-
1
-
-
0027927407
-
Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly
-
Ahmadi RH, Kouvelis P (1994) Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly. Oper Res 42:81-91
-
(1994)
Oper Res
, vol.42
, pp. 81-91
-
-
Ahmadi, R.H.1
Kouvelis, P.2
-
2
-
-
0028480771
-
Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell
-
Askin RG, Dror M, Vakharia AJ (1994) Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell. Nav Res Log 41:587-608
-
(1994)
Nav Res Log
, vol.41
, pp. 587-608
-
-
Askin, R.G.1
Dror, M.2
Vakharia, A.J.3
-
3
-
-
0023981635
-
Sequencing of insertions in printed circuit board assembly
-
Ball MO, Magazine MJ (1988) Sequencing of insertions in printed circuit board assembly. Oper Res 36:192-201
-
(1988)
Oper Res
, vol.36
, pp. 192-201
-
-
Ball, M.O.1
Magazine, M.J.2
-
4
-
-
0028101641
-
Machine setup and component placement in printed circuit board assembly
-
Bard JF, Clayton RW, Feo TA (1994) Machine setup and component placement in printed circuit board assembly. Int J Flex Manuf Syst 6:5-31
-
(1994)
Int J Flex Manuf Syst
, vol.6
, pp. 5-31
-
-
Bard, J.F.1
Clayton, R.W.2
Feo, T.A.3
-
5
-
-
0000411581
-
Throughput rate optimization in the automated assembly of printed circuit boards
-
Crama Y, Kolen AWJ, Oerlemans AG, Spieksma FCR (1990) Throughput rate optimization in the automated assembly of printed circuit boards. Ann Opers Res 26:455-480
-
(1990)
Ann Opers Res
, vol.26
, pp. 455-480
-
-
Crama, Y.1
Kolen, A.W.J.2
Oerlemans, A.G.3
Spieksma, F.C.R.4
-
7
-
-
0010490924
-
Work flow control in the flexible flow line
-
Deane RH, Moon SH (1992) Work flow control in the flexible flow line. Int J Flex Manuf Syst 3/4:217-235
-
(1992)
Int J Flex Manuf Syst
, vol.3
, Issue.4
, pp. 217-235
-
-
Deane, R.H.1
Moon, S.H.2
-
8
-
-
85033523101
-
A heuristic for component switching on SMD placement machines
-
Technical University of Berlin, Germany
-
Grunow M, Günther HO, Gronalt M, Zeller R (1996) A heuristic for component switching on SMD placement machines. Discussion Paper, Technical University of Berlin, Germany
-
(1996)
Discussion Paper
-
-
Grunow, M.1
Günther, H.O.2
Gronalt, M.3
Zeller, R.4
-
9
-
-
0348114629
-
Computergestützte Simulation eines hochautomatisierten Montagesystems
-
in German
-
Günther HO, Gronalt M, Piller F (1994) Computergestützte Simulation eines hochautomatisierten Montagesystems (in German). Management & Computer 2:25-32
-
(1994)
Management & Computer
, vol.2
, pp. 25-32
-
-
Günther, H.O.1
Gronalt, M.2
Piller, F.3
-
10
-
-
30244537734
-
A linear programming model for workload planning in printed circuit board assembly
-
Derigs U, Bachem A, Drexl A (eds) Springer, Berlin et al.
-
Günther HO, Gronalt M, Piller F (1995a) A linear programming model for workload planning in printed circuit board assembly. In: Derigs U, Bachem A, Drexl A (eds) Operations Research Proceedings 1994. Springer, Berlin et al., pp. 312-317
-
(1995)
Operations Research Proceedings 1994
, pp. 312-317
-
-
Günther, H.O.1
Gronalt, M.2
Piller, F.3
-
11
-
-
53249083813
-
Job sequencing and component setup on a surface mount placement machine
-
Technical University of Berlin, Germany
-
Günther HO, Gronalt M, Zeller R. (1995b) Job sequencing and component setup on a surface mount placement machine. Discussion Paper, Technical University of Berlin, Germany
-
(1995)
Discussion Paper
-
-
Günther, H.O.1
Gronalt, M.2
Zeller, R.3
-
12
-
-
0024126779
-
Throughput rate maximization in flexible manufacturing cells
-
Han MH, McGinnis LF (1988) Throughput rate maximization in flexible manufacturing cells. HE Transact 20:409-417
-
(1988)
HE Transact
, vol.20
, pp. 409-417
-
-
Han, M.H.1
McGinnis, L.F.2
-
13
-
-
0042667522
-
A heuristic algorithm for loading new work on circuit pack assembly lines
-
Johri PK (1990) A heuristic algorithm for loading new work on circuit pack assembly lines. Int J Prod Res 28:1871-1883
-
(1990)
Int J Prod Res
, vol.28
, pp. 1871-1883
-
-
Johri, P.K.1
-
14
-
-
0026955031
-
Similarity coefficient algorithms for solving the group technology problem
-
Kusiak A, Cho M (1992) Similarity coefficient algorithms for solving the group technology problem. Int J Prod Res 30: 2633-2646
-
(1992)
Int J Prod Res
, vol.30
, pp. 2633-2646
-
-
Kusiak, A.1
Cho, M.2
-
15
-
-
0026880159
-
The travelling salesman problem: An overview of exact and approximate algorithms
-
Laporte G (1992) The travelling salesman problem: An overview of exact and approximate algorithms. Eur J Oper Res 59: 231-247
-
(1992)
Eur J Oper Res
, vol.59
, pp. 231-247
-
-
Laporte, G.1
-
16
-
-
0027683679
-
Set-up saving schemes for printed circuit boards assembly
-
Maimon OZ, Dar-El EM, Carmon TF (1993) Set-up saving schemes for printed circuit boards assembly. Eur J Oper Res 70:177-190
-
(1993)
Eur J Oper Res
, vol.70
, pp. 177-190
-
-
Maimon, O.Z.1
Dar-El, E.M.2
Carmon, T.F.3
-
17
-
-
84941457782
-
Automated process planning for printed circuit card assembly
-
McGinnis LF, Ammons JC, Carlyle M, Cranmer L, Depuy GW, Ellis KP, Tovey CA, Xu H. (1992) Automated process planning for printed circuit card assembly. HE Transact 24:18-30
-
(1992)
HE Transact
, vol.24
, pp. 18-30
-
-
McGinnis, L.F.1
Ammons, J.C.2
Carlyle, M.3
Cranmer, L.4
Depuy, G.W.5
Ellis, K.P.6
Tovey, C.A.7
Xu, H.8
-
18
-
-
0027609116
-
A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine
-
Sadiq M, Landers TL, Taylor GD (1993) A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine. Int J Prod Res 31: 1327-1341
-
(1993)
Int J Prod Res
, vol.31
, pp. 1327-1341
-
-
Sadiq, M.1
Landers, T.L.2
Taylor, G.D.3
-
19
-
-
0023330067
-
On a formalisation of the process of quantitative model building
-
Schneeweiß Ch (1987) On a formalisation of the process of quantitative model building. Eur J Oper Res 29:24-41
-
(1987)
Eur J Oper Res
, vol.29
, pp. 24-41
-
-
Schneeweiß, Ch.1
-
20
-
-
0003039463
-
Hierarchical structures in organisations: A conceptual framework
-
Schneeweiß Ch (1995) Hierarchical structures in organisations: A conceptual framework. Eur J Oper Res 86:4-31
-
(1995)
Eur J Oper Res
, vol.86
, pp. 4-31
-
-
Schneeweiß, Ch.1
-
21
-
-
0027589547
-
Similarity and distance measures for cellular manufacturing. Part I. A survey
-
Shafer SM, Rogers DF (1993a) Similarity and distance measures for cellular manufacturing. Part I. A survey. Int J Prod Res 31:1133-1142
-
(1993)
Int J Prod Res
, vol.31
, pp. 1133-1142
-
-
Shafer, S.M.1
Rogers, D.F.2
-
22
-
-
0027610411
-
Similarity and distance measures for cellular manufacturing. Part II. An extension and comparison
-
Shafer SM, Rogers DF (1993b) Similarity and distance measures for cellular manufacturing. Part II. An extension and comparison. Int J Prod Res 31:1315-1326
-
(1993)
Int J Prod Res
, vol.31
, pp. 1315-1326
-
-
Shafer, S.M.1
Rogers, D.F.2
-
23
-
-
0024070715
-
Models arising from a flexible manufacturing machine, part I: Minimizing the number of tool switches
-
Tang CS, Denardo EV (1988) Models arising from a flexible manufacturing machine, part I: Minimizing the number of tool switches. Oper Res 36:767-784
-
(1988)
Oper Res
, vol.36
, pp. 767-784
-
-
Tang, C.S.1
Denardo, E.V.2
-
24
-
-
0000846302
-
Production preparation and numerical control in PCB assembly
-
van Laarhoven PJM, Zijm WHM (1993) Production preparation and numerical control in PCB assembly. Int J Flex Manuf Syst 5:187-207
-
(1993)
Int J Flex Manuf Syst
, vol.5
, pp. 187-207
-
-
Van Laarhoven, P.J.M.1
Zijm, W.H.M.2
-
25
-
-
0024016313
-
An adaptable scheduling algorithm for flexible flow lines
-
Wittrock RJ (1988) An adaptable scheduling algorithm for flexible flow lines. Oper Res 36:445-453
-
(1988)
Oper Res
, vol.36
, pp. 445-453
-
-
Wittrock, R.J.1
-
26
-
-
38249009650
-
The "Orchard" scheduler for manufacturing systems
-
Wittrock RJ (1992) The "Orchard" scheduler for manufacturing systems. Int J Prod Econ 28:47-70
-
(1992)
Int J Prod Econ
, vol.28
, pp. 47-70
-
-
Wittrock, R.J.1
|