메뉴 건너뛰기




Volumn 38, Issue 2-3, 1995, Pages 173-188

Layout design in group technology manufacturing

(1)  Hassan, Mohsen M D a  

a NONE   (United States)

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0000839571     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/0925-5273(94)00090-W     Document Type: Article
Times cited : (66)

References (56)
  • 3
    • 0343578349 scopus 로고
    • Plant layout becomes productoriented with cellular, Just-In-Time production concepts
    • (1983) Ind. Eng. , vol.15 , Issue.11 , pp. 66-71
    • Schonberger1
  • 5
    • 0022785585 scopus 로고
    • A simulation comparison of group technology with traditional job shop manufacturing
    • (1986) Int. J. Prod. Res. , vol.24 , Issue.5 , pp. 1171-1192
    • Flynn1    Jacobs2
  • 8
    • 0025560330 scopus 로고
    • A simulation analysis of factors influencing the attractiveness of group technology cellular layouts
    • (1990) Mgmt. Sci. , vol.36 , Issue.12 , pp. 1567-1578
    • Morris1    Tersine2
  • 11
    • 0002425865 scopus 로고
    • Production flow analysis for planning group technology
    • (1991) J. Oper. Mgmt. , vol.10 , Issue.1 , pp. 5-25
    • Burbidge1
  • 12
    • 0009353453 scopus 로고
    • Methods of cell formation in group technology: A framework for evaluation
    • (1986) J. Oper. Mgmt. , vol.6 , Issue.3 , pp. 257-271
    • Vakharia1
  • 14
    • 0025399180 scopus 로고
    • Designing a cellular manufacturing system: A material flow approach based on operation sequences
    • (1990) IIE Trans. , vol.22 , Issue.1 , pp. 84-97
    • Vakharia1    Wemmerlov2
  • 18
    • 0028436424 scopus 로고
    • Cell formation: the need for an integrated solution of the subproblems
    • (1994) Int. J. Prod. Res. , vol.32 , Issue.5 , pp. 1197-1218
    • Arvindh1    Irani2
  • 20
    • 0042048853 scopus 로고
    • Cluster analysis in manufacturing cellular formation
    • (1989) Omega , vol.17 , Issue.3 , pp. 289-295
    • Chu1
  • 21
    • 0013360522 scopus 로고
    • Algorithms for grouping machine groups in group technology
    • (1992) Omega , vol.20 , Issue.4 , pp. 493-501
    • Cheng1
  • 22
    • 0027589547 scopus 로고
    • Similarity and distance measures for cellular manufacturing. Part I.A survey
    • (1993) Int. J. Prod. Res. , vol.31 , Issue.5 , pp. 1133-1142
    • Shafer1    Rogers2
  • 23
    • 0020388157 scopus 로고
    • Direct clustering algorithm for group formation in cellular manufacture
    • (1982) J. Manuf. Systems , vol.1 , Issue.1 , pp. 65-75
    • Chan1    Milner2
  • 24
    • 0018991743 scopus 로고
    • Machine-component grouping in production flow analysis: An approach using a rank and order clustering algorithm
    • (1980) Int. J. Prod. Res. , vol.18 , Issue.2 , pp. 213-232
    • King1
  • 26
    • 0023416523 scopus 로고
    • Selection of a threshold value based on material handling cost in machinecomponent grouping
    • (1987) IIE Trans. , vol.19 , Issue.3 , pp. 266-270
    • Seifoddini1    Wolfe2
  • 28
    • 0019037823 scopus 로고
    • The use of similarity coefficients in production flow analysis
    • (1980) Int. J. Prod. Res. , vol.18 , Issue.4 , pp. 503-514
    • De Witte1
  • 29
    • 0025476266 scopus 로고
    • A group partitioning procedure for machine assignment and cell formation in group technology
    • (1990) Int. J. Prod. Res. , vol.28 , Issue.8 , pp. 1555
    • Askin1    Chiu2
  • 31
    • 0026220688 scopus 로고
    • Machine capacity planning in group technology
    • (1991) Int. J. Prod. Res. , vol.29 , Issue.9 , pp. 1909-1922
    • Sule1
  • 32
    • 0026114847 scopus 로고
    • Impact of sequence of operations and layout of cells in cellular manufacturing
    • (1991) Int. J. Prod. Res. , vol.29 , Issue.2 , pp. 375-390
    • Logendran1
  • 36
    • 0011746302 scopus 로고
    • A tree search algorithm for designing a cellular manufacturing system
    • (1993) Omega , vol.21 , Issue.4 , pp. 489-496
    • Cheng1
  • 37
    • 0024699683 scopus 로고
    • A note on the similarity coefficient method and the problem of improper machine assignment in group technology applications
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.7 , pp. 1161-1165
    • Seifoddini1
  • 42
    • 0000122258 scopus 로고
    • A survey of layout issues in flexible manufacturing systems
    • (1992) Omega , vol.20 , Issue.3 , pp. 375-390
    • Kouvelis1    Chiang2    Kiran3
  • 44
    • 0015671595 scopus 로고
    • Numerical taxonomy applied to group technology and plant layout
    • (1973) Int. J. Prod. Res. , vol.11 , Issue.4 , pp. 399-416
    • Carrie1
  • 47
    • 38249036528 scopus 로고
    • A review of graph theory application to the facilities layout problem
    • (1987) Omega , vol.15 , Issue.4 , pp. 291-300
    • Hassan1    Hogg2
  • 49
    • 0016638023 scopus 로고
    • Computerized layout design: A branch and bound approach
    • (1975) IIE Trans. , vol.7 , Issue.4 , pp. 432-437
    • Bazaraa1
  • 52
    • 0027544784 scopus 로고
    • A facility layout method for flexible manufacturing systems
    • (1993) Int. J. Prod. Res. , vol.31 , Issue.2 , pp. 279-297
    • Das1
  • 53
    • 0027698986 scopus 로고
    • A construction algorithm for the machine layout problem with fixed pickup and drop-off points
    • (1993) Int. J. Prod. Res. , vol.31 , Issue.11 , pp. 2575-2590
    • Welgama1    Gibson2
  • 54
    • 0017677217 scopus 로고
    • Flexible cell production systems — a realistic approach
    • (1977) Ann. CIRP , vol.25 , Issue.1 , pp. 269-271
    • Tilsley1    Lewis2
  • 56
    • 0027574249 scopus 로고
    • Virtual manufacturing cells: exploiting layout design and intercell flows for the machine sharing problem
    • (1993) Int. J. Prod. Res. , vol.31 , Issue.4 , pp. 791-810
    • Irani1    Cavalier2    Cohen3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.