메뉴 건너뛰기




Volumn 19, Issue 2, 1997, Pages 147-157

Workload planning in small lot printed circuit board assembly

Author keywords

Aggregational error; Decision support; Linear programming; Modelling; Printed circuit board assembly; Production; Scheduling

Indexed keywords


EID: 0001403566     PISSN: 01716468     EISSN: None     Source Type: Journal    
DOI: 10.1007/BF01545517     Document Type: Article
Times cited : (13)

References (27)
  • 1
    • 0027927407 scopus 로고
    • Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly
    • Ahmadi RH, Kouvelis P (1994) Staging problem of a dual delivery pick-and-place machine in printed circuit card assembly. Oper Res 42:81-91
    • (1994) Oper Res , vol.42 , pp. 81-91
    • Ahmadi, R.H.1    Kouvelis, P.2
  • 2
    • 0028480771 scopus 로고
    • Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell
    • Askin RG, Dror M, Vakharia AJ (1994) Printed circuit board family grouping and component allocation for a multimachine, open-shop assembly cell. Nav Res Log 41:587-608
    • (1994) Nav Res Log , vol.41 , pp. 587-608
    • Askin, R.G.1    Dror, M.2    Vakharia, A.J.3
  • 3
    • 0023981635 scopus 로고
    • Sequencing of insertions in printed circuit board assembly
    • Ball MO, Magazine MJ (1988) Sequencing of insertions in printed circuit board assembly. Oper Res 36:192-201
    • (1988) Oper Res , vol.36 , pp. 192-201
    • Ball, M.O.1    Magazine, M.J.2
  • 4
    • 0028101641 scopus 로고
    • Machine setup and component placement in printed circuit board assembly
    • Bard JF, Clayton RW, Feo TA (1994) Machine setup and component placement in printed circuit board assembly. Int J Flex Manuf Syst 6:5-31
    • (1994) Int J Flex Manuf Syst , vol.6 , pp. 5-31
    • Bard, J.F.1    Clayton, R.W.2    Feo, T.A.3
  • 5
    • 0000411581 scopus 로고
    • Throughput rate optimization in the automated assembly of printed circuit boards
    • Crama Y, Kolen AWJ, Oerlemans AG, Spieksma FCR (1990) Throughput rate optimization in the automated assembly of printed circuit boards. Ann Opers Res 26:455-480
    • (1990) Ann Opers Res , vol.26 , pp. 455-480
    • Crama, Y.1    Kolen, A.W.J.2    Oerlemans, A.G.3    Spieksma, F.C.R.4
  • 7
    • 0010490924 scopus 로고
    • Work flow control in the flexible flow line
    • Deane RH, Moon SH (1992) Work flow control in the flexible flow line. Int J Flex Manuf Syst 3/4:217-235
    • (1992) Int J Flex Manuf Syst , vol.3 , Issue.4 , pp. 217-235
    • Deane, R.H.1    Moon, S.H.2
  • 8
    • 85033523101 scopus 로고    scopus 로고
    • A heuristic for component switching on SMD placement machines
    • Technical University of Berlin, Germany
    • Grunow M, Günther HO, Gronalt M, Zeller R (1996) A heuristic for component switching on SMD placement machines. Discussion Paper, Technical University of Berlin, Germany
    • (1996) Discussion Paper
    • Grunow, M.1    Günther, H.O.2    Gronalt, M.3    Zeller, R.4
  • 9
    • 0348114629 scopus 로고
    • Computergestützte Simulation eines hochautomatisierten Montagesystems
    • in German
    • Günther HO, Gronalt M, Piller F (1994) Computergestützte Simulation eines hochautomatisierten Montagesystems (in German). Management & Computer 2:25-32
    • (1994) Management & Computer , vol.2 , pp. 25-32
    • Günther, H.O.1    Gronalt, M.2    Piller, F.3
  • 10
    • 30244537734 scopus 로고
    • A linear programming model for workload planning in printed circuit board assembly
    • Derigs U, Bachem A, Drexl A (eds) Springer, Berlin et al.
    • Günther HO, Gronalt M, Piller F (1995a) A linear programming model for workload planning in printed circuit board assembly. In: Derigs U, Bachem A, Drexl A (eds) Operations Research Proceedings 1994. Springer, Berlin et al., pp. 312-317
    • (1995) Operations Research Proceedings 1994 , pp. 312-317
    • Günther, H.O.1    Gronalt, M.2    Piller, F.3
  • 11
    • 53249083813 scopus 로고
    • Job sequencing and component setup on a surface mount placement machine
    • Technical University of Berlin, Germany
    • Günther HO, Gronalt M, Zeller R. (1995b) Job sequencing and component setup on a surface mount placement machine. Discussion Paper, Technical University of Berlin, Germany
    • (1995) Discussion Paper
    • Günther, H.O.1    Gronalt, M.2    Zeller, R.3
  • 12
    • 0024126779 scopus 로고
    • Throughput rate maximization in flexible manufacturing cells
    • Han MH, McGinnis LF (1988) Throughput rate maximization in flexible manufacturing cells. HE Transact 20:409-417
    • (1988) HE Transact , vol.20 , pp. 409-417
    • Han, M.H.1    McGinnis, L.F.2
  • 13
    • 0042667522 scopus 로고
    • A heuristic algorithm for loading new work on circuit pack assembly lines
    • Johri PK (1990) A heuristic algorithm for loading new work on circuit pack assembly lines. Int J Prod Res 28:1871-1883
    • (1990) Int J Prod Res , vol.28 , pp. 1871-1883
    • Johri, P.K.1
  • 14
    • 0026955031 scopus 로고
    • Similarity coefficient algorithms for solving the group technology problem
    • Kusiak A, Cho M (1992) Similarity coefficient algorithms for solving the group technology problem. Int J Prod Res 30: 2633-2646
    • (1992) Int J Prod Res , vol.30 , pp. 2633-2646
    • Kusiak, A.1    Cho, M.2
  • 15
    • 0026880159 scopus 로고
    • The travelling salesman problem: An overview of exact and approximate algorithms
    • Laporte G (1992) The travelling salesman problem: An overview of exact and approximate algorithms. Eur J Oper Res 59: 231-247
    • (1992) Eur J Oper Res , vol.59 , pp. 231-247
    • Laporte, G.1
  • 16
    • 0027683679 scopus 로고
    • Set-up saving schemes for printed circuit boards assembly
    • Maimon OZ, Dar-El EM, Carmon TF (1993) Set-up saving schemes for printed circuit boards assembly. Eur J Oper Res 70:177-190
    • (1993) Eur J Oper Res , vol.70 , pp. 177-190
    • Maimon, O.Z.1    Dar-El, E.M.2    Carmon, T.F.3
  • 18
    • 0027609116 scopus 로고
    • A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine
    • Sadiq M, Landers TL, Taylor GD (1993) A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine. Int J Prod Res 31: 1327-1341
    • (1993) Int J Prod Res , vol.31 , pp. 1327-1341
    • Sadiq, M.1    Landers, T.L.2    Taylor, G.D.3
  • 19
    • 0023330067 scopus 로고
    • On a formalisation of the process of quantitative model building
    • Schneeweiß Ch (1987) On a formalisation of the process of quantitative model building. Eur J Oper Res 29:24-41
    • (1987) Eur J Oper Res , vol.29 , pp. 24-41
    • Schneeweiß, Ch.1
  • 20
    • 0003039463 scopus 로고
    • Hierarchical structures in organisations: A conceptual framework
    • Schneeweiß Ch (1995) Hierarchical structures in organisations: A conceptual framework. Eur J Oper Res 86:4-31
    • (1995) Eur J Oper Res , vol.86 , pp. 4-31
    • Schneeweiß, Ch.1
  • 21
    • 0027589547 scopus 로고
    • Similarity and distance measures for cellular manufacturing. Part I. A survey
    • Shafer SM, Rogers DF (1993a) Similarity and distance measures for cellular manufacturing. Part I. A survey. Int J Prod Res 31:1133-1142
    • (1993) Int J Prod Res , vol.31 , pp. 1133-1142
    • Shafer, S.M.1    Rogers, D.F.2
  • 22
    • 0027610411 scopus 로고
    • Similarity and distance measures for cellular manufacturing. Part II. An extension and comparison
    • Shafer SM, Rogers DF (1993b) Similarity and distance measures for cellular manufacturing. Part II. An extension and comparison. Int J Prod Res 31:1315-1326
    • (1993) Int J Prod Res , vol.31 , pp. 1315-1326
    • Shafer, S.M.1    Rogers, D.F.2
  • 23
    • 0024070715 scopus 로고
    • Models arising from a flexible manufacturing machine, part I: Minimizing the number of tool switches
    • Tang CS, Denardo EV (1988) Models arising from a flexible manufacturing machine, part I: Minimizing the number of tool switches. Oper Res 36:767-784
    • (1988) Oper Res , vol.36 , pp. 767-784
    • Tang, C.S.1    Denardo, E.V.2
  • 24
    • 0000846302 scopus 로고
    • Production preparation and numerical control in PCB assembly
    • van Laarhoven PJM, Zijm WHM (1993) Production preparation and numerical control in PCB assembly. Int J Flex Manuf Syst 5:187-207
    • (1993) Int J Flex Manuf Syst , vol.5 , pp. 187-207
    • Van Laarhoven, P.J.M.1    Zijm, W.H.M.2
  • 25
    • 0024016313 scopus 로고
    • An adaptable scheduling algorithm for flexible flow lines
    • Wittrock RJ (1988) An adaptable scheduling algorithm for flexible flow lines. Oper Res 36:445-453
    • (1988) Oper Res , vol.36 , pp. 445-453
    • Wittrock, R.J.1
  • 26
    • 38249009650 scopus 로고
    • The "Orchard" scheduler for manufacturing systems
    • Wittrock RJ (1992) The "Orchard" scheduler for manufacturing systems. Int J Prod Econ 28:47-70
    • (1992) Int J Prod Econ , vol.28 , pp. 47-70
    • Wittrock, R.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.