-
2
-
-
0002869954
-
Extending CHIP in order to solve complex scheduling and placement problems
-
A. AGGOUN and N. BELDECEANU, Extending CHIP in order to solve complex scheduling and placement problems, Mathematical and computer modelling, 1993, 17, (7), pp. 57-73.
-
(1993)
Mathematical and Computer Modelling
, vol.17
, Issue.7
, pp. 57-73
-
-
Aggoun, A.1
Beldeceanu, N.2
-
4
-
-
0004176585
-
-
Chapman & Hall
-
A. BAUER, R. BOWDEN, J. BROWNE, J. DUGGAN and G. LYONS, Shop floor Control Systems - From design to implementation, 1991, Chapman & Hall.
-
(1991)
Shop Floor Control Systems - From Design to Implementation
-
-
Bauer, A.1
Bowden, R.2
Browne, J.3
Duggan, J.4
Lyons, G.5
-
5
-
-
0026380881
-
Une caractérisation analytique des ordonnancements admissibles sous contraintes hétérogènes en flow-shop
-
P. BAPTISTE, C. H. CHO, J. FAVREL et M. ZOUHRI, Une caractérisation analytique des ordonnancements admissibles sous contraintes hétérogènes en flow-shop, RAIRO-APII, 1991, 25, pp. 87-102.
-
(1991)
RAIRO-APII
, vol.25
, pp. 87-102
-
-
Baptiste, P.1
Cho, C.H.2
Favrel, J.3
Zouhri, M.4
-
6
-
-
11744347905
-
Sequences constraint solver based on P-Q-R trees
-
New York
-
P. BAPTISTE, B. LEGEARD and H. ZIDOUM, Sequences constraint solver based on P-Q-R trees, ILPS'94, New York, 1994, 14 p.
-
(1994)
ILPS'94
-
-
Baptiste, P.1
Legeard, B.2
Zidoum, H.3
-
9
-
-
85030076898
-
Problèmes d'ordonnancement en Flowshop: Réseaux de Petri et PLC
-
Université de Tours, France
-
C. CAVALIER, N. JACQUET and P. RICHARD, Problèmes d'ordonnancement en Flowshop: Réseaux de Petri et PLC, Rapport de Projet de Fin d'études de l'École d'Ingénieurs en Informatique pour l'Industrie (E31), Université de Tours, 1995, France.
-
(1995)
Rapport de Projet de Fin d'Études de l'École d'Ingénieurs en Informatique Pour l'Industrie (E31)
-
-
Cavalier, C.1
Jacquet, N.2
Richard, P.3
-
13
-
-
0025451308
-
An introduction to Prolog III
-
A. COLMERAUER, An introduction to Prolog III, Communications of the ACM, 1990, 33, (7), pp. 69-90.
-
(1990)
Communications of the ACM
, vol.33
, Issue.7
, pp. 69-90
-
-
Colmerauer, A.1
-
15
-
-
0004172037
-
-
Chapman et Hall
-
F. DICESARE, G. HARHALAKIS, J.-M. PROTH, M. SILVA and F. B. VERNADAT, Practice of Petri nets in manufacturing Systems, Chapman et Hall, 1993.
-
(1993)
Practice of Petri Nets in Manufacturing Systems
-
-
DiCesare, F.1
Harhalakis, G.2
Proth, J.-M.3
Silva, M.4
Vernadat, F.B.5
-
18
-
-
0002973186
-
Les problèmes d'ordonnancement
-
GOThA (Groupe d'Ordonnancement Théorique et Appliquée), Les problèmes d'ordonnancement, RAIRO-Operations Research, 1993, 27, (1), pp. 77-150.
-
(1993)
RAIRO-Operations Research
, vol.27
, Issue.1
, pp. 77-150
-
-
-
19
-
-
0024479894
-
Performance evaluation of job-shop systems using timed event graphs
-
H. HILLION and J.-M. PROTH, Performance evaluation of job-shop systems using timed event graphs, IEEE Transactions on Automatic Control, 1989, 34, (1), pp. 3-9.
-
(1989)
IEEE Transactions on Automatic Control
, vol.34
, Issue.1
, pp. 3-9
-
-
Hillion, H.1
Proth, J.-M.2
-
21
-
-
0028730693
-
Analysis of the behavior of a manufacturing cell with cyclic feeding policies
-
San Antonio
-
S. JULIA R. VALETTE and M. TAZZA, Analysis of the behavior of a manufacturing cell with cyclic feeding policies, IEEE-SMC, San Antonio, 1994, pp. 1683-1688.
-
(1994)
IEEE-SMC
, pp. 1683-1688
-
-
Julia, S.1
Valette, R.2
Tazza, M.3
-
22
-
-
0003075019
-
Optimal two- and three-stage production schedules with setup times included
-
S. M. JOHNSON, Optimal two- and three-stage production schedules with setup times included, Naval Research Logistic Quality, 1954, 1, (1), pp. 61-68.
-
(1954)
Naval Research Logistic Quality
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
23
-
-
0003988826
-
Sequencing and Scheduling: Algorithms and complexity
-
Amsterdam, The Netherlands
-
E. L. LAWLER, J. K. LENSTRA, A. H. G. RINNOOY Kan and D. B. SHMOYS, Sequencing and Scheduling: algorithms and complexity, Report BS-R8909, Center for Mathematics and Computer Science, Amsterdam, The Netherlands, 1989.
-
(1989)
Report BS-R8909, Center for Mathematics and Computer Science
-
-
Lawler, E.L.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
Shmoys, D.B.4
-
24
-
-
0028413979
-
Scheduling flexible manufacturing systems using petri nets, and heuristic search
-
D. Y. LEE and F. DICESARE, Scheduling flexible manufacturing systems using petri nets, and heuristic search, IEEE transactions on robotics and automation, 1994, 10, (2), pp. 123-132.
-
(1994)
IEEE Transactions on Robotics and Automation
, vol.10
, Issue.2
, pp. 123-132
-
-
Lee, D.Y.1
DiCesare, F.2
-
26
-
-
0028442512
-
Implementation of resource constraints in Ilog Schedule: A library for the development of constraint-based scheduling systems
-
C. LE PAPE, Implementation of resource constraints in Ilog Schedule: a library for the development of constraint-based scheduling systems. Intelligent Systems Engineering, 1994b, 3, pp. 55-66.
-
(1994)
Intelligent Systems Engineering
, vol.3
, pp. 55-66
-
-
Le Pape, C.1
-
27
-
-
0342497942
-
Characterization of feasible schedules for the flow-shop problem: A decomposition approach
-
IMSE'94, Grenoble
-
M.-L. LEVY, P. LOPEZ and B. PRADIN, Characterization of feasible schedules for the flow-shop problem: a decomposition approach, INRIA European Workshop on Integrated manufacturing Systems Engineering (IMSE'94), Grenoble, 1994, pp. 307-315.
-
(1994)
INRIA European Workshop on Integrated Manufacturing Systems Engineering
, pp. 307-315
-
-
Levy, M.-L.1
Lopez, P.2
Pradin, B.3
-
28
-
-
0037893750
-
Régime asymptotique des graphes d'événements temporisés généralisés : Application àun problème d'assemblage
-
A. MUNIER, Régime asymptotique des graphes d'événements temporisés généralisés : application àun problème d'assemblage, RAIRO-APII, 1993, 27, (5), pp. 487-513.
-
(1993)
RAIRO-APII
, vol.27
, Issue.5
, pp. 487-513
-
-
Munier, A.1
-
29
-
-
0024645936
-
Petri nets: Properties, Analysis and Applications
-
T. MURATA, Petri nets: Properties, Analysis and Applications, Proceedings of the IEEE, 1989, 77, (4), pp. 541-580.
-
(1989)
Proceedings of the IEEE
, vol.77
, Issue.4
, pp. 541-580
-
-
Murata, T.1
-
32
-
-
0003576234
-
-
Ph. D. Thesis, MIT, Cambridge, Project MAC-TR 120
-
C. RAMCHANDANI, Analysis of asynchronous concurrent systems by timed Petri nets, Ph. D. Thesis, MIT, Cambridge, Project MAC-TR 120, 1974.
-
(1974)
Analysis of Asynchronous Concurrent Systems by Timed Petri Nets
-
-
Ramchandani, C.1
-
33
-
-
0041664344
-
Resolution of scheduling problems by modelling with Petri nets and a transcription in CHIP
-
IMSE'94, Grenoble
-
P. RICHARD, J. L. BOUQUARD and C. PROUST, Resolution of scheduling problems by modelling with Petri nets and a transcription in CHIP, INRIA European Workshop on Integrated Manufacturing Systems Engineering (IMSE'94), Grenoble, 1994, pp. 317-323.
-
(1994)
INRIA European Workshop on Integrated Manufacturing Systems Engineering
, pp. 317-323
-
-
Richard, P.1
Bouquard, J.L.2
Proust, C.3
-
35
-
-
0029482072
-
Solving scheduling problems using Petri nets and constraint logic programming
-
ETFA'95, Paris
-
P. RICHARD, C. CAVALIER, N. JACQUET and C, PROUST, Solving scheduling problems using Petri nets and constraint logic programming, INRIA/IEEE International Symposium on Emerging Technologies and Factory Automation (ETFA'95), Paris, 1995b, 9 p.
-
(1995)
INRIA/IEEE International Symposium on Emerging Technologies and Factory Automation
-
-
Richard, P.1
Cavalier, C.2
Jacquet, N.3
Proust, C.4
-
36
-
-
11744258926
-
Ordonnancement d'atelier en temps réel d'Orabaid àOrdo
-
ROUBELLAT, J. C. BILLAUT and M. VILLAUMIÉ, Ordonnancement d'atelier en temps réel d'Orabaid àOrdo, Proceedings, journées d'études Ordonnancement et entreprises: applications concrètes et outils pour le futur, CNRS/GdR Automatique/SED/GT3, Toulouse, 1994, pp. 213-253.
-
(1994)
Proceedings, Journées d'études Ordonnancement et Entreprises: Applications Concrètes et Outils pour le Futur, CNRS/GdR Automatique/SED/GT3, Toulouse
, pp. 213-253
-
-
Billaut, R.J.C.1
Villaumié, M.2
-
38
-
-
27844432869
-
On the Srikar-Gosh MILP model for the NxM SDST flow-shop problem
-
E. F. STAFFORD, F. T. TSENG, On the Srikar-Gosh MILP model for the NxM SDST flow-shop problem, International Journal of Production Research, 1990, 28, (10), pp. 1817-1830.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.10
, pp. 1817-1830
-
-
Stafford, E.F.1
Tseng, F.T.2
-
39
-
-
0020816005
-
Sequencing on two and three machines with setup, processing and removal times separated
-
D. R. SULE, K. Y. HUANG, Sequencing on two and three machines with setup, processing and removal times separated, International Journal of Production Research, 1983, 21, (5), pp. 723-732.
-
(1983)
International Journal of Production Research
, vol.21
, Issue.5
, pp. 723-732
-
-
Sule, D.R.1
Huang, K.Y.2
-
40
-
-
85030074129
-
A high level Petri nets model of generalized dynamic job-shop
-
IMSE'94, INRIA, Grenoble
-
C. VALENTIN, L. M. AGUILERA, P. LADET and Z. BINDER, A high level Petri nets model of generalized dynamic job-shop, European Workshop on Integrated manufacturing Systems Engineering (IMSE'94), INRIA, Grenoble, 1994, pp. 273-280.
-
(1994)
European Workshop on Integrated Manufacturing Systems Engineering
, pp. 273-280
-
-
Valentin, C.1
Aguilera, L.M.2
Ladet, P.3
Binder, Z.4
-
42
-
-
11744301398
-
Extension de la PLC pour le traitement des contraintes sur les séquences
-
Rabat
-
H. ZIDOUM, P, BAPTISTE and B. LEGEALRD, Extension de la PLC pour le traitement des contraintes sur les séquences, MSCEAI'94, Rabat, 1994, pp. 285-294.
-
(1994)
MSCEAI'94
, pp. 285-294
-
-
Zidoum, H.1
Baptiste, P.2
Legealrd, B.3
-
43
-
-
0026204001
-
Parallel and sequential mutual exclusions for Petri net modelling of manufacturing systems with shared resources
-
M. C. ZHOU and F. DICESARE, Parallel and sequential mutual exclusions for Petri net modelling of manufacturing systems with shared resources, IEEE transactions on Robotics and Automation, 1991, 7, (4), pp. 515-527.
-
(1991)
IEEE Transactions on Robotics and Automation
, vol.7
, Issue.4
, pp. 515-527
-
-
Zhou, M.C.1
DiCesare, F.2
|