메뉴 건너뛰기




Volumn 42, Issue 11, 1996, Pages 1544-1555

Heuristics for multimachine scheduling problems with earliness and tardiness costs

(2)  Federgruen, A a   Mosheiov, G a  

a NONE

Author keywords

Asymptotic and Probabilistic Analysis; Earliness and Tardiness Costs; Heuristics; Multimachine Scheduling; Worst Case

Indexed keywords


EID: 0001155594     PISSN: 00251909     EISSN: None     Source Type: Journal    
DOI: 10.1287/mnsc.42.11.1544     Document Type: Article
Times cited : (41)

References (27)
  • 1
    • 0001723283 scopus 로고
    • Minimizing Mean Squared Deviation of Completion Time about a Common Due Date
    • Bagchi, U., R. Sullivan, and Y. Chang, "Minimizing Mean Squared Deviation of Completion Time about a Common Due Date," Management Sci., 33 (1987), 894-906.
    • (1987) Management Sci. , vol.33 , pp. 894-906
    • Bagchi, U.1    Sullivan, R.2    Chang, Y.3
  • 2
    • 0025211593 scopus 로고
    • Sequencing with Earliness and Tardiness Penalties: A Review
    • Baker, K. and G. Scudder, "Sequencing with Earliness and Tardiness Penalties: A Review," Oper. Res., 38, 1 (1990), 22-36.
    • (1990) Oper. Res. , vol.38 , Issue.1 , pp. 22-36
    • Baker, K.1    Scudder, G.2
  • 4
    • 0001254311 scopus 로고
    • On the Minimization of Completion Time Variance with a Bio Extension
    • De, P., J. Ghosh, and C. Wells, "On the Minimization of Completion Time Variance with a Bio Extension," Oper. Res., 40 (1992), 1148-1155.
    • (1992) Oper. Res. , vol.40 , pp. 1148-1155
    • De, P.1    Ghosh, J.2    Wells, C.3
  • 5
    • 0000462006 scopus 로고
    • A Note on the Minimization of Mean Squared Deviation of Completion Times about a Common Due Date
    • _, _, and _, "A Note on the Minimization of Mean Squared Deviation of Completion Times about a Common Due Date," Management Sci., 35 (1989), 1143-1147.
    • (1989) Management Sci. , vol.35 , pp. 1143-1147
  • 6
    • 0017460225 scopus 로고
    • Minimizing Waiting-time Variance in the Single Machine Problem
    • Eilon, S. and I. Chowdhury, "Minimizing Waiting-time Variance in the Single Machine Problem," Management Sci., 23 (1977), 567-575.
    • (1977) Management Sci. , vol.23 , pp. 567-575
    • Eilon, S.1    Chowdhury, I.2
  • 7
    • 0023531467 scopus 로고
    • Scheduling to a Common Due Date on Parallel Common Processors
    • Emmons, H., "Scheduling to a Common Due Date on Parallel Common Processors," Naval Res. Logistics Quarterly, 34 (1987), 803-810.
    • (1987) Naval Res. Logistics Quarterly , vol.34 , pp. 803-810
    • Emmons, H.1
  • 8
    • 0027886805 scopus 로고
    • Simultaneous Optimization of Efficiency and Performance Balance Measures in Single Machine Scheduling Problems
    • Federgruen, A. and G. Mosheiov, "Simultaneous Optimization of Efficiency and Performance Balance Measures in Single Machine Scheduling Problems," Naval Res. Logistics Quarterly, 40 (1993), 951-970.
    • (1993) Naval Res. Logistics Quarterly , vol.40 , pp. 951-970
    • Federgruen, A.1    Mosheiov, G.2
  • 9
    • 85033866595 scopus 로고
    • Working Paper, Graduate School of Business, Columbia University, New York (unabridged version of this paper)
    • _ and _, "Heuristics for Multi-Machine Scheduling Problems with Earliness and Tardiness Costs," Working Paper, Graduate School of Business, Columbia University, New York (unabridged version of this paper), 1994.
    • (1994) Heuristics for Multi-Machine Scheduling Problems with Earliness and Tardiness Costs
  • 10
    • 0025476901 scopus 로고
    • Minimizing the Flow-time Variance in Single-Machine Systems
    • Gupta, M., K. Gupta, and C. Bector, "Minimizing the Flow-time Variance in Single-Machine Systems," J. Opl. Res. Soc., 41 (1990), 767-779.
    • (1990) J. Opl. Res. Soc. , vol.41 , pp. 767-779
    • Gupta, M.1    Gupta, K.2    Bector, C.3
  • 11
    • 0002393136 scopus 로고
    • Single- and Multiple-processor Models for Minimizing Completion-time Variance
    • Hall, N., "Single- and Multiple-processor Models for Minimizing Completion-time Variance," Naval Res. Logistics Quarterly, 33 (1986), 49-54.
    • (1986) Naval Res. Logistics Quarterly , vol.33 , pp. 49-54
    • Hall, N.1
  • 12
    • 0004102424 scopus 로고
    • Dow Jones-Irwin, Homewood, IL
    • Hall, R., Zero Inventories, Dow Jones-Irwin, Homewood, IL, 1983.
    • (1983) Zero Inventories
    • Hall, R.1
  • 13
    • 0001406380 scopus 로고
    • Proof of a Conjecture of Schrage about the Completion Time Variance Problem
    • _ and W. Kubiak, "Proof of a Conjecture of Schrage about the Completion Time Variance Problem," Oper. Res. Letters, 10 (1991), 467-472.
    • (1991) Oper. Res. Letters , vol.10 , pp. 467-472
    • Kubiak, W.1
  • 14
    • 85034930836 scopus 로고
    • Deviation of Completion Times about a Restrictive Common Due Date
    • _, _, and S. Sethi, "Deviation of Completion Times about a Restrictive Common Due Date," Oper. Res., 39 (1991), 847-856.
    • (1991) Oper. Res. , vol.39 , pp. 847-856
    • Sethi, S.1
  • 15
  • 16
    • 0019702937 scopus 로고
    • Minimizing the Average Deviation of Job Completion-times about a Common Due-date
    • Kanet, J., "Minimizing the Average Deviation of Job Completion-times about a Common Due-date," Naval Res. Logistics Quarterly, 28 (1981), 643-651.
    • (1981) Naval Res. Logistics Quarterly , vol.28 , pp. 643-651
    • Kanet, J.1
  • 17
    • 0027256856 scopus 로고
    • Scheduling with Monotonous Earliness and Tardiness Penalties
    • Kahlbacher, H., "Scheduling with Monotonous Earliness and Tardiness Penalties," European J. Oper. Res., 64 (1992), 258-277.
    • (1992) European J. Oper. Res. , vol.64 , pp. 258-277
    • Kahlbacher, H.1
  • 18
    • 0025519036 scopus 로고
    • Equivalence of Mean Flow Time Problems and Mean Absolute Deviation Problems
    • Kubiak, W., S. Low, and S. Sethi, "Equivalence of Mean Flow Time Problems and Mean Absolute Deviation Problems," Oper. Res. Letters, 9 (1990), 371-374.
    • (1990) Oper. Res. Letters , vol.9 , pp. 371-374
    • Kubiak, W.1    Low, S.2    Sethi, S.3
  • 19
    • 0027644930 scopus 로고
    • Completion Time Variance Minimization on a Single Machine is Difficult
    • _, "Completion Time Variance Minimization on a Single Machine is Difficult," Oper. Res. Letters, 14 (1993b), 49-59.
    • (1993) Oper. Res. Letters , vol.14 , pp. 49-59
  • 20
    • 85033850181 scopus 로고    scopus 로고
    • New Results on the Completion Time Variance Minimization
    • to appear
    • _, "New Results on the Completion Time Variance Minimization," to appear in Discrete Applied Mathematics.
    • Discrete Applied Mathematics
  • 21
    • 0001127702 scopus 로고
    • Variance Minimization in Single Machine Sequencing Problems
    • Merten, A. and M. Muller, "Variance Minimization in Single Machine Sequencing Problems," Management Sci., 18 (1972), 518-528.
    • (1972) Management Sci. , vol.18 , pp. 518-528
    • Merten, A.1    Muller, M.2
  • 22
    • 0003449926 scopus 로고
    • Institute of Industrial Engineering Press, Norcross, GA
    • Monden, Y., Toyota Production System, Institute of Industrial Engineering Press, Norcross, GA, 1983.
    • (1983) Toyota Production System
    • Monden, Y.1
  • 24
    • 0001459264 scopus 로고
    • Minimizing the Time-in-system Variance for a Finite Jobset
    • Schrage, L., "Minimizing the Time-in-system Variance for a Finite Jobset," Management Sci., 21 (1975), 540-543.
    • (1975) Management Sci. , vol.21 , pp. 540-543
    • Schrage, L.1
  • 25
    • 0021439811 scopus 로고
    • Minimizing the Sum of Absolute Lateness in Single-machine and Multi-machine Scheduling
    • Sundararaghavan, P. and M. Ahmed, "Minimizing the Sum of Absolute Lateness in Single-machine and Multi-machine Scheduling," Naval Res. Logistics Quarterly, 31 (1984), 325-333.
    • (1984) Naval Res. Logistics Quarterly , vol.31 , pp. 325-333
    • Sundararaghavan, P.1    Ahmed, M.2
  • 26
    • 0023170104 scopus 로고
    • Deterministic and Random Single Machine Sequencing with Variance Minimization
    • Vani, V. and M. Raghavachari, "Deterministic and Random Single Machine Sequencing with Variance Minimization," Oper. Res., 35 (1987), 111-120.
    • (1987) Oper. Res. , vol.35 , pp. 111-120
    • Vani, V.1    Raghavachari, M.2
  • 27
    • 85033854364 scopus 로고    scopus 로고
    • Minimizing the Single-Machine Completion Time Variances
    • to appear
    • Ventura, J. and X. Weng, "Minimizing the Single-Machine Completion Time Variances," to appear in Management Sci.
    • Management Sci.
    • Ventura, J.1    Weng, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.