메뉴 건너뛰기




Volumn 7, Issue 6, 1996, Pages 1528-1532

Effect of probabilistic inputs on neural network-based electric load forecasting

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0001740849     PISSN: 10459227     EISSN: None     Source Type: Journal    
DOI: 10.1109/72.548183     Document Type: Article
Times cited : (40)

References (7)
  • 2
    • 0026822198 scopus 로고
    • Advancement in the application of neural networks for short-term load forecasting
    • T. M. Peng, N. F. Hubele, and G. G. Karady, "Advancement in the application of neural networks for short-term load forecasting," IEEE Trans. Power Syst., vol. 7, pp. 250-257, 1992.
    • (1992) IEEE Trans. Power Syst. , vol.7 , pp. 250-257
    • Peng, T.M.1    Hubele, N.F.2    Karady, G.G.3
  • 3
    • 0022105534 scopus 로고
    • Problems associated with unit commitment in uncertainty
    • Aug.
    • IEEE Committee Report, "Problems associated with unit commitment in uncertainty," IEEE Trans. Power Apparatus Syst., vol. 104, pp. 2072-2078, Aug. 1985.
    • (1985) IEEE Trans. Power Apparatus Syst. , vol.104 , pp. 2072-2078
  • 5
    • 0026899193 scopus 로고
    • Using radial basis function to approximate a function and its error bounds
    • July
    • J. A. Leonard, M. A. Karcher, and L. H. Ungar, "Using radial basis function to approximate a function and its error bounds," IEEE Trans. Neural Networks, vol. 3, pp. 624-626, July 1992.
    • (1992) IEEE Trans. Neural Networks , vol.3 , pp. 624-626
    • Leonard, J.A.1    Karcher, M.A.2    Ungar, L.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.