메뉴 건너뛰기




Volumn , Issue , 1998, Pages 195-201

Automation infrastructure system for a robotic 30-ton bridge crane

Author keywords

Bridges; Construction; Control systems; Cranes; Probe instruments; Robotics

Indexed keywords

BRIDGE CRANES; BRIDGES; CABLES; CONSTRUCTION; CONTROL SYSTEMS; CRANES; INDUSTRIAL PLANTS; INTERFACE STATES;

EID: 0000605712     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/40337(205)29     Document Type: Conference Paper
Times cited : (2)

References (4)
  • 2
    • 84904810972 scopus 로고
    • March 30-31 NIST Construction Automation Program Report No. 2, NISTIR 5856, National Institute of Standards and Technology, Gaithersburg, MD, May 1996 29-42
    • Stone, W.C., Ed., Proceedings of the NIST Construction Automation Workshop, March 30-31, 1995, NIST Construction Automation Program Report No. 2, NISTIR 5856, National Institute of Standards and Technology, Gaithersburg, MD, May 1996, pp 13-22; 29-42.
    • (1995) Proceedings of the NIST Construction Automation Workshop , pp. 13-22
    • Austin, T.X.1    Stone, W.C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.