
-
-
Dominy, S.C.1
Annels, A.E.2
Camm, G.S.3
Cuffley, B.W.4
Hodkinson, I.P.5
-
15
-
-
0002532176
-
Gold grade distribution and estimation in vein systems
-
Australasian Institute of Mining and Metallurgy. Special Publication
-
DOMINY, S.C., ANNELS, A.E., BARR, S.P., HODKINSON, I.P. and CUFFLEY, B.W., 1999b. Gold grade distribution and estimation in vein systems. In Proceedings, PACRIM Conference 1999. Australasian Institute of Mining and Metallurgy. Special Publication 4/99. p. 411-425.
-
(1999)
Proceedings, PACRIM Conference 1999
, vol.4
, Issue.99
, pp. 411-425
-
-
Dominy, S.C.1
Annels, A.E.2
Barr, S.P.3
Hodkinson, I.P.4
Cuffley, B.W.5
-
16
-
-
0034261539
-
General considerations of sampling and assaying in a coarse gold environment
-
DOMINY, S.C., ANNELS, A.E., JOHANSEN, G.F. and CUFFLEY, B.W., 2000. General considerations of sampling and assaying in a coarse gold environment. Transactions of the Institution of Mining and Metallurgy, 109, p. B145-B167.
-
(2000)
Transactions of the Institution of Mining and Metallurgy
, vol.109
-
-
Dominy, S.C.1
Annels, A.E.2
Johansen, G.F.3
Cuffley, B.W.4
-
17
-
-
0007992364
-
Structural setting and timing of gold mineralization at Maldon, Victoria
-
Australian Institute of Geoscientists
-
EBSWORTH, G. and KROKOWSKI de VICKEROD, J., 1998. Structural setting and timing of gold mineralization at Maldon, Victoria. In VICMIN98: The Second GPIC Conference on Developments in Victorian Geology and Mineralization. Australian Institute of Geoscientists, 24, p. 77-86.
-
(1998)
VICMIN98: The Second GPIC Conference on Developments in Victorian Geology and Mineralization
, vol.24
, pp. 77-86
-
-
Ebsworth, G.1
Krokowski de vickerod, J.2
-
18
-
-
85039569661
-
Leachwell™ versus fire assay: Comments from assay quality assurance at Tarmoola gold mine, Western Australia
-
Australasian Institute of Mining and Metallurgy, Special Publication
-
ELDER, D.J., 2000. Leachwell™ versus fire assay: Comments from assay quality assurance at Tarmoola gold mine, Western Australia. In Proceedings, Fourth International Mining Geology Conference 2000. Australasian Institute of Mining and Metallurgy, Special Publication 3/00, p. 43-52.
-
(2000)
Proceedings, Fourth International Mining Geology Conference 2000
, vol.3
, Issue.0
, pp. 43-52
-
-
Elder, D.J.1
-
20
-
-
0028184246
-
Late structural control of mesothermal vein-hosted gold deposits in Central Victoria, Australia
-
FORDE, A. and BELL, T.H., 1994. Late structural control of mesothermal vein-hosted gold deposits in Central Victoria. Australia. Ore Geology Reviews, 9, p. 33-59.
-
(1994)
Ore Geology Reviews
, vol.9
, pp. 33-59
-
-
Forde, A.1
Bell, T.H.2
-
21
-
-
84966663640
-
Gy's formula - Conclusion of a new phase of research
-
Australian Institute of Geoscientists
-
FRANCOIS-BONGARÇON, D., 1998a. Gy's formula - Conclusion of a new phase of research. In More Meaningful Sampling in the Mining Industry. Australian Institute of Geoscientists, 22, p. 1-10.
-
(1998)
More Meaningful Sampling in the Mining Industry
, vol.22
, pp. 1-10
-
-
Francois-Bongarçon, D.1
-
22
-
-
0033550329
-
Extensions to the demonstration of Gy's formula
-
FRANCOIS-BONGARÇON, D., 1998b. Extensions to the demonstration of Gy's formula. Exploration and Mining Geology, 7, p. 149-154.
-
(1998)
Exploration and Mining Geology
, vol.7
, pp. 149-154
-
-
Francois-Bongarçon, D.1
-
23
-
-
0742330906
-
Re-opening of old mines: The intrinsic value of underground drilling and drifting in mine planning
-
Australasian Institute of Mining and Metallurgy, Special Publication
-
GOODZ, M.D. and FRITH, R.A., 1990. Re-opening of old mines: The intrinsic value of underground drilling and drifting in mine planning. In Proceedings, PACRIM Conference 1990. Australasian Institute of Mining and Metallurgy, Special Publication 3/90, p. 433-437.
-
(1990)
Proceedings, PACRIM Conference 1990
, vol.3
, Issue.90
, pp. 433-437
-
-
Goodz, M.D.1
Frith, R.A.2
-
24
-
-
85039568163
-
Sample preparation and assaying
-
Society of Mining Engineers
-
GUMBLE, G.E., POST, E.V. and HILL, W.E., 1992. Sample preparation and assaying. In Mining Engineering Handbook. Society of Mining Engineers, p. 327-332.
-
(1992)
Mining Engineering Handbook
, pp. 327-332
-
-
Gumble, G.E.1
Post, E.V.2
Hill, W.E.3
-
26
-
-
0033550343
-
Gold analysis - Fire assaying and alternative methods
-
HOFFMAN, E.L., CLARK, J.R. and YEAGER, J.R., 1998. Gold analysis - Fire assaying and alternative methods. Exploration and Mining Geology, 7, p. 155-160.
-
(1998)
Exploration and Mining Geology
, vol.7
, pp. 155-160
-
-
Hoffman, E.L.1
Clark, J.R.2
Yeager, J.R.3
-
27
-
-
0042375369
-
Ballarat East - From eureka to the 80s
-
Australasian Institute of Mining and Metallurgy, Special Publication
-
HUNT, F.L., 1990. Ballarat East - From eureka to the 80s. In Proceedings, PACRIM Conference 1990. Australasian Institute of Mining and Metallurgy, Special Publication 3/90, p. 473-480.
-
(1990)
Proceedings, PACRIM Conference 1990
, vol.3
, Issue.90
, pp. 473-480
-
-
Hunt, F.L.1
-
28
-
-
0042191384
-
-
IMM Institution of Mining and Metallurgy
-
IMM, 1991. Definitions of Reserves and Resources. Institution of Mining and Metallurgy, 4 p.
-
(1991)
Definitions of Reserves and Resources
, pp. 4
-
-
-
32
-
-
0742295664
-
Don't lose your shirt: Take a bulk sample
-
Prospectors and Developers Association of Canada
-
JOHN, M. and THALENHORST, H., 1991. Don't lose your shirt: Take a bulk sample. In Proceedings, Symposium on Sampling and Ore Reserves. Prospectors and Developers Association of Canada, p. 11-22.
-
(1991)
Proceedings, Symposium on Sampling and Ore Reserves
, pp. 11-22
-
-
John, M.1
Thalenhorst, H.2
-
33
-
-
0003499684
-
-
JORC Report of the Joint Committee of the Australasian Institute of Mining and Metallurgy, Australasian Institute of Geoscientists and Minerals Council of Australia (JORC)
-
JORC, 1999. Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves. Report of the Joint Committee of the Australasian Institute of Mining and Metallurgy, Australasian Institute of Geoscientists and Minerals Council of Australia (JORC), 16 p.
-
(1999)
Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves
, pp. 16
-
-
-
34
-
-
0007953504
-
Lineation and stress-strain analysis as an exploration tool for gold mineralization: An example from the Poverty Reef, Tarnagulla
-
Australian Institute of Geoscientists, Bulletin No. 24
-
KROKOWSKI de VICKEROD, J. and CUFFLEY, B.W., 1998. Lineation and stress-strain analysis as an exploration tool for gold mineralization: An example from the Poverty Reef, Tarnagulla. In VICMIN98: The Second GPIC Conference on Developments in Victorian Geology and Mineralization. Australian Institute of Geoscientists, Bulletin No. 24, p. 65-76.
-
(1998)
VICMIN98: The Second GPIC Conference on Developments in Victorian Geology and Mineralization
, pp. 65-76
-
-
Krokowski de Vickerod, J.1
Cuffley, B.W.2
-
35
-
-
85039575975
-
Grade control procedures and experiences at the Hoyle Pond mine, Timmins, Ontario, Canada
-
Prospectors and Developers Association of Canada
-
LABINE, R.J., 1991. Grade control procedures and experiences at the Hoyle Pond mine, Timmins, Ontario, Canada. In Proceedings, Symposium on Sampling and Ore Reserves. Prospectors and Developers Association of Canada, p. 132-141.
-
(1991)
Proceedings, Symposium on Sampling and Ore Reserves
, pp. 132-141
-
-
Labine, R.J.1
-
36
-
-
0033550351
-
Practical quality control procedures in mineral inventory estimation
-
LONG, S.D., 1998. Practical quality control procedures in mineral inventory estimation. Exploration and Mining Geology, 7, p. 117-128.
-
(1998)
Exploration and Mining Geology
, vol.7
, pp. 117-128
-
-
Long, S.D.1
-
38
-
-
0005398055
-
-
Geological Survey of Newfoundland, Report 98-1
-
MEADE, J., EVANS, D.T.W. and WILTON, D.H.C., 1998. Romeo and Juliet Prospect, Baie Verte Peninsula, Newfoundland. Geological Survey of Newfoundland, Report 98-1, p. 77-83.
-
(1998)
Romeo and Juliet Prospect, Baie Verte Peninsula, Newfoundland
, pp. 77-83
-
-
Meade, J.1
Evans, D.T.W.2
Wilton, D.H.C.3
-
39
-
-
0002894716
-
Structural controls in the Tarnagulla Goldfield, Central Victoria: Implications for metamorphically derived auriferous fluids
-
Australasian Institute of Mining and Metallurgy, Special Publication 9/95
-
MOLLOY, R.M., MORAND, V.J. and RAMSAY, W.R.H., 1995. Structural controls in the Tarnagulla Goldfield, Central Victoria: Implications for metamorphically derived auriferous fluids. In Proceedings, PACRIM Conference 1995. Australasian Institute of Mining and Metallurgy, Special Publication 9/95, p. 383-388.
-
(1995)
Proceedings, PACRIM Conference 1995
, pp. 383-388
-
-
Molloy, R.M.1
Morand, V.J.2
Ramsay, W.R.H.3
-
40
-
-
0031453294
-
Computer assisted modelling of narrow, elongate gold deposits for resource estimation and mine planning
-
Australasian Institute of Mining and Metallurgy, Special Publication
-
MURPHY, M.P. and WARD, C.W., 1997. Computer assisted modelling of narrow, elongate gold deposits for resource estimation and mine planning. In Proceedings, AusIMM Annual Conference 1997. Australasian Institute of Mining and Metallurgy, Special Publication 1/97, p. 165-170.
-
(1997)
Proceedings, AusIMM Annual Conference 1997
, vol.1
, Issue.97
, pp. 165-170
-
-
Murphy, M.P.1
Ward, C.W.2
-
41
-
-
0001912331
-
The evaluation of vein gold deposits
-
PELHAM, D.A., 1991. The evaluation of vein gold deposits: Part I. Mining Technology, p. 57-61.
-
(1991)
Mining Technology
, Issue.PART 1
, pp. 57-61
-
-
Pelham, D.A.1
-
43
-
-
0033278568
-
Re-evaluation of quartz vein history in the Dolgellau Gold-Belt, North Wales, United Kingdom
-
PLATTEN, I.M. and DOMINY, S.C., 1999. Re-evaluation of quartz vein history in the Dolgellau Gold-Belt, North Wales, United Kingdom. Geological Journal, 34, p. 369-391.
-
(1999)
Geological Journal
, vol.34
, pp. 369-391
-
-
Platten, I.M.1
Dominy, S.C.2
-
48
-
-
0028584712
-
Reviewing continuity: An essential element of quality control for deposit and reserve estimation
-
SINCLAIR, A.J. and VALLÉE, M., 1994. Reviewing continuity: An essential element of quality control for deposit and reserve estimation. Exploration and Mining Geology, 2, p. 95-108.
-
(1994)
Exploration and Mining Geology
, vol.2
, pp. 95-108
-
-
Sinclair, A.J.1
Vallée, M.2
-
49
-
-
0742313211
-
Geological modelling and grade control in a narrow vein, high-grade gold mine
-
Australasian Institute of Mining and Metallurgy, Special Publication 3/2000
-
SIMS, D., 2000. Geological modelling and grade control in a narrow vein, high-grade gold mine. In Proceedings, Fourth International Mining Geology Conference 2000. Australasian Institute of Mining and Metallurgy, Special Publication 3/2000, p. 65-76.
-
(2000)
Proceedings, Fourth International Mining Geology Conference 2000
, pp. 65-76
-
-
Sims, D.1
-
50
-
-
0033550346
-
Gold deposits: Establishing sampling protocols and monitoring quality control
-
SKETCHLEY, D.A. 1998. Gold deposits: Establishing sampling protocols and monitoring quality control. Exploration and Mining Geology, 7, p. 129-138.
-
(1998)
Exploration and Mining Geology
, vol.7
, pp. 129-138
-
-
Sketchley, D.A.1
-
51
-
-
0042375361
-
The Ballarat East Project
-
Australasian Institute of Mining and Metallurgy, Special Publication 1/90
-
SPARK, R.F., 1990. The Ballarat East Project. In Ore Reserve Estimates: The Impact on Miners and Financiers. Australasian Institute of Mining and Metallurgy, Special Publication 1/90, p. 57-62.
-
(1990)
Ore Reserve Estimates: The Impact on Miners and Financiers
, pp. 57-62
-
-
Spark, R.F.1
-
52
-
-
0021560945
-
Sampling practices and problems
-
Society of Mining Engineers, New York
-
SPRINGETT, M.W., 1984. Sampling practices and problems. In Applied Mining Geology. Society of Mining Engineers, New York, p. 191-195.
-
(1984)
Applied Mining Geology
, pp. 191-195
-
-
Springett, M.W.1
-
53
-
-
0033550354
-
NUGGET: PC-software to calculate parameters for samples and elements affected by the nugget effect
-
STANLEY, C.R., 1998. NUGGET: PC-software to calculate parameters for samples and elements affected by the nugget effect. Exploration and Mining Geology, 7, p. 139-148.
-
(1998)
Exploration and Mining Geology
, vol.7
, pp. 139-148
-
-
Stanley, C.R.1
-
54
-
-
0007637518
-
The Bendigo Goldfield
-
Australasian Institute of Mining and Metallurgy
-
THOMAS, D.E., 1953. The Bendigo Goldfield. In Geology of Australian Ore Deposits. Australasian Institute of Mining and Metallurgy, p. 1011-1027.
-
(1953)
Geology of Australian Ore Deposits
, pp. 1011-1027
-
-
Thomas, D.E.1
-
58
-
-
24444453284
-
-
Special Canadian Institute of Mining and Metallurgy
-
VALLÉE, M., 1992. Guide to the Evaluation of Gold Deposits. Special Volume 45, Canadian Institute of Mining and Metallurgy, 300 p.
-
(1992)
Guide to the Evaluation of Gold Deposits
, vol.45
, pp. 300
-
-
Vallée, M.1
-
59
-
-
0033550352
-
Quality assurance, continuous quality improvement and standards
-
VALLÉE, M., 1998a. Quality assurance, continuous quality improvement and standards. Exploration and Mining Geology, 7, p. 1-14.
-
(1998)
Exploration and Mining Geology
, vol.7
, pp. 1-14
-
-
Vallée, M.1
-
61
-
-
85039572570
-
Modelling of multiple narrow veins from geology to mining - The Tasmania Reef, Beaconsfield, Tasmania
-
Australasian Institute of Mining and Metallurgy, Special Publication 4/99
-
VIGAR, A.J. and HILLS, P.B., 1999. Modelling of multiple narrow veins from geology to mining - The Tasmania Reef, Beaconsfield, Tasmania. In Proceedings, PACRIM Conference 1999. Australasian Institute of Mining and Metallurgy, Special Publication 4/99, p. 397-410.
-
(1999)
Proceedings, PACRIM Conference 1999
, pp. 397-410
-
-
Vigar, A.J.1
Hills, P.B.2
-
62
-
-
0742278268
-
Avoiding over- and under-estimation of grade by using correct sampling
-
Australian Institute of Geoscientists
-
VOORTMAN, A.G.W., 1998. Avoiding over- and under-estimation of grade by using correct sampling. In More Meaningful Sampling in the Mining Industry. Australian Institute of Geoscientists, 22, p. 21-29.
-
(1998)
More Meaningful Sampling in the Mining Industry
, vol.22
, pp. 21-29
-
-
Voortman, A.G.W.1
-
63
-
-
0005478121
-
Sample preparation and assaying of course gold ores
-
Australasian Institute of Mining and Metallurgy, Special Publication 2/98
-
WOOLDRIDGE, R., 1998. Sample preparation and assaying of course gold ores. In Proceedings, AusIMM Annual Conference 1998. Australasian Institute of Mining and Metallurgy, Special Publication 2/98, p. 143-154.
-
(1998)
Proceedings, AusIMM Annual Conference 1998
, pp. 143-154
-
-
Wooldridge, R.1
|