-
1
-
-
0001723283
-
Minimizing Mean Squared Deviation of Completion Time about a Common Due Date
-
Bagchi, U., R. Sullivan, and Y. Chang, "Minimizing Mean Squared Deviation of Completion Time about a Common Due Date," Management Sci., 33 (1987), 894-906.
-
(1987)
Management Sci.
, vol.33
, pp. 894-906
-
-
Bagchi, U.1
Sullivan, R.2
Chang, Y.3
-
2
-
-
0025211593
-
Sequencing with Earliness and Tardiness Penalties: A Review
-
Baker, K. and G. Scudder, "Sequencing with Earliness and Tardiness Penalties: A Review," Oper. Res., 38, 1 (1990), 22-36.
-
(1990)
Oper. Res.
, vol.38
, Issue.1
, pp. 22-36
-
-
Baker, K.1
Scudder, G.2
-
4
-
-
0001254311
-
On the Minimization of Completion Time Variance with a Bio Extension
-
De, P., J. Ghosh, and C. Wells, "On the Minimization of Completion Time Variance with a Bio Extension," Oper. Res., 40 (1992), 1148-1155.
-
(1992)
Oper. Res.
, vol.40
, pp. 1148-1155
-
-
De, P.1
Ghosh, J.2
Wells, C.3
-
5
-
-
0000462006
-
A Note on the Minimization of Mean Squared Deviation of Completion Times about a Common Due Date
-
_, _, and _, "A Note on the Minimization of Mean Squared Deviation of Completion Times about a Common Due Date," Management Sci., 35 (1989), 1143-1147.
-
(1989)
Management Sci.
, vol.35
, pp. 1143-1147
-
-
-
6
-
-
0017460225
-
Minimizing Waiting-time Variance in the Single Machine Problem
-
Eilon, S. and I. Chowdhury, "Minimizing Waiting-time Variance in the Single Machine Problem," Management Sci., 23 (1977), 567-575.
-
(1977)
Management Sci.
, vol.23
, pp. 567-575
-
-
Eilon, S.1
Chowdhury, I.2
-
7
-
-
0023531467
-
Scheduling to a Common Due Date on Parallel Common Processors
-
Emmons, H., "Scheduling to a Common Due Date on Parallel Common Processors," Naval Res. Logistics Quarterly, 34 (1987), 803-810.
-
(1987)
Naval Res. Logistics Quarterly
, vol.34
, pp. 803-810
-
-
Emmons, H.1
-
8
-
-
0027886805
-
Simultaneous Optimization of Efficiency and Performance Balance Measures in Single Machine Scheduling Problems
-
Federgruen, A. and G. Mosheiov, "Simultaneous Optimization of Efficiency and Performance Balance Measures in Single Machine Scheduling Problems," Naval Res. Logistics Quarterly, 40 (1993), 951-970.
-
(1993)
Naval Res. Logistics Quarterly
, vol.40
, pp. 951-970
-
-
Federgruen, A.1
Mosheiov, G.2
-
9
-
-
85033866595
-
-
Working Paper, Graduate School of Business, Columbia University, New York (unabridged version of this paper)
-
_ and _, "Heuristics for Multi-Machine Scheduling Problems with Earliness and Tardiness Costs," Working Paper, Graduate School of Business, Columbia University, New York (unabridged version of this paper), 1994.
-
(1994)
Heuristics for Multi-Machine Scheduling Problems with Earliness and Tardiness Costs
-
-
-
10
-
-
0025476901
-
Minimizing the Flow-time Variance in Single-Machine Systems
-
Gupta, M., K. Gupta, and C. Bector, "Minimizing the Flow-time Variance in Single-Machine Systems," J. Opl. Res. Soc., 41 (1990), 767-779.
-
(1990)
J. Opl. Res. Soc.
, vol.41
, pp. 767-779
-
-
Gupta, M.1
Gupta, K.2
Bector, C.3
-
11
-
-
0002393136
-
Single- and Multiple-processor Models for Minimizing Completion-time Variance
-
Hall, N., "Single- and Multiple-processor Models for Minimizing Completion-time Variance," Naval Res. Logistics Quarterly, 33 (1986), 49-54.
-
(1986)
Naval Res. Logistics Quarterly
, vol.33
, pp. 49-54
-
-
Hall, N.1
-
12
-
-
0004102424
-
-
Dow Jones-Irwin, Homewood, IL
-
Hall, R., Zero Inventories, Dow Jones-Irwin, Homewood, IL, 1983.
-
(1983)
Zero Inventories
-
-
Hall, R.1
-
13
-
-
0001406380
-
Proof of a Conjecture of Schrage about the Completion Time Variance Problem
-
_ and W. Kubiak, "Proof of a Conjecture of Schrage about the Completion Time Variance Problem," Oper. Res. Letters, 10 (1991), 467-472.
-
(1991)
Oper. Res. Letters
, vol.10
, pp. 467-472
-
-
Kubiak, W.1
-
14
-
-
85034930836
-
Deviation of Completion Times about a Restrictive Common Due Date
-
_, _, and S. Sethi, "Deviation of Completion Times about a Restrictive Common Due Date," Oper. Res., 39 (1991), 847-856.
-
(1991)
Oper. Res.
, vol.39
, pp. 847-856
-
-
Sethi, S.1
-
15
-
-
5544224618
-
-
Working Paper, Faculty of Business Administration, Memorial University of Newfoundland, St. John, Newfoundland
-
Jozefowska, J. and W. Kubiak, "Spectral Algorithms for the Completion Time Variance Problems," Working Paper, Faculty of Business Administration, Memorial University of Newfoundland, St. John, Newfoundland, 1993.
-
(1993)
Spectral Algorithms for the Completion Time Variance Problems
-
-
Jozefowska, J.1
Kubiak, W.2
-
16
-
-
0019702937
-
Minimizing the Average Deviation of Job Completion-times about a Common Due-date
-
Kanet, J., "Minimizing the Average Deviation of Job Completion-times about a Common Due-date," Naval Res. Logistics Quarterly, 28 (1981), 643-651.
-
(1981)
Naval Res. Logistics Quarterly
, vol.28
, pp. 643-651
-
-
Kanet, J.1
-
17
-
-
0027256856
-
Scheduling with Monotonous Earliness and Tardiness Penalties
-
Kahlbacher, H., "Scheduling with Monotonous Earliness and Tardiness Penalties," European J. Oper. Res., 64 (1992), 258-277.
-
(1992)
European J. Oper. Res.
, vol.64
, pp. 258-277
-
-
Kahlbacher, H.1
-
18
-
-
0025519036
-
Equivalence of Mean Flow Time Problems and Mean Absolute Deviation Problems
-
Kubiak, W., S. Low, and S. Sethi, "Equivalence of Mean Flow Time Problems and Mean Absolute Deviation Problems," Oper. Res. Letters, 9 (1990), 371-374.
-
(1990)
Oper. Res. Letters
, vol.9
, pp. 371-374
-
-
Kubiak, W.1
Low, S.2
Sethi, S.3
-
19
-
-
0027644930
-
Completion Time Variance Minimization on a Single Machine is Difficult
-
_, "Completion Time Variance Minimization on a Single Machine is Difficult," Oper. Res. Letters, 14 (1993b), 49-59.
-
(1993)
Oper. Res. Letters
, vol.14
, pp. 49-59
-
-
-
20
-
-
85033850181
-
New Results on the Completion Time Variance Minimization
-
to appear
-
_, "New Results on the Completion Time Variance Minimization," to appear in Discrete Applied Mathematics.
-
Discrete Applied Mathematics
-
-
-
21
-
-
0001127702
-
Variance Minimization in Single Machine Sequencing Problems
-
Merten, A. and M. Muller, "Variance Minimization in Single Machine Sequencing Problems," Management Sci., 18 (1972), 518-528.
-
(1972)
Management Sci.
, vol.18
, pp. 518-528
-
-
Merten, A.1
Muller, M.2
-
22
-
-
0003449926
-
-
Institute of Industrial Engineering Press, Norcross, GA
-
Monden, Y., Toyota Production System, Institute of Industrial Engineering Press, Norcross, GA, 1983.
-
(1983)
Toyota Production System
-
-
Monden, Y.1
-
24
-
-
0001459264
-
Minimizing the Time-in-system Variance for a Finite Jobset
-
Schrage, L., "Minimizing the Time-in-system Variance for a Finite Jobset," Management Sci., 21 (1975), 540-543.
-
(1975)
Management Sci.
, vol.21
, pp. 540-543
-
-
Schrage, L.1
-
25
-
-
0021439811
-
Minimizing the Sum of Absolute Lateness in Single-machine and Multi-machine Scheduling
-
Sundararaghavan, P. and M. Ahmed, "Minimizing the Sum of Absolute Lateness in Single-machine and Multi-machine Scheduling," Naval Res. Logistics Quarterly, 31 (1984), 325-333.
-
(1984)
Naval Res. Logistics Quarterly
, vol.31
, pp. 325-333
-
-
Sundararaghavan, P.1
Ahmed, M.2
-
26
-
-
0023170104
-
Deterministic and Random Single Machine Sequencing with Variance Minimization
-
Vani, V. and M. Raghavachari, "Deterministic and Random Single Machine Sequencing with Variance Minimization," Oper. Res., 35 (1987), 111-120.
-
(1987)
Oper. Res.
, vol.35
, pp. 111-120
-
-
Vani, V.1
Raghavachari, M.2
-
27
-
-
85033854364
-
Minimizing the Single-Machine Completion Time Variances
-
to appear
-
Ventura, J. and X. Weng, "Minimizing the Single-Machine Completion Time Variances," to appear in Management Sci.
-
Management Sci.
-
-
Ventura, J.1
Weng, X.2
|