-
1
-
-
0028465107
-
Agile Manufacturing in a Responsive Factory
-
O'Connor, L., "Agile Manufacturing in a Responsive Factory," Mechanical Engineering, Vol. 116, No. 7, 1994, pp. 54-57.
-
(1994)
Mechanical Engineering
, vol.116
, Issue.7
, pp. 54-57
-
-
O'connor, L.1
-
2
-
-
85024026997
-
-
CASA/SME Conf, East Moline, IL, Dec. 10
-
Hess, G. J., "Best Practice for Manufacturing Excellence beyond CIMS," CASA/SME Conf, East Moline, IL, Dec. 10, 1992.
-
(1992)
Best Practice for Manufacturing Excellence beyond CIMS
-
-
Hess, G.J.1
-
3
-
-
85023968070
-
-
Symp. on Manuf. Science, Evanston, IL
-
Rong, Y., S. Li, Y. Bai and J. Zhu, "Development of Flexible Fixturing Technique in Manufacturing," Symp. on Manuf. Science, Evanston, IL, May 1994, pp. 101-105.
-
(1994)
Development of Flexible Fixturing Technique in Manufacturing
, pp. 101-105
-
-
Rong, Y.1
Li, S.2
Bai, Y.3
Zhu, J.4
-
4
-
-
0026984783
-
-
ASME WAM, PED-Vol. 56, Anaheim, CA
-
Zhu, Y. and Y. Rong, "A Computer-aided Fixture Design System for Modular Fixture Assembly," ASME WAM, PED-Vol. 56, Anaheim, CA, Nov. 1992, pp. 165-174.
-
(1992)
A Computer-Aided Fixture Design System for Modular Fixture Assembly
, pp. 165-174
-
-
Zhu, Y.1
Rong, Y.2
-
5
-
-
0024640250
-
Computer-aided Process Planning: The State-of-the-art Survey
-
Alting, L. and H. C. Zhang, "Computer-aided Process Planning: the State-of-the-art Survey," Int. Journal of Production Research, Vol. 27, No. 4, 1989, pp. 553-585.
-
(1989)
Int. Journal of Production Research
, vol.27
, Issue.4
, pp. 553-585
-
-
Alting, L.1
Zhang, H.C.2
-
6
-
-
0000103197
-
Commentary on Flexible Fixtoring
-
Thompson, B. S. and M. V. Gandhi, "Commentary on Flexible Fixtoring," Applied Mechanics Review, Vol. 39, No. 9, 1986, pp. 1365-1369.
-
(1986)
Applied Mechanics Review
, vol.39
, Issue.9
, pp. 1365-1369
-
-
Thompson, B.S.1
Gandhi, M.V.2
-
7
-
-
0025747167
-
A Framework for an Objective/Rule-based Automated Fixture Design System
-
Nee, A. Y. C. and A. Senthil Kumar, "A Framework for an Objective/Rule-based Automated Fixture Design System, " Annual of CIRP, 1991, pp. 147-151.
-
(1991)
Annual of CIRP
, pp. 147-151
-
-
Nee, A.Y.C.1
Senthil Kumar, A.2
-
8
-
-
0025472780
-
A Literature Survey of Fixture-Design Automation
-
Trappey, A. J. C. and C. R. Liu, "A Literature Survey of Fixture-Design Automation," Int. J. of advanced Manufacturing Technology, Vol. 5, No. 3, 1990, pp. 240-255.
-
(1990)
Int. J. Of Advanced Manufacturing Technology
, vol.5
, Issue.3
, pp. 240-255
-
-
Trappey, A.J.C.1
Liu, C.R.2
-
9
-
-
13644284661
-
-
Machinery Press, Beijing, China
-
Zhu, Y. and S. Zhang, Modular Fixtures: Theory and Application, Machinery Press, Beijing, China, 1990.
-
(1990)
Modular Fixtures: Theory and Application
-
-
Zhu, Y.1
Zhang, S.2
-
10
-
-
85103443880
-
-
27s/ ASME Design Automation Conference, Boston, MA, Sep. 17-21
-
Bai, Y. and Y. Rong, "Automated Generation of Fixture Configuration Design,"27s/ ASME Design Automation Conference, Boston, MA, Sep. 17-21, 1995.
-
(1995)
Automated Generation of Fixture Configuration Design
-
-
Bai, Y.1
Rong, Y.2
-
12
-
-
0024771578
-
A Mathematical Approach to Automatic Configuration of Machining Fixtures: Analysis and Synthesis
-
Chou, Y. C., V. Chandru and M. M. Barash, "A Mathematical Approach to Automatic Configuration of Machining Fixtures: Analysis and Synthesis," Journal ofEngr.for Industry, Vol, 111, pp. 299-306.
-
Journal Ofengr.For Industry
, vol.111
, pp. 299-306
-
-
Chou, Y.C.1
Chandru, V.2
Barash, M.M.3
-
13
-
-
0027840172
-
-
Manufacturing Science and Engineering, ASME WAM, New Orleans, LA, Nov. 28-Dec. 2, 1993, PED
-
De Meter, E. C., "Selection of Fixture Configuration for the Maximization of Mechanical Leverage," Manufacturing Science and Engineering, ASME WAM, New Orleans, LA, Nov. 28-Dec. 2, 1993, PED-Vol. 4, pp. 491-506.
-
Selection of Fixture Configuration for the Maximization of Mechanical Leverage
, vol.4
, pp. 491-506
-
-
De Meter, E.C.1
-
14
-
-
0025682380
-
-
ASME WAM, PED-, Dallas, TX, Nov
-
Menassa, R. J. and W. DeVries, "A Design Synthesis and Optimization Method for Fixtures with Compliant Elements," ASME WAM, PED-Vol. 47, Dallas, TX, Nov. 1990, pp. 203-218.
-
(1990)
A Design Synthesis and Optimization Method for Fixtures with Compliant Elements
, vol.47
, pp. 203-218
-
-
Menassa, R.J.1
Devries, W.2
-
16
-
-
0021660237
-
Fixture Design Using Prolog: An Expert System
-
Markus, A., E. Markusek, J. Farkas and J. Filemon, "Fixture Design Using Prolog: an Expert System, "Robotics and CIMS, Vol. 1, No. 2, 1984, pp. 167-172.
-
(1984)
Robotics and CIMS
, vol.1
, Issue.2
, pp. 167-172
-
-
Markus, A.1
Markusek, E.2
Farkas, J.3
Filemon, J.4
-
17
-
-
0025632170
-
AUTOFIX-an Expert CAD System for Jig and Fixtures
-
Pham, D. T. and A. de Sam Lazaro, "AUTOFIX-an Expert CAD System for Jig and Fixtures," Int. J. of Machine Tools & Manuf, Vol. 30, No. 3, 1990, pp. 403-411.
-
(1990)
Int. J. Of Machine Tools & Manuf
, vol.30
, Issue.3
, pp. 403-411
-
-
Pham, D.T.1
De Sam Lazaro, A.2
-
18
-
-
33748680206
-
Fixture Design with FIXES: The Automated Selection of Positioning, Clamping and Support Features for Primatic Parts
-
Boerma, J. R. and H. J. J. Kals, "Fixture Design with FIXES: the Automated Selection of Positioning, Clamping and Support Features for Primatic Parts," Annals of the CIRP, Vo. 38, 1989, pp. 399-402.
-
(1989)
Annals of the CIRP, Vo
, vol.38
, pp. 399-402
-
-
Boerma, J.R.1
Kals, H.J.J.2
-
19
-
-
0027885841
-
-
ASME WAM, New Orleans, LA, Nov. 1993, PED
-
Rong, Y., J. Zhu and S. Li, "Fixturing Feature Analysis for Computer-Aided Fixture Design," ASME WAM, New Orleans, LA, Nov. 1993, PED-Vol. 64, pp. 267-271.
-
Fixturing Feature Analysis for Computer-Aided Fixture Design
, vol.64
, pp. 267-271
-
-
Rong, Y.1
Zhu, J.2
Li, S.3
-
20
-
-
85024082831
-
-
A.SAi£ WAM, San Francisco, CA, Nov. 12-17
-
Ong, S. K. and A. Y. C. Nee, "A Systematic Approach for Analysing the Fixturability of Parts for Machining," A.SAi£ WAM, San Francisco, CA, Nov. 12-17, 1995.
-
(1995)
A Systematic Approach for Analysing the Fixturability of Parts for Machining
-
-
Ong, S.K.1
Nee, A.Y.C.2
-
21
-
-
0021497268
-
Integrating CAD and CAM through Automated Process Planning
-
Chang, T. C. and R. A. Wysk, "Integrating CAD and CAM through Automated Process Planning," Int. J. of Production Research, Vol. 22, No. 5, 1984, pp. 877-894.
-
(1984)
Int. J. Of Production Research
, vol.22
, Issue.5
, pp. 877-894
-
-
Chang, T.C.1
Wysk, R.A.2
-
22
-
-
85023989731
-
-
Intelligent Design and Manufacturing, ed. A. Kusiak, John Wiley, New York
-
Shah, J., "Feature is in Design and Manufacturing," Intelligent Design and Manufacturing, ed. A. Kusiak, John Wiley, New York, 1992, pp. 39-71.
-
(1992)
Feature is in Design and Manufacturing
, pp. 39-71
-
-
Shah, J.1
-
23
-
-
0027342212
-
Protrusion-features Handling in Design & Manufacturing Planning
-
Chamberlain, M. A., A. Joneja, T. C. Chang, "Protrusion-features Handling in Design & Manufacturing Planning," Computer-aided Design, Vol.25, No.1, 1993, pp. 19-28.
-
(1993)
Computer-Aided Design
, vol.25
, Issue.1
, pp. 19-28
-
-
Chamberlain, M.A.1
Joneja, A.2
Chang, T.C.3
-
24
-
-
26644461575
-
Integration of Design and Manufacturing: Solving Setup Generation and Feature Sequencing using an Unsupervised-leaming Approach
-
Chen, C. L. P. and S. R. LeClair, "Integration of Design and Manufacturing: Solving Setup Generation and Feature Sequencing using an Unsupervised-leaming Approach," Computer-aided Design, Vol. 26, No. 1, 1994, pp. 59-74.
-
(1994)
Computer-Aided Design
, vol.26
, Issue.1
, pp. 59-74
-
-
Chen, C.L.P.1
Leclair, S.R.2
-
25
-
-
0027843091
-
-
ASME WAM, Nov. 29-Dec. 3, 1993, pp. PED
-
Bai, Y. and Y. Rong, "Machining Accuracy Analysis for Computer-aided Fixture Design," ASME WAM, Nov. 29-Dec. 3, 1993, pp. PED-Vol. 64, pp. 507-512.
-
Machining Accuracy Analysis for Computer-Aided Fixture Design
, vol.64
, pp. 507-512
-
-
Bai, Y.1
Rong, Y.2
-
26
-
-
85024046463
-
-
ASME Computer in Engineering, Boston, MA, Sep
-
Rong, Y., W. Li and Y. Bai, "Locating Error Analysis for Computer-aided Fixture Design," ASME Computer in Engineering, Boston, MA, Sep. 17-21, 1995.
-
(1995)
Locating Error Analysis for Computer-Aided Fixture Design
, pp. 17-21
-
-
Rong, Y.1
Li, W.2
Bai, Y.3
-
27
-
-
85023994237
-
-
ASME Computer in Engr., Minneapolis, MN, Sep
-
Rong, Y., T. Chu, S. Wu, "Computer-aided Fixture Design Verification of Clamping Stability," ASME Computer in Engr., Minneapolis, MN, Sep, 1994, pp. 421-426.
-
(1994)
Computer-Aided Fixture Design Verification of Clamping Stability
, pp. 421-426
-
-
Rong, Y.1
Chu, T.2
Wu, S.3
-
28
-
-
0003446519
-
-
NAMRCXXI, Stillwater, OK, May 19-21
-
Zhu, Y., S. Zhang and Y. Rong, "Experimental Study on Fixturing Stiffness of T-slot based Modular Fixtures,"NAMRCXXI, Stillwater, OK, May 19-21, 1993.
-
(1993)
Experimental Study on Fixturing Stiffness of T-Slot Based Modular Fixtures
-
-
Zhu, Y.1
Zhang, S.2
Rong, Y.3
|